How to increase the oil recovery in GFS Statfjord ?

Slides:



Advertisements
Similar presentations
DESIGNING A WATERFLOOD Designing a water flood involves both technical and economic consideration. Economic analysis are based on estimates of water.
Advertisements

Gullfaks Sør, N1/N0 og Gullfaksfeltet
Eksperter i Team – Gullfakslandsbyen 2008
Skinfaks/Rimfaks IOR – Strong Horses in The Gullfaks Family
31st International Conference of the System Dynamics Society Developing a Fair and Robust Energy Policy Frank Blaskovich Blaskovich Services, Inc.
NOT AN OFFICIAL UNCTAD RECORD. 2 Defining the Reservoir Defining the Reservoir WesternGeco Reserve Definition ( SPE & WPC) “ Proved reserves are those.
Classification: Internal Status: Draft WAG Mechanisms at macroscopic/ field level Presentation at FORCE WAG Seminar Stavanger, 18 Mar 2009 Anders Gjesdal.
Institute of Petroleum Engineering Transient Well Testing.
Group 2/5 & 1/6 GF Village IOR-challenge 2. Existing H1 model with permeability modifications. 1. Discuss the use of the Abio gel and how it can.
Injection of Gas and Improved Oil Recovery - the Norwegian Experience By Steinar Njå, Norwegian Petroleum Directorate.
Significant New “Learings” From An Integrated Study Of An Old Field, Foster/South Cowden Field (Grayburg & San Andres), Ector County, Texas DE-FC22-93BC14982.
National Iranian Oil Company
Dec.5, 2006 / Beijing China / 1. Dec.5, 2006 / Beijing China / 2 Sustainable Growth for Oil and Gas.
Marginal Field Development Advances in 3D Geological Modeling: How it can help?
Rune Instefjord Project leader, Gullfaks IOR
Technology for a better society 1 Large Scale Tertiary CO 2 EOR in Mature Water Flooded Norwegian Oil Fields Erik Lindeberg, SINTEF Petroleum Research.
DOC ID © Chevron 2007 Chemical EOR Implementation for the Captain Field, UK 30 th IEA EOR Symposium and Workshop September 2009 Anette Poulsen, Chevron.
Significant New “Learnings” From An Integrated Study Of An Old Field, Foster/South Cowden Field (Grayburg & San Andres), Ector County, Texas. Robert C.
Search for reserves utilizing subsea multilateral and smart well technology Vibeke Haugen GF SAT.
Classification: Internal Status: Draft Low Salinity Waterflooding: Opportunities and Challenges for Field Pilot Tests Dagmar Spangenberg, Peimao Zhang.
1 ISE 195 Fundamentals of Industrial & Systems Engineering.
Other entities Public “majors” Public “majors” ExxonMobil (2 nd to Apple), Chevron, BP, Shell, ConocoPhillips, Total ExxonMobil (2 nd to Apple), Chevron,
Reserve Evaluation for Enhance Oil Recovery Purposes Using Dynamic Reserve Evaluation Model Woodside Research Facility GPO Box U 1987 Perth West Australia.
Nexen Inc. Brian Reinsborough President Nexen Petroleum U.S.A., Inc. Friday, December 5, 2008 Challenges in the Deepwater Gulf of Mexico.
GIS Services Our long journey to an Enterprise GIS  Brief history of GIS at Noble  Map Requests  Land Focus  Data  Introducing GIS Services  Standards.
2.3 RATES OF CHANGE Calc 10/1/14. Warm-up 2.3 Rates of Change - Marginals What were the rates in the warm-up problem?
11 Drilling and Well Centre for Improved Recovery
Early Offshore Petroleum Development Cost Estimates Using GIS Narmina Lovely, GEOG 596A Advisor: Patrick Kennelly.
Reservoir Simulation Study
Ruben Schulkes Self-similarity and the need for subsea technology.
1 -Classification: Internal Painting the pores Gullfaks Diverging Pilot Well A-35 Author: Rune Instefjord,
Classification: Statoil Internal Status: Draft Technology Strategy Co-operation Force meeting
1 -Classification: Internal Gullfakslandsbyen 2011 Knut.
Automotive Management Simulatie. Objectives To let managers in the automotive branch experiment in a self intuition way without any risk, including all.
Paulus obey DAPCEP 3/29/14. A petroleum engineer is involved in nearly all of the stages of oil and gas field evaluation, development and production.
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved CHAPTER14CHAPTER14 CHAPTER14CHAPTER14 Disposition and Renovation of Income Properties.
Classification: Internal Status: Draft Gullfaks Village 2010 IOR Challenges.
Introduction to Well Completions
Trends in Energy Conference Gifford Briggs Louisiana Oil & Gas Association.
Tail production: Choosing the right strategy for Produced Water Management K.I. Andersen.
1 What is Oil Sands ? Composition – Inorganic material – Quartz sand – Water – Bitumen Unconsolidated, crumbles easily in hands.
Field Development Optimization
Continuing Challenges in the Oil and Gas Sector
INSTRUCTOR © 2017, John R. Fanchi
Hector Ngozi Akangbou*, Martin Burby, Ghasem Nasr
Visit to Statoil Sandsli, Bergen 8. February 2012
INTRODUCTION TO PETROLEUM ENGINEERING
Recent Advances in Oil and Gas Production Engineering
Energy Conservation Education: Major Considerations*
تخمین مخازن در چاههای اکتشافی
Intelligent Completion Market by Application, Component, Type, Function and by Region - Global Forecast to 2023.
Translating Portfolio Analysis to a Cost Effectiveness Frontier
Nan Cheng, Statoil 26-June-2013
Define prospect elements Estimating trap volumes HC Type Assessment
Upstream Innovations in Shale Production
$500 gas pricing Andy Wappler
”ZERO DISCHARGE” Opportunities and Challenges
Gas-Lift Breakout Sessions Fall 2003 Gas-Lift Workshop
The material balance for simple depletion defines the relation between average reservoir pressure and cumulative gas produced. The straight-line MB assumes.
Gas Condensate Reservoirs
Introduction to the Gulltopp Satellite Field
How do we use this information?
Example 1 of SPE : Simultaneous versus Well-by-Well Optimization
A Prospect A prospect is a location and depth that has been identified as a good place to drill for oil and/or gas For us to find oil or gas, certain conditions.
Gas Condensate Reservoirs
A. Dollari*, Ch. Chatzichristos and A. G. Yiotis
Group 3/4.
WELL COMPLETION AND STIMULATION BY BHARAT KUMAR HARANI ASSISTANT PROFESSOR DAWOOD UNIVERSITY OF ENGINEERING & TECHNOLOGY, KARACHI.
Gas Condensate Reservoirs
Presentation transcript:

How to increase the oil recovery in GFS Statfjord ? Forslag til Gullfakslandsbyen

Gullfaks Sør Statfjord Formation PDO 1995: Large volumes in the Statfjord fm. Main reservoir in the Gullfaks Sat. 7 wells 2000 Sm3/d. 1999: F-4 T3H and G-2 T3H in production. Produced much less than expected. Statfjord Fm. on hold. 2001: G-3 T2H in production. Behave in accordance to new expectations. Unexpected gas breakthrough. 2002/2003: IOR project initiated. Identified problems: Limited reservoir communication Gas limitation

Development of GFS Statfjord reserves F-4 and G-2 drilled DIACS and MLT G-3 drilled

GFS Statfjord Challenge: Complex reservoir with low recovery, goal +18% (LTP 2003-2008) PDO – 12.6 MSm3. Today 5.1 MSm3 Wells drilled Additional perforation of G-2 H and F-4 H in lower Statfjord (summer 2003) G –1 H with DIACS (2003), periodically shut in. G –2 YH MLT with DIACS (2004) F –2 YH MLT with DIACS (2004) G-3 Y3H, 3 branch MLT with DIACS (2005), SHUT in GI MLT with DIACS (2006), only one branch injecting

How can we increase the recovery ? Could look into: Well solutions Technological solutions Drilling has so far been challenging. Simple or complex wells ? Wells spacing ? Increase of gas injection, number of GI ? Uncertainties in reserve estimates When start blowdown ? Economic considerations Economic development No economic limitations, KPI: recovery

Reflections could be made around What should be used as a KPI ? Recovery vs. NPV Who makes the decisions? Petroleum law, partners influence Prioritarisation of gas injection or gas export ? (high gas price: more economic to sell gas than inject in marginal oil reservoir) Subsea rig availability a challenge rig costs increasing Simulation model provided, already implemented at NTNU, 2006_students