High Level System Solution Impact Assessment

Slides:



Advertisements
Similar presentations
Presenters:- Steve Nunnington xoserve & Sallyann Blackett E.on Sallyann Blackett E.on Rolling AQ – A Straw Man.
Advertisements

Implementation of Non Effective Days Nexus Workgroup – March
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
Gemini Release 4 UKLC Update 8 th February Gemini Release 4 – UKL13820  UK Link Committee is requested to approve the following:  Implementation.
Functional Change through RGMA Review Ph2
Modifications iGT 039 and GT 0440 re iGT Agency Services background
xrn4361 UK Link Future Release 2
UK Link Technology Refresh
UKL Future Release 2 Cutover/Implementation
XRN4361 – UK Link Release 2 Data Migration Plan for XRN /03/18
Market Trials ChMC 8th August 2018.
DSC Change Committee Summary – 12th December
DSC Change Committee Summary – 13th June
Change Management Committee – June 2019 Update
DSC Change Committee Summary – 7th November
R&N Timeline Release 2 Release 3 Feb-19 June-19
Project Nexus Workgroup
Future Release 3.0 – Release 3 Industry Impacts & Recommendation
Overview XRN4665 is looking to add new EUC profiles for bands 01B & 02B New EUC profiles will be split based on Market Sector Code & Pre-Payment Meter.
Project Nexus Workgroup
RAASP – Solution Options Scenario Comparison
DSC Change Committee Summary – 12th September
DSC Change Committee Summary – 11th July
Impacts of Project Nexus Implementation Date to AQ17
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
DSC Change Committee Summary – 10th October
DSC Change Committee Summary – 9th May
R&N Timeline June-19 Sept-19 (EUC) Nov-19 Minor Release D4
Release 2 Scope Business Benefit Review
Ofgem Switching Programme: Central Switching Service consequential change update 9th May 2018.
CSS Consequential Change CoS Shell Record Submission for Discussion at 630R 27th April 2018.
Project Nexus Workgroup
June 2019 Release Scope DSC Change Management Committee
DSC Change Committee Summary – 13th March ‘19
Release 3 Scope – Initial View
Release 3 Scope Selection and Plans
XRN4249 – Part B Data Migration Plan
UK Link Replacement Programme additional supporting UNC modifications
Ofgem Switching Programme: Central Switching Service consequential update 16th May 2018.
Project Nexus Workgroup
Retail & Networks ChMC Update
Implementation Approach Distribution Workgroup – June 2014
Data Office – Portfolio of work
Meter Read Rejections ..
Meter Reads.
Project Nexus Workgroup
Customer Issue Management CoMC Update
High Level System Solution Impact Assessment
High Level System Solution Impact Assessment
XRN4692 – CSEPs: IGT and GT File Formats (CIN Files)
DSC Change Committee Update
Customer Issue Management CoMC Update for April & May 2019
UK Link Timeline June-19 Sept-19 (EUC) Nov-19
DSC Delivery Sub-Group
Customer Issue Management CoMC Update for June 2019
Enabling Large Scale Utilisation of Class 3
DSG Governance Group Recommendations.
UK Link Change Impacts and Release Update
Customer Issue Management Dashboard CoMC - July 2019
Customer Issue Management Dashboard CoMC - July 2019
Xoserve Draft UIG Incentives Modifications 20 May 2019
Change Management Committee
Change Management Committee
DSC Change Committee Update
XRN Enabling large scale utilisation of Class 3 – MOD0700
Change Management Committee Sections 2 - 6
Customer Issue Management Dashboard CoMC
Customer Issue Management Dashboard CoMC
Presentation transcript:

High Level System Solution Impact Assessment XRN4932 - Improvements to the quality of the Conversion Factor values held on the Supply Point Register (MOD0681S) High Level System Solution Impact Assessment

Change Overview XRN4932 - Improvements to the quality of the Conversion Factor values held on the Supply Point Register (MOD0681S) UNC Modification 0681S has been raised to look at the CDSP being given the authority to make changes to the conversion factor in the following circumstances only: a) Where the AQ of a meter point falls to 732,000 kWh or lower, the conversion factor should be updated to the default of the standard value of 1.02264, as specified in the Gas (Calculation of Thermal Energy) Regulations, with effect from the effective date of the new AQ. b) Where the AQ of a meter point increases above 732,000 kWh, the conversion factor should be set to the last non-standard factor held on the Supply Point Register (if one is available) with effect from the effective date of the new AQ. Where no ‘non-standard’ conversion factor is found no action shall be taken XRN is in development alongside Modification 0681S, any fundamental changes to this Mod could amend the scope of this change and effect delivery timescales. Solution Options 1 Amend the Conversion Factor as part of a successful Rolling AQ calculation (Monthly or Correction)

Option 1 - High Level Impact Assessment 1 - Amend the Conversion Factor as part of a successful Rolling AQ calculation (Monthly or Correction) As part of this change, the conversion factor will be updated as part of AQ Updates above or below 732,000 kWh. Below are the list of changes: Rolling AQ and AQ Correction to be updated to provide a trigger whenever there is a change in the AQ above or below the threshold value of 732,000 kWh. New code needs to be developed to update the conversion factor; which will run post 30 days of NRL being sent to the Shippers for AQ updates. Read estimation needs to be done while updating the Conversion Factor. If the AQ of a meter point falls to 732,000 kWh or lower, the conversion factor should be updated to the national default of 1.02264 and if the AQ of a meter point increases above 732,000 kWh, the conversion factor should be set to the last ‘non-standard’ factor held on the Supply Point Register (if one is available), if none is available then no update will be carried out. DRS will also need to be triggered to notify the Shipper of the estimated read in these instances. New Report needs to be developed for cutover in order to align all the Conversion Factors for the entire UK Link portfolio with the rules set out in the Modification. Conversion Factor updates via RGMA process will take precedence over the data cleansing activity during cutover. Impacted Systems Assumptions Market Trials costs are not considered. Performance Testing will be required. MPRNs with Device are in scope of the XRN. Shippers will be notified on M-7 via NRL of the AQ change where conversion factor needs an update. If no ‘non-standard’ conversion factor is found; then no action shall be taken if AQ is increased from 732,000 kWh and a standard CF is present Impact Gemini Marketflow SAP PO SAP ISU CMS API SAP BW DES Overall Impact Release Type High Level Cost Estimate Medium Major 20,000 - 30,000 GBP

Option 1 - System Impact Assessment Reports Interface Conversion Enhancements Forms Workflow Data Migration System Component: SAP ISU Impacted Process Areas: RGMA SPA/AQ Complexity Level (per RICEFW item): Med Change Description: New report to update the Conversion factor for the AQ Updates New report to be developed for data cleansing during cutover Trigger to be created from below processes. Rolling AQ AQ Correction ISU BW PO / Marketflow DES CMS AMT API Test Data Prep Complexity: Medium Unit and Sys Test Complexity: Low Pen Test Impact: No Regression Testing Coverage: Performance Test Impact: Yes Market Trials: UAT Complexity:

Option 1 - Process Impact Assessment Process Area Complexity File Formats Exceptions External Screens Batch Jobs Performance Test? SPA Low No Metering (Reads) n/a Reconciliation Invoicing – Capacity Invoicing – Commodity Invoicing – Amendment Invoicing – Other Rolling AQ Med Yes Formula Year AQ RGMA DSC Service Other (Specify)