Positioning, alignment strategy and assembly steps

Slides:



Advertisements
Similar presentations
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Advertisements

Manual Flo-tap Installation Instructions
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
The Problems with Long Bolt Flanges in process pipe connections when exposed to a fire!!
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
Objective : To understand the fabrication, design, installation welding, inspection and testing for new construction in oil and gas industry After followed.
ESS cavities interfaces
ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
ESS Cryogenic Distribution System for the Elliptical Linac MBL/HBL - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden.
Visit Gangway FromLHBIEP__0181 by Andre Coin ~ 2600 GANGWAY POSITION.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
05/01/20161 Benny Hoff TÜV NORD Sweden AB AFS 2005:3 Inspection of pressure equipment.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Installation of the T600 at Fermilab CSN2, September 22,
ESS Cryogenic Distribution System for the Elliptical Linac CDS Heat Loads Calculations Preliminary Design Review Meeting. 20 May ESS. Lund. Sweden.
Detail plan of S1-Global H. Hayano (KEK),
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
CM2 Repair Status 8/13/2012 Tug Arkan 1. Latest Status After the warm end couplers were disassembled, it was decided to disassemble all the lower aluminum.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
Overview of the ESS Linac Cryogenic Distribution System
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
Installation of the T600 at Fermilab Fermilab, February 15,
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Technical Procurement Plan
Installation Package – Mechanical / Piping
Crab Cavity Technical Coordination meeting:
Teleconf ACS – FREIA 28th March 2017
Bruno POTTIN, Anne-Catherine CHAUVEAU
Installation of the T600 at Fermilab
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
CLEAN UP & INSPECTION.
IT-4189 Supply and installation of a cryogenic distribution system
Cryostat procurement, status and plan, QA/QC
Teleconference ACS – FREIA 17th October 2017
LARP Vertical Test Facility
Functional interfaces
Teleconference ACS – FREIA 31st October 2017
Spoke CDS PDR Closeout J. G. Weisend II June 10, 2016.
Far Detector Activities Late 2017 – Early 2018
(vertical cryostat, Gersemi)
UK RFD Pre-Series cryomodule
Assembly instructions for M-K all bolt together hoppercone kit.
Teleconference ACS – FREIA 20th February 2018
Well Repair Installation of Well Liners
Installation Binder / IRR – an example
Cryomodule Assembly Plan
PANDA The conceptual design of the control Dewar
Helium collector structural analysis
Roof design Bunker Project CDR
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
Valve stem “gag” mechanism
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
April 19th 2017 Work Unit AIK CDR of the CDS-SL Installation integration.
Teleconference ACS – FREIA 19th June 2017
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Quality Inspection and Installation Plan For
UPPSALA UNIVERSITY_GERSEMI PROJECT
Work Unit AIK 11.2 CDR of the CDS-SL Mechanics
SC1R Cold Box PDR Assembly Sequence
Unloading and handling of MEBT
Presentation transcript:

Positioning, alignment strategy and assembly steps www.kriosystem.com.pl CRYOGENICS IS OUR PASSION Wroclaw 14.02.2019 CTL-EL Assembly Positioning, alignment strategy and assembly steps Maciej Matkowski Project Manager maciej.matkowski@kriosystem.co.pl

www.kriosystem.com.pl Supports bolting We expect to have drilled holes in the tunel and CTL Gallery. When the holes are ready we will put supports on place and we will bolt them with proper anchors.

Unloading with overhead crane by ESS rigging team. www.kriosystem.com.pl VB unloading CDS-EL: Unloading with overhead crane by ESS rigging team. All material related to lifting >1 year must be inspected and documented before use according to AFS 2003:6. Valve box: Traverse for lifting VB is attached to one hook so it is possible to rotate them while hanging in the overhead crane.

www.kriosystem.com.pl VB transport

www.kriosystem.com.pl VB transport

www.kriosystem.com.pl VB transport

www.kriosystem.com.pl Transport route

www.kriosystem.com.pl Supports assembly

CTL-EL Line positioning and alignment www.kriosystem.com.pl CTL-EL Line positioning and alignment Lowest point in tunnel – 3,17m Highest point on VB – 3,04 m

CTL-EL valve box positioning and alignment www.kriosystem.com.pl CTL-EL valve box positioning and alignment

CTL-EL valve box positioning and alignment www.kriosystem.com.pl CTL-EL valve box positioning and alignment

CTL-EL Line positioning and alignment www.kriosystem.com.pl CTL-EL Line positioning and alignment

VT, pressure and helium leak tests www.kriosystem.com.pl Welding process pipes VT, pressure and helium leak tests MLI wrapping

VT, pressure and helium leak tests www.kriosystem.com.pl Welding process pipes VT, pressure and helium leak tests MLI wrapping

Thermal shield assembly and MLI wrapping www.kriosystem.com.pl Thermal shield assembly and MLI wrapping

www.kriosystem.com.pl OJ assembly Tests

www.kriosystem.com.pl Aux Supports assembly

Assembly and welding aux lines www.kriosystem.com.pl Assembly and welding aux lines Tests of aux lines

Assembly and welding aux lines www.kriosystem.com.pl Assembly and welding aux lines Tests of aux lines