Problem of Remediation of the Legacy Tailings Sites in Central Asia December 21, 1991 at a conference in Almaty, the Central Asian republics declared sovereignty.

Slides:



Advertisements
Similar presentations
Operations Management Maintenance and Reliability Chapter 17
Advertisements

1 1 David Piper, UNEP DTIE Chemicals Branch 2nd Global Forum on ASGM Lima, Peru 3 to 5 September 2013 ASGM IN THE MINAMATA CONVENTION ON MERCURY …to protect.
Strengthening National Metrology Institutes (NMIs) in the Hemisphere, an essential element in the development of National Quality Infrastructure (NQI)
June 6, 2013 SURFACE RECLAMATION OF THE CAPTAIN JACK MILL SUPERFUND SITE Nick Anton, CDM Smith Todd Bragdon, CDM Smith Mary Boardman, CDPHE Joy Jenkins,
Regional Water Planning Senate Bill 1 Introduction and Status as of August 01, 1999.
IAEA International Atomic Energy Agency Introductions; Objectives and Scope of the Course Tr aining course on Authorization and Inspection of Uranium Mining.
Alabama State Port Authority Infrastructure for Tomorrows Market October 2005.
Needs Assessment & Master Plan. Needs Assessment & Master Plan Results Proposed Plan Costs Needs Safety Issues About Savage Field Environmental Impact.
NPDES Phase II in Wake County: Forging A Collaborative Approach to Stormwater Management APWA Conference September 19, 2005.
Murray River Project Update Coal Forum October 2013.
NO2 - Measuring project Swedish underground mines Social Dialogue Committee Extractive Industries 29 November 2013 Cecilia Andersson, SveMin Lars-Erik.
This Programme is funded by the European Union PPRD East Programme – a Flagship Initiative of Eastern Partnership Man-Made & Industrial Disasters Environmental.
By: Frank Filas, P.E. Environmental Manager Energy Fuels Resources Corporation 44 Union Blvd., Suite 600 Lakewood, Colorado Uranium Development in.
January 20 th, BudgetActual% YTDChange from prior year Ad Valorem Taxes $ 36,469,256$ 27,782, %$ 1,020,143 Sales Taxes 10,781,313 2,638,615.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
DEPARTMENT OF MINES AND ENERGY Image positional only placement optional Washout feature in PPP 70/30 Daly River Management Advisory Committee - Katherine.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
NRC LICENSE APPLICATION PROCESS
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Risk Reduction of Mining Accidents in the Tisa Basin Adriana Eftimie – Director PIU National Agency for Mineral Resources NATO/CCMS Pilot Study “Prevention.
Design and execution of a comprehensive PCB Management Plan for Kazakhstan IPEN Global Assembly 19 October 2010.
Sultanate of Oman Oman Drinking Water Safety Plan.
TRP Chapter Chapter 4.2 Waste minimisation.
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
Storage and disposal of mercury and mercury waste in Asia - Conclusions Sven Hagemann GRS.
Cleanup of Uranium Legacy in Southeastern Utah
Tritium: Fleet-Wide Assessment Program Zigmund A. Karpa Director Environmental and Regulatory Affairs.
UZBEK ACADEMY OF SCIENCES RENEWABLE ENERGY: PROBLEMS AND PROSPECTIVE IN UZBEKISTAN Ilkham G.Atabaev, Dr of science in physics and mathematics, deputy-director.
Delivering Excellence in Remediation of Contaminated Sites.
Technical Meeting on Evaluation Methodology for Nuclear Power Infrastructure Development December, 2008 Nuclear Safety in Infrastructure Building.
Investment project of Ferghana plant of chemical fiber Olim F. Maksudov Director General.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Kazakhstan.
NATO Project Plan URANIUM EXTRACTION AND ENVIRONMENTAL SECURITY IN THE CENTRAL ASIAN REPUBLICS NATO Project Plan Project Duration 2 years.
Scott Surovchak Rocky Flats Site Manager U.S. Department of Energy (DOE) Office of Legacy Management (LM) Cleanup and Remedy Implementation at the Rocky.
WM-2010, ENVIRONET section Phoenix 7-11 March 2010
Logo L u c k y P e n n y The presentation will begin shortly…
1 International Working Forum on Regulatory Supervision of Legacy Sites (RSLS) Technical Meeting Amel MELLOUK – ASN / DRC Jérémie VALLET – MEDDE/MSNR Regulatory.
UMREG Balanced Resources Management UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 Remediation of the Tuyuk Suu Tailings Pond “Appraisal of the Minkush.
Decision making process / basic options assessment Mercury Storage and Disposal LAC Two Countries Project Gustavo Solórzano Ochoa, Consultan t Montevideo,
Workshop on “Country Partnership Models with Central Asia” Ministry of Economy and Antimonopoly Policy of the Kyrgyz Republic.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
“MAINTAINING ENVIRONMENTAL INTEGRITY IN MINING ” Tashana Redmond Senior Environmental Officer.
Uranium Mining and Remediation Exchange Group, UMREG2012 Vienna 7 – 8 November 2012, DEVCO Nuclear Safety 1 EU - Instrument for Nuclear Safety Cooperation.
Romania Hazard Risk Mitigation & Emergency Preparedness Project Aurel Bilanici Ministry of Interior and Administrative Reform.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Azerbaijan.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
IAEA International Atomic Energy Agency Summary and Overview of TECDOC Russel Edge Decommissioning and Remediation Unit Division of Radiation,Transport.
Regulatory Approach to Radioactive Waste Management and Remediation in Central Asia Tamara Zhunussova Vienna, IAEA, 6-8 November, 2012.
56th Regular Session of the IAEA General Conference
1 Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site LTS&M Planning LTS&M Conference Grand Junction, CO November 16, 2010 Donald Metzler U.S.
“ OVERALL DECISION MAKING IN PLANNING FOR REMEDIATION OF URANIUM MINES” Presentation to the Senior Regulator’s meeting at the 56 th IAEA General Conference.
Regulatory Framework for Uranium Production Facilities in the U.S.
IAEA International Atomic Energy Agency. IAEA Dr. Abraham Gregorio de Rosa,Sp.Rad Radiologist in HNGV Dili, Timor Leste 2 Perspectives on regulatory models.
Nuclear Research and consultancy Group European Radiation Survey Site Execution Manual Leo van Velzen ENVIRONET Kick-off meeting Vienna 23 – 26 November.
The Male’ Declaration Progress Since Network Meeting 2005.
0 National Inter-Ministerial Dialogue on Climate Change Cape Hotel Monrovia, Liberia June 25, 2009 Assessing and Developing Policy Options for Addressing.
SWANA - Saskatchewan Landfill Capital and Operational Costs By Steve Johnson M.Eng., P.Eng. November 2015.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
The Male’ Declaration Proposal for Phase III. Looking back to think ahead Policy Dialogue Background Materials Ministerial agreement Capacity building.
Regional Action Plan for Sustainable Transport of Dangerous Goods along the Mekong River Final Regional Workshop, October 2014 Bangkok, Thailand.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
COAL MINE PROJECT OPPORTUNITY NALAIKH MINE POWER GENERATION AND HEATING PROJECT TSAGAAN SHONKOR HOLDING COMPANY NALAIKH DISTRICT, MONGOLIA OVERVIEW OF.
SUGHD free economic zone development projects.
Tailings Dam Stability
Egyptian Nuclear and Radiological Regulatory Authority (ENRRA)
Nikisi Lesufi Senior Executive Chamber of Mines
SWAC – Agenda 10/23/18 Chapter 6 – Alternative Technology – Draft Findings 2. Chapter 7 – Draft Landfill Disposal Existing Disposal System Disposal Options.
Presentation transcript:

Problem of Remediation of the Legacy Tailings Sites in Central Asia December 21, 1991 at a conference in Almaty, the Central Asian republics declared sovereignty over their natural resources. Accordingly, the responsibility for the U mining legacies is with the national governments. In most of the Central Asian countries the present state of legacy sites is in violation of the standing public health standards Only in Kazakhstan is the remediation of the legacy sites funded by the national government The GNP of the other Central Asian countries is too small to provide for funding of the remediation of the legacy sites To commence remediation in Kyrghyzstan, Tajikistan and Uzbekistan international funding is needed.

Mailuu Suu: approx. 23,000 inhabitants East end of Fergana valley Impoverished region Close to Uzbek border Mailuu Suu river The Mailuu Suu remediation project demonstrates that international funding can provide the necessary impetus to commence remediation and make the national government participate in the project both financially and institutionally Courtesy of the IAEA

1 Feasibility Study comprising Remedial Options & prelim.estimates Environmental Impact Assessment ($ 0.65 million) 2 Implementation of Remedial Works examples: Ak Tuz: Tailings area 1($1.2 million) Tailings area 2($ 1.7 million) Tailings area 3($ 2.5 million) Tailings area 4($ 3.2 million) Min Kush Tuyuk Suu (relocation to D)($ 4.5 million) Taldy Bulak($ 0.7 million) 3 Monitoring and Maintenance Program ($ 0.5 million per year) (MES funding for Minkush approx. 250 – 350 K Som) 4 Public information and consulting ($ 1 million) 5 Regulatory capacity building, training, ($ 1.9 million) environmental information management system, laboratory upgrading, monitoring equipment 6 Technical Assistance (International Consultant) ($ 0.3 million) Components needed for a Remediation Project Proposal (The case of Ak-Tuz and Min Kush)

Key Components of the Environmental Impact Assessment Process Project description; Environmental assessment; Contaminant transport modeling; Pathways analysis; Human health implications; Radiation protection; Occupational health and safety; Training requirements; Quality Assurance/Quality Control Emergency response; Project management; Contingency planning; Monitoring/maintenance Socio-economics; and Stakeholder consultation.

Involvement of the Public Stakeholder Courtsy of the IAEA Possible approaches: Environmental Review Committee selected from local representatives who serve as multiplicators, Project Open House; Education of local population

Tuyuk Suu Tailings pond in Minkush

The potential route for relocation of the Tuyuk Suu tailings. Distance to Dalneye approx 12 km. Cost factor: The road will have to be upgraded.

Tailings deposit at the Dalneye site. Sufficiently stable and large site to take the Tuyuk Suu tailings

The tailings relocation option Case of the Moab UMTRA Project in USA Courtesy of the US DOE UMTRA The Moab UMTRA Project is the largest tailings relocation project in the world. The relocation was done to full satisfaction of all stakeholders while maintaining a safety record free of lost time safety incidents, and execute work ahead of schedule and within budget.

The tailings relocation option case of the Moab UMTRA Project in USA Courtsy of the US DOE UMTRA Project The Haul Road (Construction Road) for Tailings Relocation in a mountainous terrain

The tailings relocation option case of the Moab UMTRA Project in USA Courtsy of the US DOE UMTRA Placement of the relocated Moab Site tailings into the Disposal Cell at the new site

Elements of Costing of the Tuyuk Suu Tailings Relocation Project a)Relocation of tailings to secure site and reclamation of existing site b)Stabilization of potential landslide areas c)Install, repaire or stabilize containment dams dams and dykes d)Establish or improve surface water management system to handle 1:100 year run-off event e)Repair, replace or decommissioning of subsurface drainage system f)Erosion protection of slopes, embankments and waterways g)Construction or repair of tailings cover h)Re-vegitation i)Fencing and signage j)Environmental/radiation monitoring and regular inspection k)Routine annual maintenance of slopes, drainage, structures and tailings areas

Some legacy tailings may contain marketable metals, e.g. gold (Ak- Tuz), Mo (Kara Balta), etc. However, - the distribution of these metals in the tailings varies horizontally and vertically according to the system and rhythm of discharge, and - compared to the ore- their geochemistry and mineralogy underwent considerable changes during processing and long storage. A complex sampling program is required to estimate the inventory of the respective metal and a tailor made technology of recovery must be developed. In case that metal recovery proves to be feasible the increased exposure of the workers and public to radiation must be added to the costs incurred in processing the tailings. Economics of Metal Recovery from Tailings

Economic Comparison for the Reprocessing of Mill Tailings at the Naturita and Moab Mill Sites Naturita Mill Site Data obtained from Phase II Title I Engineering Assessment of Inactive Uranium Mill Tailings, Naturita Site, Naturita, Colorado (Ford, Bacon & Davis Utah, Inc., November 1977). Reported Values:700,000 tons of tailings % U3O8equates to 0.94 lbs per ton % V2O5equates to5.78 lbs per ton (V2O5) Period of operation:4th Quarter of 1977 thru 2nd Quarter of 1979 Market Prices (1977):$42.40 per lb U3O8; $6.05 per lb V2O5 Value per Ton:0.94 *$ * $6.05 = $ $34.97 = $74.83 per ton Ranchers estimated the cost of reprocessing to be between $30 $34 per ton.

Economic Comparison for the Reprocessing of Mill Tailings at the Naturita and Moab Mill Sites Moab Mill Site Moab data obtained from J. Berwick, DOE Reported Values:10,500,000 tons of tailings to be 72mg/kg U3O8equates to lbs per ton 780 mg/kg V2O5equates to1.56 lbs per ton (V2O5) Market Prices (2004):$19.25 per lb U3O8; $5.00 per lb V2O5 Value per Ton:0.144 *$ * $5.00 = $ $7.80 = $10.57 per ton Ranchers estimated the cost of reprocessing to be between $30 $34 per ton (1977)

Economic Comparison for the Reprocessing of Mill Tailings at the Naturita and Moab Mill Sites Conclusions From a strictly economic standpoint (i.e., notwithstanding 25+ years of inflation, recovery rates, and other factors that may potentially influence the decision to reprocess the Moab tailings), the value of the minerals (uranium and vanadium) in the Naturita tailings was approximately 7 times the value of the same minerals in the Moab tailings. If reprocessing costs remained equitable to those estimated in 1977 ($30 per ton), reprocessing the Moab tailings would not be economical.

Metal recovery from the legacy tailings is seldom economically feasible. Beyond metal content and form of the metal in tailings the economic feasibility depends on the market price of the respective metal. To assess the feasibility of metal recovery, complex and costly investigations are required. To get private companies with the necessary know how and technology interested in tailings reprocessing it is recommended to define projects, which combine recovery and remediation in one project. The project implementation could then be done by means of a public-private partnership. The governments would fund the remediation and request the private company to investigate the feasibility of metal recovery within the remediation project as well. This would provide the necessary incentive (i.e. additional profit) to the private enterprises to investigate the feasibility of tailings recycling and -if feasible- make the investment into the processing plant. The funding of the remediation project, provided by the government could be covered by a combination of international funding (WB, EBRD, EIB, NIB/NEFCO, or other institutions) and co-funding from the national budget. Recommendations re project proposals for tailings remediation in Central Asia

Thank you for your attention