Application of Proposed New BES Definition:

Slides:



Advertisements
Similar presentations
Non spontanee spontanee  G>O  G
Advertisements

P A C I F I C C O N C O U R S E D R. S U I T E L O S A N G E L E S, C A P | F | E I.
Windenergy. BLOW : 50 MW in 2010; result-obligation Province is in charge of the régie Stimulate development plans before In co-operation with.
Wind Turbine Power Plant. Sources ●
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
North Coast Wind Farm Tolano Environmental Consulting.
海港自由貿易港區及自由經濟示範區之加值作業
Indiana Municipal Power Agency Joint Ownership Raj Rao, President Indiana Municipal Power Agency APPA Joint Action Workshop January 10, 2006.
EXAMPLE FORMULA DEFINITION 1.
Power Tower Renewable Energy For Botswana CONTENTS POWER TOWER PROJECT
1st call results.
Ascending to IED compliance
Tracking New Coal-Fired Power Plants
GC0096 Electricity Storage Grid Code Requirements
Generation Resource Energy and Regulation Deployment Performance Report for June 2017 QMWG 07/10/2017.
Non-IRR GREDP < 85% August 2017
GC0087 Frequency Response Provisions
CCS and the Environment
Topic #2 Ecosystems at Risk.
DWG Meeting March 7, 2017 (Update to a Meeting held July 26, 2016)
Introduction to Differential Equations
Engineering Technology Division
Arithmetic Sequences January 26, 2017.
Experimental Design.
San Luis Potosi – New plant MAY 8TH 2015
RAPEX Natalie CHEVALLIER
System Thinking.
Evolving Economic Dispatch in SPP
סמים וסינפסות.
Creating a Low-Carbon Future …A Framework for Action
Opening Activity: Feb. 2, 2016 List examples of burning fossil fuels.
Ascending to IED compliance
WIND TURBINE GENERATORS.
Wind Industry Market and Policy Overview
Energy use in Canada Canada ranks second in the world in energy use per person. Why do you think we use so much energy?
Expert Group on Quality of Life Indicators
Types of Managers.
Load Forecast and Base Case Development
Ecosystems.
Ecosystems.
Holy Cross Energy CREA Energy Innovations Summit 2016
Load Forecast and Base Case Development
Management of product authorisations for in situ generated AS : where are we? CA-July18-doc.4.5 5th July - Brussels.
Vocabulary Review Topic.
THE PUBLIC CONSULTATION
Student Name: Student Id: Supervisor’s Name:
Summer School Social Being a good Citizen.
Process Skills - Variables
Thinking Green Alternative Energy.
Process Skills - Variables
Each player can remove 1 or 2 pegs. Player who removes the last peg wins
Goal, Objectives, Expected Outcomes
Proposed Changes Garry Hinkley (ME)
Coexistence CG “To Do”s In Making a Recommendation
Capacity Market Code Modifications
Status of Channel Models
Probabilistic Volatility in the Western Interconnection
BR 8-22.
Notes: Biotic and Abiotic Factors
Diagnosis Definition:
420, , , ,000 1,300,000 One commercial 680, , ,000 1,200,000 1,800,000 Two commercial 680,000.
Management and organization
IFTA Final Report Public View Proposal.
Herbal Plants.
420, , , ,000 1,300,000 One commercial 680, , ,000 1,200,000 1,800,000 Two commercial 680,000.
Contingency Plan for the March/April, 2006 possible power shortage
Malignant ascites (n = 10) Non-malignant ascites (n = 9)
NS4960 Summer Term 2019 Natural Gas Processing
Wind Power.
Presentation transcript:

Application of Proposed New BES Definition: U.S. Generation (Summer Rating, 2009 EIA-860) BES Plants: >75 MW 962,564.3 Total MW Non-BES Plants: < 75 MW 62,836.1 Total MW Units: > 74.9 MW Units: 20-74.9 MW At BES Plants: 3,580 Units 841,716.5 MW 82.1% of total MW At BES Plants: 2,451 Units 110,970.5 MW 10.8% of total MW At Non-BES Plants: 901 Units 30,978.2 MW 3.0% of total MW Units: 0-19.9 MW At BES Plants: 990 Units 9,877.3 MW 1.0% of total MW At Non-BES Plants: 9,748 Units 31,857.9 MW 3.1% of total MW