SD5953 Successful Project Management REVIEW 07

Slides:



Advertisements
Similar presentations
CP Chapter 4 Schedule Planning.
Advertisements

Work Breakdown Structures
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
Network Analysis and Duration Estimating Kathy S. Schwaig.
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
Creating the Project Plan
CS3500 Software Engineering Project Management (1) In 1986 one well-known software engineer (Tom DeMarco) made the simple but important observation: “You.
Manjari Akella Pranava Nagpal B-Tech(CSE) 4 th Year.
BSBPMG503A Manage Project Time 6.5 Develop Schedule The process of analysing activity sequences, durations, resource requirements and schedule constraints.
Project Management Techniques.
ELC 347 DAY 8. Agenda Questions Assignment 3 Corrected  4 A’s, One non-submit Assignment #4 Due Capstone Proposal Due Group Progress report due Exam.
Project Time Management
Project Time Management
The Critical Path – Precedence diagram method Luise Lorenz Christina Mohr.
INTRODUCTION TO PROJECT MANAGEMENT. WHAT IS A PROJECT? “A planned undertaking of related activities to reach an objective that has a beginning and an.
Prof. Roy Levow Session 8.  Steps in Closing a Project  Getting Client Acceptance  Installing Project Deliverables  Documenting the Project  Post-Implementation.
Lecture 3 Scheduling CSCI – 3350 Software Engineering II Fall 2014 Bill Pine.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
Lean Project Management
Quick Recap.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 7 Project Manager’s Toolkit for Time Management.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Project Time Processes – Part 2 C ertificate IV in Project Management
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Pegasus Project Management: Resource Factors November 8, 2001 MBA 253 The Pegasus Group: Mario RossoMario Rosso Phil RandolphPhil Randolph.
Project Management Inspections and Reviews 1 February.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
BSBPMG503A Manage Project Time Manage Project Time Project Time Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit Code.
MANAGEMENT of INFORMATION SECURITY, Fifth Edition.
CRITICAL PATH METHOD - PRECEDENCE DIAGRAMS - SANDEEP DIGAVALLI.
Chapter 16 – Project Management
Critical Path Analysis (CPA)
Project Management module
Introduction to Project Management Chapter 7 Managing Project Resources Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Project Scheduling Lecture # 1.
The value of a project-oriented approach to IT and how we do it in IBM
Activity Planning.
CHAPTER 6 PROJECT TIME MANAGEMENT
Critical Path Method (CPM). Background & History Developed in the 1950s by the US Navy & Du Pont. Originally, the critical path method considered only.
Teaching slides Chapter 3.
Project Scheduling: networks, duration estimation, and critical path
SE Tasks for a Concept Development Project
Prepared by Lee Revere and John Large
Project Time Management
PROJECT MANAGEMENT (BSBI 622)
Project Time Management
Project Management CPM/PERT Professor Ahmadi.
Fine-Tuning your plan and obtaining approval
Teaching slides Chapter 13
Project Time Management
SD5953 Successful Project Management Work Breakdown Structure
Project Time Management
SD5953 Successful Project Management Predecessors and Successors
Importance of Project Schedules
SD5953 Successful Project Management STATUS TRACKING & REPORTING
SD5953 Successful Project Management THE CRITICAL PATH METHOD
SD5953 Successful Project Management LAB D
SD5953 Successful Project Management ASSIGNMENTS, ESTIMATES & COSTS
CAD DESK PRIMAVERA PRESENTATION.
SD5953 Successful Project Management LAB 05
SD5953 Successful Project Management LAB 6B
Project Time Management
SD5953 Successful Project Management LAB 6A
SD5953 Successful Project Management REVIEW 05
CHAPTER 6 PROJECT TIME MANAGEMENT
SD5953 Successful Project Management CLOSING A PROJECT
SD5953 Successful Project Management AGILE SOFTWARE DEVELOPMENT
Presentation transcript:

SD5953 Successful Project Management REVIEW 07 School of Design The Polytechnic University of Hong Kong

Please sit with the members of your final group project IMPORTANT Please sit with the members of your final group project

Graham Leach, Instructor www.graham-leach.com polyusd5953@gmail.com

What is a Critical Path? In project management, a critical path is the sequence of project network activities which add up to the longest overall duration. This determines the shortest time possible to complete the project. Any delay of an activity on the critical path directly impacts the project completion date and is to be avoided if possible. A project can have several, parallel, near critical paths. An additional parallel path through the network with the total durations shorter than the critical path is called a sub-critical or non-critical path. http://en.wikipedia.org/wiki/Critical_path_method

Where Does CPM Come From? The critical path method (CPM) is a project modeling technique developed in the late 1950s by Morgan R. Walker of DuPont and James E. Kelley, Jr. of Remington Rand. Kelley attributed the term "critical path" to the developers of PERT, which was developed for the U.S. Navy nuclear sub program. The precursors of what came to be known as Critical Path were developed and put into practice by DuPont between 1940 and 1943. The CPM made a significant contribution to the success of the Manhattan Project. http://en.wikipedia.org/wiki/Critical_path_method

What Does the Critical Path Require? Here’s how to generate a Critical Path: List all of the activities required to complete the project. This is typically done via a Work Breakdown Structure. Create a closed dependency map between the activities without any “dead ends”. Supply the estimated duration of each activity. http://en.wikipedia.org/wiki/Critical_path_method

How Does a Critical Path Work? The Critical Path Method locates and calculates the longest chain of dependent tasks within the project. It identifies the earliest and latest times that each task on that chain can start and finish without having the effect of extending the project. The tasks that lie along this longest path are "critical“. The tasks not on the “critical” path are said to be in the "total float“ of the project. They may be delayed without making the project any longer. http://en.wikipedia.org/wiki/Critical_path_method

Avoiding Mistakes & Accelerating Results The best way to avoid making mistakes and accelerating the utility of the Critical Path Method is to: Follow an accepted, standardized Project Management methodology such as that of Project Management Institute (PMI). This course is based on the PMI Project Management Body of Knowledge (PMBOK). 2. Use a project management software that supports the principles of the PMBOK as well as PERT / CPM. This course uses Microsoft Project, which meets that purpose.

QUESTIONS?

Why Do We Track & Report Projects? The reason why we track and report on projects is because they never unfold according to the way we plan them. Ever. There is simply no way for a Project Manager to be able to foresee what is going to happen - not just to the project, but also to the global business environment, the company or even the individual people participating in the project. Tracking & Reporting on Projects is the tool we use to adjust for the inevitable changes that will confront Project, so we can stay focused on the goal – with is a successful conclusion.

The Project Baseline To manage anything you must be able to measure changes to it. A project “baseline” provides the basis for this by freezing the original project configuration in a “snapshot”. This “baseline” is then regularly compared to REALITY. Deviations are attributed and measured in terms of how they impact the project. In other words, they are managed. The baseline gives us a tool to measure the quanta of change, a way to steel ourselves for inevitable changes and a way to decide on optional changes we are going to undertake.

Managing Deviations from the Baseline When change does arrive - and it will, guaranteed - there are two critical activities that must immediately be undertaken. The project plan needs to be updated to reflect the impact of the change. Resource allocations, tasks and timing should be double-checked and The Critical Path then recalculated. Everyone affected needs to be informed, the pace of which is usually driven by the scale of the impact. Small impacts need only be mentioned at regular meetings. Big impacts usually require a special Project meeting.

Blame One of the unfortunate consequences of the inevitability of change that besets every Project is the consequence that NO project of any respectable size goes 100% “according to plan”. A LOT of projects are very negatively affected by the changes that come upon them. Change very seldom makes a project faster, easier or cheaper. Normally, it’s the reverse. So, projects always go over budget somewhere. It’s when they go WAY over budget that the baseline starts getting used as a blame tool. This is because it is no longer seen as a valid management tool.

QUESTIONS?

THANK YOU