PANDA Cryostat and Yoke

Slides:



Advertisements
Similar presentations
Resources in Construction / Materials. Materials for Construction No construction project can proceed satisfactorily without materials. In smaller companies.
Advertisements

COIL & ASSEMBLY READINESS REVIEW, SEPT 2013 D. Smekens.
Development of the Wastewater Collection and Treatment System in Szombathely County Town Implementation of sewage-sludge Composting Plant 2003/HU/16/P/PE/021.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
ACTION PLAN LIN ASSISTANT ENGINEER KUNMING-CHINA.
An SRF Single Cavity Horizontal Test Facility Tom Peterson, Fermilab May 10, 2005.
CBM Superconducting Dipole Magnet
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Project schedule and status R. Guida, F. Ravotti, D. Pfeiffer November 14th, 2012 GIF++ users meeting.
RECOMMENDATIONS ON IMPROVEMENT OF PUBLIC PROCUREMENT SYSTEM Experts: Bazakeeva Jyldyz Jamanchaevna Abdymomunona Saina Ryskeldievna Recommendations were.
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
TE-CRG Activities D. Delikaris, TE-CRG.
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
IT-4135/EN Supply of Air Handling Units for Industrial HVAC Projects at CERN Technical Specification Paul Pepinster / EN-CV.
EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
PANDA, GSI, Electrically Cooled Ge-Detectors development Status Report I. Kojouharov.
Panda Forward Dipole Magnet design status International Workshop on Antiproton Physics and Technology at FAIR November 2015 Budker Institute of Nuclear.
Status of the PANDA Solenoid Magnet Production in BINP
Demineralised water cooling system
Teleconf ACS – FREIA 28th March 2017
Teleconference ACS – FREIA 31th May 2017
High energy beam transport.
Status of the PANDA Solenoid Magnet Production in BINP
CBM magnet overview of the BINP work
Status, Schedule and EVM for the test facility project
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
Status of the PANDA Magnet mechanics (yoke & cryostat)
Status of pre-production at TESLA
Solenoidal magnet. The status of manufacture, forthcoming works
6th BINP-FAIR-GSI Workshop,
PANDA Yoke of the Magnet
Status of work on the cryostat design
BDS Cryogenic System RDR Status and EDR Plans
BINP, Sergey Pivovarov, Panda magnet meeting at GSl, June 07, 2016
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
Teleconference ACS – FREIA 10th May 2017
Teleconference ACS – FREIA 17th October 2017
(Procurement, testing of magnets)
Status of the PANDA Magnet
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
(vertical cryostat, Gersemi)
Mauro Morandin & Antoine Daël
Cryostat design and heat loads
Pre-contract Planning and Practice
Status of the PANDA Solenoid Magnet Production in BINP
Teleconference ACS – FREIA 20th February 2018
Chapter 11 Production.
Assembly, survey, alignment of the CBM Dipole Magnet
Updated concept of the CBM dipole magnet
IECEx ExTAG Training Workshop 29th September
Status of the PANDA Solenoid Magnet Production in BINP
HIGH POWER AMPLIFIERS For WARM LINAC Arash Kaftoosian
Prototype cryomodule development
PANDA The conceptual design of the control Dewar
The Common Shielding Project
as a prototype for Super c-tau factory
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
European Statistical System Network on Culture (ESSnet Culture)
LCGT f2f meeting ICRR Kashiwanoha
TIMELINE FOR IIIB LOCOMOTIVE DEVELOPMENT
Budker Institute of Nuclear Physics,
Teleconference ACS – FREIA 19th June 2017
Bunker Project Schedule/Budget
UPPSALA UNIVERSITY_GERSEMI PROJECT
East Hall under construction
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

PANDA Cryostat and Yoke Status of work BINP, Sergey Pivovarov, Panda magnet meeting at GSl, September 08, 2015

Yoke, Platform and Frame

BINP received the specification of Yoke, Platform and Frame of PANDA detector on May 2015. According this specification we began work with BINP design department, technology department, BINP workshop and Russian plants.

3D model of the Yoke, Platform and Frame .

We carried out a few meetings with staff of Russian plants We carried out a few meetings with staff of Russian plants. As result we prepared assembly drawings of the one octant of Yoke with all requirement.

Assembly drawing of the octant of Yoke

Assembly drawing of the octant of Yoke

According this drawings the plant sent to BINP a offers According this drawings the plant sent to BINP a offers. Schedule of manufacturing and delivery of Yok:   Start of works 10.2015 Design works till 04.2016 Purchase raw material and instruments from 01.2016 till 01.2017 Manufacturing from 04.2016 till 06.2017 Tests in Novosibirsk side 09.2017 Delivery to GSI 12.2017 Assembly and tests in GSI side 05.2018

Manufactured assembly drawings of one octant are ready. Conclusion Manufactured assembly drawings of one octant are ready. Cost of Yoke, Platform and Frame is estimated. The cost is 3647 KEuro with exchange rate of Ruble/Euro equal 65. We need to sign of contract with FAIR to continue the design work, prepare a documentation for tenders and etc. We suggest to sign of contract with FAIR only for design work that don’t delay the project.

Cryostat and Valve Box

3D model of the Cryostat and Valve Box.

Plan of work on September, 2015: Specification of Cryostat is ready. Cryogenic scheme should be approved together with BINP. Instrumentation should be approved together with BINP. Heat loads should be approved together with BINP after final design. Preliminary assembling drawings of Cryostat are prepared. Preliminary technologic work is made. Manufacture and tests of Cryostat will be made at BINP.

Assembly drawing of the Cryostat

Assembly drawing of the Cryostat

Cost of Cryostat with Valve Box is estimated. Conclusion Cost of Cryostat with Valve Box is estimated. The cost is 2778 KEuro with exchange rate of Ruble/Euro equal 65. All instrumentation we plan purchase in European companies The drawings and valve Box will be approved by third side. We need to sign of contract with FAIR to continue the design work, prepare a documentation for tenders and etc. We suggest to sign of contract with FAIR only for design work that don’t delay the project. We will pleasure to see you in our Institute in the nearest time to see our production.

Thank for you attention!