Engineering Projects management

Slides:



Advertisements
Similar presentations
Super visor: Eng. Husain Abu Zant Dr.Bassam Odeh Value Engineering Management Mohammad Khader Sultan Radwan Yassar Abu Baker Ramzi Ashour Tamer suliman.
Advertisements

World Zarathushti Chamber of Commerce BUSINESS PLAN ORIENTATION PROGRAM.
AN-NAJAH NATIONAL UNIVERSITY FUCULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT GRADUATION PROJECT CONSTRUCTION PROJECT MANAGEMENT (Value Engineering)
Civil engineering department Graduation project (part 1)
An-Najah National University Faculaty Of Engineering Civil Department Construction PROJECT MANAGEMENT CONSTRUCTION PROJECT MANAGEMENT Prepared by: sameh.
1 Purpose  Summarize Monday’s workshop  Update on the Radio System – confirm staff’s recommendation  Jail Expansion – discussion/direction  Discussion.
Market Validation.
Project Management Outline of Chapters 1-6. Chapter 1 – Project Management Concepts Definition of a project and its attributes Key constraints within.
OHT 22.1 Galin, SQA from theory to implementation © Pearson Education Limited Objectives of cost of software quality metrics 2.The classic model.
Chapter 3: The Project Management Process Groups
Project Title Business Case Your Name Month, Year.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Achieving Value: The How and Why of Value Engineering Paul Johnson, CH2M HILL Presented at the PNWS – AWWA 2008 Annual Conference Vancouver, Washington.
Miguel Cabezudo Nicolas Laflesselle Niklas Wilkens.
Value Engineering Value Engineering is the conscious, systematic application of a set of techniques that identify the needed functions, establish values.
THE APPLICATION OF VALUE ENGINEERING ON PUBLIC CONSTRUCTION PROJECTS IN SAUDI ARABIA BY: Mohammad Ali Husain Al-Sughaiyer Supervised By: Dr. Saadi Assaf.
Bringing Quality At Your Budget P.O.Box contact AL BARARI STAR.
Value Analysis Prepared by Bhakti Joshi July 11, 2014.
An-Najah National University Graduating project II Delay in construction projects.
Market Entry Strategy and Designing the Marketing Programme at target markets: A Case of Selected Company and Selected Markets (special focus V4 countries)
An-Najah National University Faculty Of Engineering Industrial Engineering Department Implementation Of Quality Function Deployment On Engineering Faculty.
VALUE ANALYSIS/ VALUE ENGINEERING. Value analysis & Value Engineering Value analysis & Value engineering can be defined as an organised approach to provide.
Specification & Quantities Estimating
Chapter 7: A Summary of Tools Focus: This chapter outlines all the customer-driven project management tools and techniques and provides recommendations.
King Fahd University of Petroleum & Minerals
Consulting Business Start-up Evaluation Progress Report #2 EMMP Capstone Project Central Team 03/04/2003.
UTSA Colleges of Business and Engineering TAKE YOUR TECHNOLOGY TO THE LIMIT! 1CITE BootCamp February Technology Entrepreneurship Boot Camp Sponsored.
Chapter 10 Marketing.
HOUSEHOLD BUDGET SURVEY EVALUATION. PROJECT OVERVIEW PRECURSORS State Program on Poverty Reduction & Sustainable Development ( ) CSOs given the.
Measuring Palestinian labors productivity Rates for Block, Steel and excavation works Measuring Palestinian labors productivity Rates for Block, Steel.
10. DENSITY  In addition to building design, there are other elements that can impact the passive potential of a site. Density, measured in Vancouver.
Contractor Alternate Design Serving the Public’s Best Interest.
Getting Ready for Net Zero Laurie L. Goscha, Bailey Edward Sachin Anand, dbHMS.
Job Cost Change Orders Melissa Wood The True Value of Change Orders ?
Commission Meeting November 18, 2015 WSSC Customer Use and Pricing.
2/27/2016 IENG 471 Facilities Planning 1 IENG 464 – Conceptual Design Project Report & Presentation Requirements.
Design of a large scale production system for aluminum GLARE sheets
By: Chelsea Gobster. * Predict crossroads problems * Convention for outcomes, overall process, roles, and ground rules * Make a design team to tailor.
Coordinating with Project Managers Cassie Reiter, P.E., ENV SP Utility Coordinator/Project Manager CMT Engineers and Consultants June 2016.
Cost Overrun in Construction Projects Supervisor : Eng.Reema Nassar.
Open Road Tolling Procurement Update
Project Management Lecture 22
Project Management Chapter Topics
Causes of Disputes Prepared by : Ali Jamous Jasser Dwiekat
Measuring Palestinian Labors Productivity
PERSONAL CARBON TRADING AND EQUILIBRIUM PERMIT PRICE
Arbitration as a Dispute Resolution Technique in Construction Projects
{Beir Ziet Secondary Boys School }
What is Added Value? “Added value” describes any activity carried out by the business that increases the value of its product or service. The actual “value.
Construction Project Management
(Additional materials)
An-Najah National University
Construction Project Management
Construction Project Management
COST PLANNING AND ESTIMATION
SEO in Chennai SEO is the abbreviated as search engine optimization it is a good thing of the business world. It is the methodology to create a traffic.
Awarding Criterion for late tender: the lowest bid- why?
in Construction Industry
STATUS REPORT.
Controlling cost.
Types of Chemistry Lists
An - Najah national university Civil engineering department
Supervisor: Eng. Mohammad abu neama
Managing Project Risks and Opportunities
Name origin and definition
6th. Semester Schedule: 1st. Week
FCMA, FPA, MA (Economics), BSc Dubai, United Arab Emirates
Graduation Project Project Name
What Is an Abstract? Abstract Writing.
Muskat Secondary School Project
Presentation transcript:

Engineering Projects management Super visor: Eng. Husain Abu Zant Mohammad Khader Sultan Radwan Yassar Abu Baker Ramzi Ashour Tamer suliman

Case study Azoun Primary School in Azoun near Qalqilia city. Three floor the Basement floor with an area equal to 109.25m2,and the other two floor have an area of 537.32m2 and the total area nearly to 1206m2. The estimated price of the project which made by the consultant is about (400,000 $), while the available budget is (426,000 $).

Assumptions Value Engineering using price analysis will reduce the cost of the project.

Objectives This research is aimed to minimize the price of the project to match the available budget.

Methodology Study all the nine issues in order to get management skills to be used to achieve the main objective. To minimize the project price in the research VE could be used. Interviews for several contractors should be made to achieve the objective. Interview the carpenter, steel fixer, painter, tier, aluminum fixer), to study the type of material and price of all type to comparative and chose the best alternative.

Value Engineering

Value Engineering definition Value Engineering is a function oriented, systematic team approach and study to provide value in a product, system or service.

Value Engineering Methodology Improvement of VE is focused on: 1- cost reduction. 2- customer perceived quality.

Applications of Value Engineering

Finishing works items to be discussed: Carpentry work. Paint work. Aluminum works. Steel works. Tiles works.

Summarizing Table

Conclusion &Recommendations

Conclusion Based on Implementation of value engineering methods and price analysis on the original specifications and plans of the contract, the cost was reduced by $7835. Despite all value engineering methods and price analysis calculations the project was still over budgeted. This conclusion may be justified by inaccurate pricing by the consultant.

Recommendations Reduce the area of the project and get rid of the unnecessary works. Search for new donor to cover the deficit in the budget. Structurally redesign for main elements of the project.