Jürgen Neuhaus Dept. sci. director

Slides:



Advertisements
Similar presentations
6th International Workshop on Sample Environment at Neutron Scattering Facilities September 29th to October 1st 2010 First Announcement State-of-the-art.
Advertisements

Software Engineering für betriebliche Informationssysteme (sebis) Fakultät für Informatik Technische Universität München wwwmatthes.in.tum.de WebAppLabCourse.
Where Next for Wind? Explaining national variations in wind power deployment Richard Cowell School of City and Regional Planning, Cardiff University 4.
Instrument Space Requirements Rob Connatser Chief Instrument Project Engineer November 2014.
Overview of the ARCS Project Plan: The View at One Year Doug Abernathy ARCS Instrument Scientist ARCS IDT Meeting Lujan Center, LANL September 30, 2002.
Date Instrument Systems ORNL SEQUOIA Overview Garrett Granroth (Instrument Scientist) David Vandergriff (Lead Engineer) ARCS/SEQUOIA IDT meeting March.
Interfaces with the SNS Project for the ARCS Instrument Doug Abernathy ARCS Hardware Project Manager ARCS Construction Project Review DOE Germantown Aug.
HYSPEC Instrument: Status and Performance M. Hagen Neutron Facilities Development Division, SNS, Oak Ridge National Lab. W.J. Leonhardt and A. Ruga Condensed.
Performance of the new high flux neutron source FRM-II IGORR10, Gaithersburg, 13. September 2005 Physics Department FRM-II Winfried Petry, Technische Universität.
Mitglied der Helmholtz-Gemeinschaft ZEA-1 | Technology for Excellent Science SKADI - Report FZJ Meeting Lund Romuald Hanslik FZJ/ZEA-1 1.
HYSPEC HYSPEC: A High Performance Polarized Beam Hybrid Spectrometer at the SNS Beamline 14B I.Zaliznyak 1, S. Shapiro 1, L. Passell 1, V. Ghosh 1, W.
Status of JRA6 - MCNSI Kim Lefmann NMI3, ISIS, 28/9-05.
September 10, 2004 Experimental Facilities Division SING Project Status HYSPEC IDT Meeting John Haines SING Project Manager September 10, 2004.
Neutron Chopper Technologies Work Package
Neutron Scattering Group February, 2001 A High Performance Instrument for the Single Crystal Spectroscopy at the Pulsed SNS. n What is the spectrometer.
NMX Instrument Layout and End-station Giuseppe Aprigliano Lead Instrument Engineer NMX IKON 7 September 15 th, 2014.
EVM: 28 th June, Jurgen De Jonghe Collaborative Project Progress Tracking and Earned Value Management Jurgen De Jonghe IT-AIS
HYSPEC IDT HYSPEC: Our Instrument at the Spallation Neutron Source. Outline Spallation Neutron Source (SNS) and the BNL Overview of the SNS instrument.
Data Management and Software Centre Mark Hagen Head of DMSC IKON7, September 15th 2014.
ESS Annual Review Science Directorate - Dimitri Argyriou The challenge for 2016: Matching instrument scope with budget Andreas Schreyer European Spallation.
Electrical Engineering for NSS - Status and Planning- Thomas Gahl Electrical Engineering Group Leader February 26, 2014.
IKON6 Lund, February 26 th 2014 Jim Yeck CEO & Director General.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Overview of the Neutron Instrument Construction Project Shane Kennedy NSS Project Leader, ESS IKON 10, Düsseldorf, 16 February.
Werner Schweika, Nicolo Violini, Earl Babcock Michael Meissner Andreas Houben, Philipp Jacobs Gunnar Svennson, Xiaodong Zou, Niklas Hedin, Mats Johnsson,
Phase 1 Design for LOKI at ESS: performance evaluation of suitable detector technologies Or how to build detectors for ESS Kalliopi Kanaki Andrew Jackson.
Interfacing instrument teams with ESS and STAPs Ken Andersen ICB5, Copenhagen 7 th March 2016.
October, 2001 Hybrid Spectrometer for Single Crystal Studies at the Pulsed SNS: an update. n Principal features of the proposed hybrid spectrometer. n.
Instrument Construction Phase 1 and beyond Rob Connatser Chief Instrument Project Engineer September, 2014.
ESS Annual Review Science Directorate - Dimitri Argyriou ESS update Andreas Schreyer Director for Science European Spallation Source ERIC Engineering STAP.
ESS Annual Review Science Directorate - Dimitri Argyriou Science Directorate Update Andreas Schreyer European Spallation Source ERIC Instrument Collaboaration.
Rob Connatser NSS Instrument Work Packages and XLPM.
The ESS Target Station F. Mezei ESS target division NPPatLPS, 2013.
Making Difficult Decisions in a Transparent Way –
Neutron Detector Systems at ESS
Welcome & Charge for the Meeting
Development of LCLS Far Experimental Hall Hutches
ESS Freia Scope Setting ESS - Lund - 17/10/2016.
Software for Neutron Imaging Analysis
Way of working with ICS HWI Hardware and Integration
NSS Instrument Project Tollgate Coordinator
Action List.
ICS update 7th Experiment Control Workshop
STAP meeting for Imaging & Engineering October CHARGE & Organization
Remote Handling Workshop Introduction
The Common Shielding Project
Future Projects and Reporting
Afonso Mukai Scientific Software Engineer
MET Session workshop Job description Integration Engineer
Imaging & Engineering STAP Meeting 12th-13th of April 2018
PSI: M. Morgano, M. Strobl TUM: E. Calzada, M. Lerche, M. Schulz
IKON 15 Talal Osman & Iain Sutton
BEER – General Update Nuclear Physics Institute CAS Přemysl Beran
Welcome Update on ESS Construction Project
Charge for CSPEC Detector Construction Workshop
NSS integrated installation plan workshop Introduction
Bunker Project Operation aspects
Spectroscopy STAP Meeting ESS, 8th of April 2019
Scope Setting Meeting MIRACLES
Moderators and CREMLIN Plus
Instrument Software - ODIN
Feedback from Instrument Teams at IKON14
Imaging & Engineering Diffraction STAP Meeting ESS, 21th of March 2019
CSPEC Detector Kick-off Meeting Project Governance 18 January 2018
Feedback from IKON 14 Spectroscopy.
Test Beamline System Requirements and Charge to PDR Committee
BEER cave design and shielding
Bunker Critical Design Review Welcome & Charge
Reflectometry STAP Meeting ESS, 29th of April 2019
Welcome and Charge for the Meeting
Presentation transcript:

Jürgen Neuhaus Dept. sci. director Technische Universität München Forschungs-Neutronenquelle Heinz Maier-Leibnitz (FRM II). Jürgen Neuhaus Dept. sci. director www.europeanspallationsource.se 19-07-02

C-SPEC TUM ; LLB PROGRESS SINCE LAST ICB CURRENT ISSUES CORE TEAM Lead scientist : Pascale Deen (ESS for TUM) Lead engineer: Joseph Guyon Le Bouffy(LLB) W3 : C-SPEC PROGRESS SINCE LAST ICB Start of Phase 1 Guide & Chopper system optimization Engineering design incl. shielding underway CURRENT ISSUES Budgetary quotes for detectors, chopper system and guide system Scope-setting: 2016-10-07 Tollgate 2: 2017-01

ODIN TUM, PSI CORE TEAM PROGRESS SINCE LAST ICB CURRENT ISSUES Lead scientist : Michael Lerche (TUM) Lead engineer: Elbio Calzada Instrument scientist : Manuel Morgano (PSI) PROGRESS SINCE LAST ICB Team complete (June 1st 2016) Moderator design changes reset the guide design Optional curved guide design in progress Straight bi-spectral neutron guide design near completion CURRENT ISSUES Shielding in general, forward scattering of relativistic neutrons, streaming Massive shutter design: requirements Scope-setting: 2016-10-05 Tollgate 2: early 2017

CONSENSE (Spin Echo) FZ Jülich, TUM CORE TEAM Michael Monkenbush (FZJ), Robert Georgii (TUM) Still in proposal phase PROGRESS SINCE LAST ICB STAP meeting on September, 16 Basic design of a hybrid instrument (NSE + NRSE) under study Decision of acceptance 2017 CURRENT ISSUES TUM part of proposal phase pre-financed FZJ part of proposal phase pre-financed Proposal acceptance: 2017-12-01 Scope-setting: 201x-xx-xx Tollgate 2: 201x-xx-xxx