Options to Aid Extruder Screw Removal and Cleaning John L

Slides:



Advertisements
Similar presentations
Time-Labour Analysis for the use of Overhead Gantry Cranes in Modern Steel fabrication workshops. By David Rolle. MD. Rimco Building Systems Pty. Ltd.
Advertisements

Extrusion-Based Processes
Stable Rise – Fixed Bracket / Stationary Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
By: Alex Brett, R.T.P.O.(c).  Cast (with minimum 2” of plaster above trim line)  400ML Silicone Cartridge (durometer of your choice)  400ML Injection.
Machining Two introductory projects 1.Support post for mirror mount 2.Vertical micro-rail mount.
Yamaha oil pump rebuild
Pasta Towers. The Challenge Teams of up to 2 will design and build the lightest pasta tower with the highest structural efficiency, capable of supporting.
Stable Rise –Pull and Swivel Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Conceptual Design Presentation ME 4182 Team: Guys Engineering Nathan Bessette, Rahul Bhatia, Andrew Cass, Zeeshan Saiyed, Glen Stewart YJ Chok.
Grease to Gas: Biodiesel Basics. Today we will…. Examine why biodiesel is an important alternative fuel to petroleum based diesel Examine why biodiesel.
SHAPING PROCESSES FOR PLASTICS Chapter 13- Part 2 Injection Molding
2004 BRASS INSTALLATION HARDWARE. BRASS INSTALLATION FOR 2004 TOP AND BOTTOM SEXTANTS ONLY PROCEEDURE AND FIXTURES FOR TOP AND BOTTOM ARE SIMULAR.
Adaptation of a Van with a Device to Lift a Non-foldable Wheelchair Group Eight Members: Bill Fotoples- Team Leader Chad Wainscott- Technical Liaison/Web.
Rock Coring Obtain undisturbed samples of solid, fractured, or weathered rock formations.
XEROX DIGITAL PRINTING SYSTEM Brandon Romano Sang Jung Leon Dillard Kevin Forge.
Brakes Yes, they are Important!
Photo Clip Assessed Piece of Work Level What I need to do to improve my strand level Design ideas (Strand 2) Production plan (Strand 3) Practical work.
Rain Barrel Workshop February 11, 2012 By Melissa Merritt.
2006 Hand and Power Tool Safety Basic Rules for Rube Goldberg Competition,
Development of a Remote External Repair Tool for Damaged or Defective Polyethylene (PE) Gas Pipe Presented by Kenneth H. Green, President Timberline Tool.
© Pearson & GNU Su-Jin Kim Plastics Manufacturing Processes Plastics & FRP Associate Professor Su-Jin KimSu-Jin Kim School of Mechanical Engineering Gyeongsang.
Safety Section 3.
SRA Lab Safety & Proposal PowerPoint Project This is a Partnered/Group Assignment Tech Ed - 9 Lab Safety & SRA Proposal Report Mr. Saunders Remember: This.
EASELECTRIC Team 4 Adam Frank Jackie Jon. Introduction Planning a Design General Requirements: An electrically adjustable easel that can be safely used.
Basic Utility Vehicle (BUV) ME 462 Capstone Design Presentation Department of Mechanical Engineering, IUPUI December 14, 2005 Presented by: Tom Peters.
Garaventa Evacuation Chair Guidelines Presented by Risk Management Mt. SAC Garaventa Evac-Trac CD7.
CHM 101/102 Laboratory Manual Gas Laws General Chemistry 101/102 Laboratory Manual University of North Carolina at Wilmington.
By: Joe M. Searcy Tools Needed  Small Flat-Tip Screwdriver (Taped up with masking tape)  Socket set (or nut drivers), sizes  ¼”
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
MNM Fatal Powered Haulage Accident Powered Haulage Accident October 24, 2012 (Nebraska) October 24, 2012 (Nebraska) Underground Crushed Stone Operation.
Problem Statement & Conceptual Designs September 6, 2006 Team Moondogs Chris Culver Rahul Kirtikar Elias Krauklis Christopher Sampson Michael Widerquist.
Dumplings Done Right Anneliese Freitag, Ryan Boyle, Josh Gregov, Wenhan Introduction to Engineering Design 100 Section: 16 Team: #3.
Alyssa,Ben,Mike &Tyler.  These instructions are intended for anyone whose vehicle has a flat tire and wishes to change it themselves, but is unfamiliar.
Maintaining the M249 SAW SSG GARCIA.
Extrusion Plastics 001 Profile Extrusion. Extrusion Plastics 001 Introduction – Extrusion is a process that can make long parts with a constant cross-section.
Assalamu-alaikum DR. TAJAMMUL AHMED
Chapter Polymer Formation There are two types of polymerization –Addition (or chain) polymerization –Condensation (step) polymerization.
Manufacturing Plastics
Low Density Polyethylene (LDPE) By Kyle Hanley. LDPE Physical qualities Maximum Temperature: 176 °F (80 °C) Minimum Temperature: −58 °F (−50 °C) Melting.
Lab-Extrusion single screw Drive: Laboratory extruder 2.2 kW max.screw diameter 30mm Power Melt Feeder 7.5 kW max.screw diameter 30mm Max Power Melt Feeder.
Project Overview  Introduction  Clawbot Build  Design Modification  Design Development  Programming  Sensors  Advanced Sensors  Open design challenges.
Supply Chain Customer Order Decoupling Point
Manual Instructions Installation Cleaning Instructions
TABLE OF CONTENT INTRODUCTION OVERHAUL PROCESS DOCUMENT REQUIRED
Minimizer Confidential
Project Overview Introduction Clawbot Build Design Modification
These processes are very important. They always come up in exams.
Lab Safety.
Minimizer Confidential
Chapter 9 Safety Permit Systems
The Procedure for Graffiti Removal
MR KITCHEN MODULAR KITCHEN DESIGNERS & MANUFACTURERS IN PUNE
Simple Way to Install Auto Lock Door in Car
SHAPING PROCESSES FOR PLASTICS
BIM360 TRACKING General Information
Bell ringer answer on a half sheet of paper
Presented by Ajay Beniwal Extru-tech Solutions Inc., Canada
Feed horn array sub-system for QUBIC
Plastic Processing Extrusion Injection Moulding Blow Moulding
Understanding Student Preferences to Help Inform Online Course Design
Conducting an experiment and collecting data using product testing
Undulator Assembly Procedure
BASIC PRINCIPLES OF AIRMANSHIP
LTI no 45: 6/Nov/00 A crane driver was driving a mobile crane along this road to an oil-well for maintenance.
Best Paint Options for a Concrete Around Pool By: Authentic Plastic and Tile
Two methods to observe tutorial
Reducing Project Duration
Testing of Pigments for Plastics
CPVC Recycling.
Presentation transcript:

Options to Aid Extruder Screw Removal and Cleaning John L Options to Aid Extruder Screw Removal and Cleaning John L. Presa Fabrication Leader-Dow Chemical jlpresa@dow.com 979.238.1723

What Do These Tasks Have In Common? Going to dentist for a root canal… Christmas shopping for last minute gifts day before Christmas… Preparing your own tax returns… Changing a flat tire on the side of the road…

Outcome Ability to make an informed decision of best method for extruder screw removal using different materials. These being considered: Time savings Cost of materials Personnel Safety

Why Remove Screw? Measure wear Change screw Clean screw and barrel

Methods Used Today to Pull Extruder Screws Mechanical screw puller/pusher Forklifts – pushing or pulling Chain hoists/come-alongs Hydraulic press

Material Types Used “Pulling/cleaning” Aid LDPE 350°F 2 MI .920 d HDPE 350°F .85 MI .962 d Acrylic Purge blend 350°F (proprietary info) PVC (plasticized) 300°F CAUTION Temp must be kept below 350°F Purge Compound #1 400°F Purge Compound #2 350°F Purge Compound #3 400°F

Equipment Description Egan Davis-Standard Pilot Cast Film Line 5 Extruders: (2) 2” (3) 2.5” All data collected from core 2.5” extruders Single flight screws with Egan mixer Rear screw removal

Procedure Protocol The following steps were taken for all materials: Used the 2.5” extruders (after being disconnected from die assembly) Started with LDPE in extruder Slow rolled extruders until LDPE stopped exiting then added “pulling/cleaning” aid Added approximately 2.5 gallons of “pulling /cleaning” aid Continued slow rolling until nothing was being conveyed out of extruder Pulled screw out using chain come-along until we could easily pull screw out manually Cleaning begins

Rear Screw Removal

LDPE

HDPE

Acrylic Purge Blend

Acrylic Purge Blend

Acrylic Purge Blend

PVC (plasticized)

PVC (plasticized)

PVC (plasticized)

PVC (plasticized)

Purge Compound #1

Purge Compound #1

Purge Compound #1

Purge Compound #2

Purge Compound #2

Purge Compound #2

Purge Compound #3

Ranking System Numerical Ranking System (values assigned by team) 1- very easy 2- easy 3- moderate 4- difficult 5- very difficult

Results LDPE HDPE Acrylic Purge Blend PVC (plasticized) Purge Compound #1 Purge Compound #2 Purge Compound #3 Ease of Pulling Screw Ease of Cleaning Screw Price/lb Time to Clean (man min.) Order of Preference (ease to remove and clean)

Results 5 .70 - .85 45 7 LDPE HDPE Acrylic Purge Blend PVC (plasticized) Purge Compound #1 Purge Compound #2 Purge Compound #3 Ease of Pulling Screw 5 Ease of Cleaning Screw Price/lb .70 - .85 Time to Clean (man min.) 45 Order of Preference (ease to remove and clean) 7

Results 5 3 .70 - .85 .65 - .80 45 15 7 LDPE HDPE Acrylic Purge Blend PVC (plasticized) Purge Compound #1 Purge Compound #2 Purge Compound #3 Ease of Pulling Screw 5 3 Ease of Cleaning Screw Price/lb .70 - .85 .65 - .80 Time to Clean (man min.) 45 15 Order of Preference (ease to remove and clean) 7

Results LDPE HDPE Acrylic Purge Blend PVC (plasticized) Purge Compound #1 Purge Compound #2 Purge Compound #3 Ease of Pulling Screw 5 3 4 Ease of Cleaning Screw 2 Price/lb .70 - .85 .65 - .80 2.50 Time to Clean (man min.) 45 15 12 Order of Preference (ease to remove and clean) 7

Results LDPE HDPE Acrylic Purge Blend PVC (plasticized) Purge Compound #1 Purge Compound #2 Purge Compound #3 Ease of Pulling Screw 5 3 4 1 Ease of Cleaning Screw 2 Price/lb .70 - .85 .65 - .80 2.50 2.00 -7.00 Time to Clean (man min.) 45 15 12 9 Order of Preference (ease to remove and clean) 7

Results LDPE HDPE Acrylic Purge Blend PVC (plasticized) Purge Compound #1 Purge Compound #2 Purge Compound #3 Ease of Pulling Screw 5 3 4 1 Ease of Cleaning Screw 2 Price/lb .70 - .85 .65 - .80 2.50 2.00 -7.00 1.95 – 2.80 Time to Clean (man min.) 45 15 12 9 Order of Preference (ease to remove and clean) 7

Results LDPE HDPE Acrylic Purge Blend PVC (plasticized) Purge Compound #1 Purge Compound #2 Purge Compound #3 Ease of Pulling Screw 5 3 4 1 Ease of Cleaning Screw 2 Price/lb .70 - .85 .65 - .80 2.50 2.00 -7.00 1.95 – 2.80 2.10 – 4.00 Time to Clean (man min.) 45 15 12 9 Order of Preference (ease to remove and clean) 7 6

Results LDPE HDPE Acrylic Purge Blend PVC (plasticized) Purge Compound #1 Purge Compound #2 Purge Compound #3 Ease of Pulling Screw 5 3 4 1 Ease of Cleaning Screw 2 Price/lb .70 - .85 .65 - .80 2.50 2.00 -7.00 1.95 – 2.80 2.10 – 4.00 6.25 – 8.50 Time to Clean (man min.) 45 15 12 9 Order of Preference (ease to remove and clean) 7 6

Conclusions As far as time savings and effort, purge compound #1 is the preferred material. PVC (plasticized) was near the top. However, much tighter processing window needed for the PVC. Purge Compound #3 was next due to being a little more difficult to remove screw. The Acrylic purge blend and HDPE were somewhat comparable in performance as far as removal of screw and cleaning, however, the Acrylic purge blend took slightly less time to clean. Purge compound #2 was a little more difficult to remove and clean than the previous materials. LDPE was the most difficult to extract from extruder and remove from screw surface, thus requiring the most labor time.

Thank You! Questions?