TGad January 2009 Closing Report

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0065r2 Submission January 2009 Eldad Perahia, Intel CorporationSlide 1 VHT SG January 2009 Report Date: Authors:
Advertisements

Doc.: IEEE /0173r0 Submission January 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG January 2015 Closing Report Date: Authors:
Doc.: IEEE /0707r0 Submission May 2011 Minyoung Park, Intel Corp.Slide 1 Overview on TGah Specification Framework Development Date:
Doc.: IEEE /1445r1 Submission TGad November 2011 Closing Report November 2011 Eldad Perahia, Intel CorporationSlide 1 Date: Authors:
Doc.: IEEE /0393r1 Submission March 2008 Eldad Perahia (Intel)Slide 1 Orlando Liaison Report Date: Authors:
Doc.: IEEE /1200r0 Submission Sept 2012 Xiaoming Peng / I2RSlide 1 Date: Authors: IEEE aj Sept 2012 Closing Report.
Doc.: IEEE /1116r1 Submission November 2009 Eldad Perahia, Intel CorporationSlide 1 TGad November 2009 Report Date: Authors:
VHT SG Report to EC Date: Authors: November 2008 April 2007
November 2007 Opening Report
TGai Second Vice Chair Candidate Overview: Robert Stacey
VHTL6 task group work plan proposal (VHTL < 6 GHz)
TGad Process Overview Date: Authors: January 2009
IEEE aj Process Overview
April 2007 doc.: IEEE /0570r0 July 2010 Response to ITU-R Liaison to IEEE on “Multiple Gigabit Wireless Systems in frequencies around 60 GHz”
Proposal for TGad Evaluation Methodology
TGad March 2010 Closing Report
TGad September 2010 Closing Report
Proposal for TGad Selection Procedure and Timeline
April 2007 doc.: IEEE /0570r0 July 2010 Response to ITU-R Liaison to IEEE on “Multiple Gigabit Wireless Systems in frequencies around 60 GHz”
VHT SG September 2008 Closing Report
VHT60 Tutorial Date: Authors: July 2008 April 2007
TGad July 2009 Closing Report
March Liaison Report Date: Authors: March 2008
May 2007 Opening Report Date: Authors: May 2007 March 2007
May Liaison Report Date: Authors: May 2010
November 2007 Opening Report
TGad September 2009 Report Date: Authors: September 2009
TGad September 2009 Closing Report
March 2007 Opening Report Date: Authors: March 2007
VHT SG September 2007 Closing Report
TGad November 2009 Closing Report
Waikoloa Liaison Report
TGad January 2010 Closing Report
Taipei Liaison Report Date: Authors: January 2008
VHT60 Tutorial Date: Authors: July 2008 April 2007
IEEE aj Process Overview
VHT SG July 2008 Closing Report
TGad November 2009 Report Date: Authors: November 2009
TGn Closing Report Taipei, TW 802 Interim –18 Jan ‘08
TGad March 2009 Closing Report
IEEE aj Process Overview
TGad July 2010 Editor Report
Atlanta Liaison Report
TGad May 2009 Closing Report
May Liaison Report Date: Authors: May 2009
TGad May 2009 Report Date: Authors: May 2009 April 2007
Proposed Modifications to VHT60 PAR
VHT SG July 2008 Report Date: Authors: July 2008 April 2007
China MM-Wave (CMMW) Study Group March 2012 Closing Report
TGad Editor Report Date: Authors: May 2011 April 2007
TGad Editor Report Date: Authors: July 2011 April 2007
VHT SG November 2008 Closing Report
March Liaison Report Date: Authors: March 2010
TGad March 2011 Closing Report
Task Group BA - March 2017 March 2017 Since the last F2F meeting
VHT SG January 2008 Closing Report
Proposed Modifications to VHT60 PAR
TGba January 2018 Closing Report
TGad May 2011 Closing Report
VHT SG March 2008 Closing Report
TGad March 2009 Report Date: Authors: March 2009 April 2007
TGad Editor Report Date: Authors: March 2011 April 2007
VHT SG January 2009 Report Date: Authors: January 2009
Task Group AY May 2016 Closing Report
Simulation Scenario Floor Plans
TGad Task Group Document Open Items
Proposal for TGad Evaluation Methodology
TGac January 2009 Closing Report
TGad May 2009 Report Date: Authors: May 2009 April 2007
TGad May 2009 Report Date: Authors: May 2009 April 2007
Presentation transcript:

TGad January 2009 Closing Report April 2007 doc.: IEEE 802.11-07/0570r0 January 2009 TGad January 2009 Closing Report Date: 2009-01-22 Authors: Eldad Perahia, Intel Corporation Eldad Perahia, Intel Corporation

April 2007 doc.: IEEE 802.11-07/0570r0 January 2009 Abstract This document is the closing report for the TGad (Very High Throughput 60 GHz) for the January 2009 plenary session. Eldad Perahia, Intel Corporation Eldad Perahia, Intel Corporation

Work Completed January 2009 Task Group document development (presented in VHTSG) TGad Process Overview, Eldad Perahia, 09/0091r0 802.11ac and 802.11ad Usage Models Documents Proposal, Rolf De Vegt, 09/0034r0 TGad Functional Requirements Proposal, 09/0094r0, Eldad Perahia TGad Evaluation Methodology Proposal, 09/0096r0, Eldad Perahia Officer Elections Chair: Eldad Perahia Vice Chair (task group docs): Vinko Erceg Vice Chair (802.15.3c/coex): John Barr Secretary: no volunteers yet Approved TGad timeline Call for contributions for new usage models 802.15.3c Coexistence Assurance Document presentation Coexistence assurance summary, James Gilb, 15-09/0080r3 Coexistence assurance, James Gilb, 15-09/0022r4 802.15.3c is soliciting feedback from 802.11 Eldad Perahia, Intel Corporation

Goals for March Continue working on task group documents April 2007 doc.: IEEE 802.11-07/0570r0 January 2009 Goals for March Continue working on task group documents Feedback on 802.15.3c CA doc Technical contributions Joint meeting with 802.15.3c Eldad Perahia, Intel Corporation Eldad Perahia, Intel Corporation

Conference call times January 2009 Feb 5 – Feb 19 - March 5 – April 2007 doc.: IEEE 802.11-07/0570r0 January 2009 Conference call times Feb 5 – 11:00-13:00 ET Feb 19 - 20:00-22:00 ET March 5 – Possible topics New Usage Models Channel Model Functional Requirements Evaluation Methodology Selection Procedure Possible joint call w/ 15.3c Summary of 15.3c documents for reference (system design, channel model) Eldad Perahia, Intel Corporation Eldad Perahia, Intel Corporation