Status of the ESS High Power RF Systems

Slides:



Advertisements
Similar presentations
Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
Advertisements

ESS LLRF System Anders J Johansson.
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
Wir schaffen Wissen – heute für morgen 24 August 2015PSI,24 August 2015PSI, Paul Scherrer Institut Status WP 8.2 RF Low Level Electronic Manuel Brönnimann.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
High Power RF Systems, Control and Distribution in the HINS Alfred Moretti, Brian Chase, Chris Jensen and Peter Prieto Fermilab Accelerator Advisory Committee.
Anders Sunesson RF Group ESS Accelerator Division
ESS LLRF and Beam Interaction. ESS RF system From the wall plug to the coupler Controlled over EPICS Connected to the global Machine Protection System.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Alex Zaltsman Power Amplifiers and LLRF.
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 17 th December 2013.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
H. Danared | TB12, 5 Mar 2015 | Page 1 Håkan Danared Mats Lindroos Lund, 5 March 2015 Status of In-Kind Contributions to Accelerator.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
High Voltage modulators ESS developments Carlos A. Martins ESS Accelerator Division, RF electrical power systems.
ESS Cooling System - Interface with RFQ 1 John Jurns Cooling System Engineer.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
Chapter Editor: John Weisend TDR Chapter 6 Cryogenic System, Vacuum System & Test Stands.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
PSB and PS test systems status. M. Haase September 14 th Finemet Review.
S A Griffiths CM42 June 2015 Electrical & Control.
ESS LLRF and Beam Interaction
RF Systems and Controls for the LERF CM Tests
Bruno POTTIN, Anne-Catherine CHAUVEAU
RF cell Anders Sunesson RF group leader
Cryomodule test stand at ESS site
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
Solid State Amplifier Development at PSI
WP5 Elliptical cavities
ESS cavity procurement via in-kind contributions
Uppsala Commitment to ESS and FREIA Planning
Overview and System Design for ESS LLRF Systems
LLRF for ESS: Requirements and System design
Test plan of ESS HB elliptical cavity
Rihua Zeng RF Group, Accelerator Division, ESS ERIC Oct 29, 2015
ESS RF Development at Uppsala University
Cryogenic C&C Scope of work
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
First High Power Test of the ESS Double Spoke Cavity package
SPOKE Cavities frequency preparation plan and RF control procedures
RF Distribution for Warm Linac
RF Local Protection System
LO BOX and LO/CLK DISTRIBUTION Arash Kaftoosian ESS Bilbao, May 2018.
FAIR pLinac RFQ Meeting pLinac RF Power Sources
RF systems introduction
Plan for controls with the digital platform
HIGH POWER AMPLIFIERS For WARM LINAC Arash Kaftoosian
ESS Bilbao RF Systems Overview Pedro J. González
Ciprian Plostinar Workshop on Testing and Commissioning
Daresbury ESS In-Kind Contributions
Krzysztof Czuba ESS LLRF Quarterly Meeting
Risk, Schedule, Deliveries
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
Licensing requirements for Cryomodules
Introduction CDR Normal Conducting Linac LLRF
MTA Atomki In-kind Contribution RadioFrequency Local Protection System
Elettra – Sincrotrone Trieste S.C.p.A.
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
European Spallation Source ERIC
Phase reference RF work
Plan for early Operation
RF introduction Anders Sunesson RF group leader
Status & Schedule for ESS TS2
Charge and Agenda of the 18th TAC meeting
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Accelerator Installation Schedule
Project Support Meeting January 9, 2019
Presentation transcript:

Status of the ESS High Power RF Systems Rihua Zeng, On behalf of Morten Jensen (RF section leader) and all RF section colleagues SHLIPP8, June 13, 2018 www.europeanspallationsource.se

Outline RF systems highlights and status : Status of each subsystem Ongoing RF section installation activities(klystron gallery, tunnel, TS2) High Power RF Amplifiers Local Protection system/Interlock Low Level RF system Status of each subsystem

Highlights: RF Installation, Deliveries and Test Activities

Highlights: RF section Installation, Test Activities in Klystron Gallery All Spoke supporting structures have been installed, MB&HB supporting structures have been delivered. 27 352MHz loads, 26 352MHz Circulators, 71 704MHz loads has been delivered to G02 and complete site acceptance tests

Highlights: RF Installation and Test Activities in TS2 CPI Klystron is ready to be powered up…. Toshiba klystron and interlock system operational for HB cavity testing in Uppsala (see presentation from Magnus) Racks are being used to trial the installation and to see how we optimise power distribution, mechanical supports, cable routing, grounding etc.

RF LPS User Interface in TS2 CPI Klystron: Interlocks tested and devices run up to ”STBY” state. R. Montano

Highlights: RF Section Installation, Test Activities in Tunnel 119 rigid line sections with heating cables, Temperature sensors thermal insulation jacket Installation in Tunnel Install hanging system Assembly heating cables, temperature sensors, thermal insulation Install rigid line sections, couplers, and cable tray What it looks like after installation: ~500m PRL line installed from ion source to Dogleg ~100m PRL line remain to be installed this year from Dogleg to A2T 53 directional couplers ~500m-long cable tray

Highlights: RF Section Installation & Test Activities in Tunnel

RF Cell Block Diagram

Cable Database, Rack Layout, Electrical Schematics Detailed information for 14, 325 RF cables already in now database … … Electrical schematic drawing for rack installation

Status: High Power RF Amplifiers Medium beta klystrons orders placed for 36 klystrons, from Toshiba and CPI First klystron on 21st June. Driver amplifiers for MB Design review and first FAT is done with R&S 1st delivery scheduled Prototype measured and report done ESS Bilbao NC klystrons Has three klystrons High voltage conditioning started Tendering for three more

Toshiba FAT, some results

Status: Interlock Three SIM prototype modules ready ATM Atomki at FREIA 2 by ESS ERIC, one in Lund (TS2) Two FIM prototypes under development/test 1x in TS2 and 1x at ESS labs All systems fully EPICS integrated

Status: Splitter box, E- Pick up and Pin diode Installation on going on TS2 Integration on ICS platform (ICS support) Series production by PEG

Status: LLRF LLRF system has been running in two test systems in Lund and two in Uppsala/Freia for some time. The system will be used for cavity tests in Sweden and France Main digitiser boards have been updated to latest version of FPGA hardware, and now have a newly developed AXI-framework running Additional modules being developed by in-kind partners in Poland have reached CDR status Procurement of first parts for final master oscillator version has started

LLRF: Hardware and FPGA Programming Christian Amstutz is guiding FPGA programming for the accelerator division, with contributions from Poland, Spain and beam instrumentation Developing common FPGA Firmware Framework Porting of LLRF Firmware to Kintex Ultrascale FPGA https://confluence.esss.lu.se/display/RFG/AXI-based+FPGA+Framework

RF Technical Lab at Site Office

RF Turn on Procedures Work together with SRF, RFQ and DTL Mile stones in 2018/2019: Optimum coupler conditioning procedures has been tested in Uppsala, next step is to implement in LLRF&EPICS Transfer from SEL loop to Feed forward driven mode Transient beam-loading RF tune-up procedures

Thank you