Bridge Challenge.

Slides:



Advertisements
Similar presentations
UNDERNEATH DECK TRUSS. THE NEXT 6 SLIDES ARE EXAMPLES OF ROADBEDS FOR EACH TYPE OF TRUSS BRIDGE.
Advertisements

Index Card Chair Engineering
Science Fair Project London Bridges Falling Down Kate Howard and Kira Koziak.
TODAY ADD LEGO rubric to end of your lab write-up for LEGO NXT
Popsicle Bridges. The Challenge Attention aspiring engineers! The state of Michigan needs your help. The Mackinaw Bridge is beginning to deteriorate and.
What is technology? Who are the people that make technologies? Let’s name some examples of each!
Mr. Slavinsky Walter Reed Middle School 8th Grade Physical Science
Bridge Design Report Jeremy Hennings Matt Kilmer Tim Williams Nina Mairena.
You and a partner will construct a 3 story (layer) structure that will be tested in three different types of Earthquakes. The building must be at least.
Engineering Challenges 4 th Grade. Engineer Challenge Rules 1.Show good sportsmanship. 2.Do not laugh at others. 3.No negative comments. 4.Mind your tone.
Bridging the Gap: Building Bridges 101, It Is Time to Get To Work
Elementary School Engineering Design Workshop Day 2 Copyright 2013, Oregon University System, All Rights Reserved.
Jasmin Islas Cloverleaf Elementary April Pasadena Public Library Pasadena Public Library was our first field trip. We search for books to do our.
PBL Scenarios and Questions. Scenario #1 An educational company has asked for your help to create an activity with the following materials. 20 pieces.
Paper Towers Mr. Peterson’s Science Class. Paper Towers You will work with your lab partner to build a tower as tall as possible. – One sheet of computer.
High School Engineering Design Training Day 2 Copyright 2013, Oregon University System, All Rights Reserved.
HOORRRAAAAYYYYYY GOAL... ? FINAL TEST: TEST THE BRIDGE WITH WEIGHTS TO SEE THE LOAD IT CAN CARRY BEFORE BREAKING!! PURPOSE: (FOR YOU AS GRADE 7 STUDENTS)...
The Marshmallow Challenge. Build the Tallest Freestanding Structure The winning team is the one that has the tallest structure measured from the table.
Engineering Structures Bridge Building. Structures Structures are anything that are built or constructed. These are things we live in, work in, learn.
Bridge construction.
Structures Physics Grade 6/7. What is the coolest structure you can think of?
To design a safer building Lesson 2.3
Mr. Karns’ Science Class
Paper Structure. Problem  Design, construct and test a structure that will support lbs.
Medieval Cathedral Art:Stained glass design. Single arched glass panel.
BRIDGES Beauty and Function.  The first bridges were nature-made: trees that fell across creeks or rivers.  The first man-made bridges were most likely.
Bridge Building Design Challenge
 To determine the best conditions for rust to form on steel wool.
FETTUCCINI BRIDGE PROJECT Directions for building a bridge.
Group Activity: Suspension Bridge Model
Bridge Design part 5 By Alan Pennington Note: have straws, tape and testing equipment ready.
Beam Bridge. Sidney Lanier Bridge Under Construction.
Bridges 6 th Grade WWG Science Project. Objective: Design, build and test the load bearing capacity of a scale model bridge.
Bridge Across the Room Challenge. Part One: Make a Small Model: Can you build a bridge using only newspaper that will carry a car across the length of.
Student Planner Place this in the proper place August 28, 2014 Notebook due in 2 weeks. Get it completed. END OF PLANNER.
+ 3D Printing By Yolanda Colon. + Building Bridges Original work by Yolanda Colon.
Bridge Building Challenge Materials: 24 ft. of 3/32” balsa wood and one bottle of Elmer’s glue, scissors NO OTHER MATERIALS MAY BE USED Specifications:
The space between the books should be 6 inches apart The plastic knives should be parallel to your books.
Title Science Fair Project Names School Grade Teacher Note: This slide goes on the back of your board on the top right. No names on front so that it is.
REMINDER TURN IN THE TRUSS VIEW DRAWING TO THE WIRE BASKET ON THE TEACHERS DESK. WARNING DO NOT THROW THE DRAWING AWAY. THE DRAWING IS A SUMMATIVE GRADE.
Tallest Tower Activity Form Groups of Two Using only one piece of construction paper, design the tallest tower that can stand freely for at least 10 seconds.
Leaning Tower Of Pong.
Welcome Back to Design LAB! Today’s Agenda: Understand Bridge Types
Beam vs. Suspension Bridges MRs. Geri Ruso’
Structures Paper Table.
Building for Strength and Distance
It’s kinda drafty in here…
Basswood Lengths and Quantities 12” (305 mm) Bottom Horizontals
Tim Wyckoff David Cenidoza Sachin Narvekar Felix Liu Weston Wells
CCS.2.MD.1 CC.2.MD.1 Measure and estimate lengths in standard units. Measure the length of an object by selecting and using appropriate tools such as rulers,
Types of Bridges The five bridge types are 1.arch, 2. beam, 3. cable-stayed, 4. suspension, 5. and truss. Other variations include cantilever and moveable.
How to create an Interactive Science Notebook (ISN)
EXPLORE.
By Savannah and Sophie Block 5
Bridge Construction Mr. Banks.
Building the BEST Structure Challenge
Design Brief Liam and Dorsa.
Challenge to hold the most weight
Monday, August 20, Bellwork
Constructing Your Bridge
Digestive System/Body Model
Bridges.
The Beam Bridge A horizontal beam is supported at each end by piers
Spaghetti towers engineering challenge
Materials per group. Materials per group The Challenge Build the tallest free-standing structure Measurements will be from the table surface to the.
Notebook Set Up Mr. Stanley Room 12.
A test of Engineering and Cooperation Skills
Forces: Bridge Suspension Lab
Design and build a table out of a newspaper and cardboard
Presentation transcript:

Bridge Challenge

Types of Bridges Use the class set handouts on Bridge Basics to fill out the chart in your notebook. SKETCH PROS CONS Truss Beam Suspension Arch

Types of Bridges

Examples of Truss Bridges

Toothpick Truss Bridge Your Truss Bridge will be constructed out the following materials: 1 plastic Bag of Toothpicks (approximately 500) Elmer’s glue Your bridge will be placed on top of two tables 1 foot apart. Dictionaries will be placed underneath the bridge on either side. You will work in pairs. NO GROUPS larger.

Toothpick Bridge Grading Rubric 80 60 40 20 Write Up All components of write up are complete Missing no more than 1 component Missing no more than 2 components Missing no more than 3 components 4 or more components missing Following Directions Truss bridge built out of only toothpicks and glue Bridge not built at all or other materials included Cooperation Worked cooperatively and respectfully all days of construction Worked cooperatively and respectfully at least 4 days of construction Worked cooperatively and respectfully at least 3 days of construction Worked cooperatively and respectfully at least 2 days of construction Group was unable to work cooperatively most days to build a bridge TOTAL ASSESSMENT POINTS _____/240

Paper Tower Challenge Your group will be constructing a tower made out of only 2 pieces of printer paper and 6 cm of masking tape. You can make one support beam that touches the table, but no more! Your tower cannot be taped to anything- it must be free standing

#60 Continued Draw a sketch of your final paper tower design.