Test beam with Pixel modules

Slides:



Advertisements
Similar presentations
20 January 2011R&D staf meeting - Jan T.1 Activities in 2010 at DESY test beam 4-chip/Ingrid tests in March; 3 days OK Single Ingrid tests in May combined.
Advertisements

Tracking with capillaries – Neutron & GRA radiography 1.Fist test with 2 targets is made in December 2.Analysis in progress 3.Test on monochromatic neutron.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
1 Pixel readout for a LC TPC LCWA 2009 – Detectors Tracking session 30 September 2009 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
Zeuthen, January 16, 2008 P. Colas - LP cosmic trigger 1 The cosmic trigger for the Large Prototype Th. Chaminade, P. Colas, K. Dehmelt, M. Karolak, G.
1 November 18, 2014 DOE SC-OPA Review of 12 GeV ENC vs. preamp load FSSR2 by FNAL Single chip on a PCB Load from capacitors SVT module testing.
CMS FPIX Reinstallation/Commissioning Lorenzo Uplegger 4/20/091.
Gaseous Tracking (TPC) Summary LCWT09 Nov. 5, 2009 LAL, Orsay Takeshi MATSUDA DESY/FLC 1.
1 Pixel readout for a TPC LCWS 2010 – Tracking TPC R&D session 27 March 2010 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay groups.
PSD upgrade: Ar-present and Xe-future 1.- Status of the PSD upgrade 2.- PSD performance after upgrade 3.- Problems during the Ar-run 4.- Future scenarios.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
1 Daniel Dobos University Dortmund Pixel Testbeam July 2003 Daniel Dobos University Dortmund – E4 ATLAS-/Si-Meeting Pixel Testbeam July.
Taikan Suehara, SiECAL meeting in Tokyo, 10 Sep page 1 Status of DAQ development for ILD-SiECAL in Kyushu (and more) Taikan Suehara (Kyushu University,
you me  when it all started to work  progress made  outlook.
1 Update on Silicon Pixel Readout for a TPC at NIKHEF LCWS08 - Chicago 19 Nov 2008 Jan Timmermans NIKHEF.
PSD upgrade - schedule/resources: electronics and cooling system F. Guber INR, Moscow NA61/SHINE upgrade workshop, CERN 3– 5 March, 2014.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
1 The Silicon TPC System EUDET Extended SC meeting 31 August 2010 Jan Timmermans NIKHEF/DESY.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
Bump-bonding: offers F. Marchetto INFN-Torino Technical specification doc has been prepared: Ferdinand, myself, with the help of Alex, Petra and Massimiliano.
Micromegas (Ingrid)+TimePix 8-chip modules
1 The Silicon TPC System EUDET Extended SC meeting 1 September 2008 Jan Timmermans NIKHEF.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
Tracking in a TPC D. Karlen / U. Victoria & TRIUMF for the LCTPC collaboration.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
GEM+Timepix2 in the framework of project Gabriele Croci, Matteo Alfonsi on behalf of CERN-GDD Group RD51 Miniweek, February 2010.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
P. Colas, Endplates 1 LP phone meeting, May 9, 2006 Large Prototype Endplate(s)
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 11 December 2012 LAV construction & installation status.
1- Handling The Olympus GEMs at MIT-BATES between June 6th-August 8th Manufacturing The GEMs at HU-GEM LAB since Sep 2010 OZGUR ATES HAMPTON UNIVERSITY.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
1 TPC Large Prototype (LP) Beam Tests Jan Timmermans NIKHEF/DESY (for LCTPC Collaboration) ALCPG 2011, Eugene.
Timepix test-beam results and Sensor Production Status Mathieu Benoit, PH-LCD.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
InGrid detector news A.Chaus, D. Attie, P. Colas, M. Titov, CEA Salay.
1 Stony Brook Update: Power Surprise… T.K. Hemmick for the Tent Crew.
On behalf of the LCTPC collaboration -Uwe Renz- University of Freiburg Albert-Ludwigs- University Freiburg Physics Department.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 5 January 2013 LAV construction & installation status.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
The PSD at Pb-Pb run PSD drawbacks at Ar beam
High efficiency work and MBK development for accelerators
Some input to the discussion for the design requirements of the GridPixel Tracker and L1thack trigger. Here are some thoughts about possible detector layout.
Pixel panels and CMOS Read-out electronics
Introduction Status before the 2009 run Results from the 2009 run
Progress with pixelised readout of gaseous detectors
Complementary ISTC Projects #3888, 3889p
Application of VATAGP7 ASICs in the Silicon detectors for the central tracker (forward part) S. Khabarov, A. Makankin, N. Zamiatin, ,
The report on the IBR-2 modernization
Johannes Leidner, Fabrizio Murtas, Marco Silari
Progress with pixelised readout of gaseous detectors
The ISOLDE Solenoidal Spectrometer project
TK Upgrade report.
Work packages status in Torino and perspectives
TPC Paul Colas Technical meeting, Lyon.
Associate College Partnership Conference
Angela Gligorova on behalf of the AEgIS and Medipix collaborations
BESIII RPC Detector Jiawen Zhang
Technische Universität München
OT Survey & Adjustment Outline: Survey technique at present
TPC chamber for Medipix2/TimePix
Lucius Skid Pics
EUDET Extended SC meeting 31 August 2009
SALTRO16 activities in Lund
May is Coming !!! January 31st: Project approval (16 days from now) • Brainstorming, team formation, successful RFA February 7th: Project proposal (+7.
DESY test beam report: March 2019
Presentation transcript:

Test beam with Pixel modules

Aims 2 Modules: 3 GEMs with 8 Timepix chip 8 InGrids Readout is SRS based Possibly with water cooling Production started in January, first parts were delivered in February But central parts had to be diffusion welded at external workshop. This took longer than expected and there were some problems. We got the last part (for the InGrid module) only 3 days before the test beam.

GEM-Module 2 Oktoboards with bare Timepix chips produced and tested Modules is assembled GEMs tested (500 V @ N2 -> 0.7 nA leakage current) 380 V @ Ar:iButane 95:5 stands for ~30 min.

What happend to the InGrid Module

Assembley of InGrid Module

Inserting the module in LP Everything went well, so we decided to leave the InGrid module in and test it first.

Schedules sofar 21.4. Inserted InGrid module in LP, starting to flash gas (T2K) 22.4. everything set up, started to learn how to handle beam/PCMAG -> killed power supply of readout electronics (too close to magnet) 23.4. replaced power supply, saw first tracks 24.4. equalizing the chips (problems with chip 7 and 8) 25.4. finishing euqalization, adjusting beam, placing SRS at better position 26.4. started data taking (voltage scan)

Position of SRS

Events

Thanks to everyone who was helping!