US-HiLumi – Shipping Post Assembly Status

Slides:



Advertisements
Similar presentations
J.P. Langston Brake Retrofit
Advertisements

Automotive Chassis Systems, 5/e By James D. Halderman Copyright © 2010, 2008, 2004, 2000, 1995 Pearson Education, Inc., Upper Saddle River, NJ All.
Service Training PV Series 42 PVplus
Balancing engines For smoother engine operation & longevity Forces multiply as engine RPM increase Copyright 2003 Gary Lewis – Dave Capitolo.
New Type C & D Straight line wiper options.
Yamaha oil pump rebuild
Model 12 Intek Horizontal OHV
Diesel Engine Components
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
NTOF11 Hg System Design Status Van Graves Tony Gabriel, Phil Spampinato Collaboration Meeting – Princeton University Apr 2005.
FF-650 Repair Procedure—CMP 30 Frame Reason for Repair—CMP 30 models with Serial Numbers in the range of 2453 through 3354 in Lot 9587, 0008 through 0120.
Diesel Engine 4 Stroke Cycle model
FDR Station 3 lift fixture, laser screens and brackets T. Brown and L. Morris with analysis support from A. Brooks December 3, 2007.
CROP Insertion Into ISO Container (Some Observations) MITCHELL BATES QASAS, 1 st TSC Ft Bragg DSN / SEP 09.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
Mechanical Engineering Drawing MENG 204
Automotive Steering, Suspension and Alignment, 5/e By James D. Halderman Copyright © 2010, 2008, 2004, 2000, 1995 Pearson Education, Inc., Upper Saddle.
TP4-ENERSOL-TD/PV double function
Crosshead Crosshead pin connects piston to the connecting rod. On either side of the crosshead pins are mounted the crosshead slippers (or shoes). The.
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
MARS 2 Design Review-Optomechanical Review 07 Nov 2002 GLW1 MARS 2 Mechanical Design Review.
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
UPDATE ON THE CRYOSTAT DESIGN AND INSTALLATION SEQUENCE.
NCSX VACUUM VESSEL PL Goranson Thermal Insulation Final Design Review July 31, 2006 WBS12 NCSX.
CLIC Module meeting, 22/08/2011 N. Chritin (EN/MME) Cradles design for CLIC module supporting system (EDMS )  General principle  Main inputs an.
Sophisticated Design Automatic Tailgate Final Presentation December 5, 2001 Ted Akiskalos June Doan Tarek Elshazly Maggie Kim David Nimitz Sharon Ramey.
Engine Reassembly Technicians need to take their time when reassembling an engine. This is not a race! Listen for instruction when to add the next piece.
Limits and Fits Need for different types of fit Limits of size and Tolerance Principal Terms Explained Definition of different types of Fit.
TYPE I TYPE II TYPE I Front View # 32 TAP DRILL 4 places B TYPE.
Problem Statement & Conceptual Designs September 6, 2006 Team Moondogs Chris Culver Rahul Kirtikar Elias Krauklis Christopher Sampson Michael Widerquist.
Handout 10a1 TOLERANCES - Introduction Nearly impossible to make the part to the exact dimension by any means of manufacturing approach  tolerances of.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
GLAST LAT ProjectDec 17, 2003 Page 1 GPR Design & Requirements Grid Perimeter Ring (GPR) Design –Ring is comprised of four lengths of Aluminum bolted together.
Status of the Yoke Interfaces Presented by Evgeny Koshurnikov February 2013.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Diesel Engine Components
VIEW SERIES with Sliding Door
M1M3 Fan Coil Unit Status Gary Muller & Brian Johnson LSST 2017 Project & Community Workshop 8/17/2017.
STEP 1: ASSEMBLE ANGLE PLATES
ENGINE MODE CODES.
ProtoDUNE – DSS Installation, Alignment and QA
SBN Far Detector Installation & Integration
GLAST Large Area Telescope:
Pneumatic Bearing Puller
Barrel EMC assembling (EDMS DOCUMENT NUMBER /1)
LARP Phase II Secondary Collimator RC1
Endcap shielding senarios:
Overview of Mechanical Design
Limits and Fits Need for different types of fit
MECHANICAL DRAWING WORKING DRAWINGS
Open Issues Modification of Cactus Arm bending tool required
CROP Insertion Into ISO Container
STEP 1: ASSEMBLE ANGLE PLATES
Diesel Engine 4 Stroke Cycle model
Utah State University - University of Washington - Virginia Tech.
McMaster linear bearing #6709K180 with guide rail suppressed
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”.
M500, M500N, M500Z 21/2”-10”.
Changes in EN
Reader Swap out Guide.
Gattini Detector Installation
C400, C400N, C400Z 21/2”-10”.
M400, M400N, M400Z 21/2”-10”.
Bunker Wall Design Wall ESS
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

US-HiLumi – Shipping Post Assembly Status Don Arnold US-HiLumi Status 14 March 2019

Shipping Post – New Components Typical Shim Varying Sizes From 1.5 mm To 0.13 mm Shipping Post Support Plate Push Rod 3/14/2019 D.Arnold/US-HiLumi Shipping

Shipping Post – U Bracket and Additions What is the Maximum Range? What loads can the bracket take? Materials? Can mounting holes be added? Proposed Ring Attachment 3/14/2019 D.Arnold/US-HiLumi Shipping

Shipping Post – Piston/Jack Travel - Ranges 3/14/2019 D.Arnold/US-HiLumi Shipping

Shipping Post – Piston/Jack Travel - Final 3/14/2019 D.Arnold/US-HiLumi Shipping

Shipping Post – Loading on U-Bracket 3/14/2019 D.Arnold/US-HiLumi Shipping

Shipping Post – Up Position 3/14/2019 D.Arnold/US-HiLumi Shipping

Shipping Support Plate – Loading on U-Bracket 3/14/2019 D.Arnold/US-HiLumi Shipping

Shipping Support Plate – Up Position See Next Slide for Shim Detail 3/14/2019 D.Arnold/US-HiLumi Shipping

Shipping Post Shim – Measuring Gap Support Plate Measure Gap 3/14/2019 D.Arnold/US-HiLumi Shipping

Shipping Post Shims – Additional Qty. - TBD Typical Shim Varying Sizes From 1.5 mm To 0.13 mm 3/14/2019 D.Arnold/US-HiLumi Shipping

Shipping – Push Rod Mounting Position – Opt 1 3/14/2019 D.Arnold/US-HiLumi Shipping

Shipping – Jack Piston Up – Opt. 2 3/14/2019 D.Arnold/US-HiLumi Shipping

Shipping Post – Remove Jack and Add Cover(s) 3/14/2019 D.Arnold/US-HiLumi Shipping

Additional Sides – From January 18th 3/14/2019 D.Arnold/US-HiLumi Shipping

Shipping Post – Final Shipping Configuration 3/14/2019 D.Arnold/US-HiLumi Shipping

Shipping Post – Jack Fit-up & Shim Sequencing #3 Fixed #1 Sliding #2 Fixed 3/14/2019 D.Arnold/US-HiLumi Shipping

Shipping Post – Comments and Questions Is there a procedure on the operation of the jack system? Are the clearances, dimensions, and stroke of the jack okay? Are there any dimensional drawings available for the top portion of the shaft in the jack? Any obstructions or other assembly fixturing I’m missing? Operational safety requirements? Documentation requirements? Naming Conventions? Shim Sizes, to start, will be 1.5, 1.0, 0.5, and 0.13 mm. 3/14/2019 D.Arnold/US-HiLumi Shipping