AMICI WP5 INDUSTRIALIZATION

Slides:



Advertisements
Similar presentations
Training & research for academic newcomers A project of the King Baudouin Foundation © 2013 Gabriella Calderari1.
Advertisements

INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
The IGERT Program Preliminary Proposals June 2008 Carol Van Hartesveldt IGERT Program Director IGERT Program Director.
WIPO Pilot Project - Assisting Member States to Create an Adequate Innovation Infrastructure to Support University – Industry Collaboration.
Astroparticle Physics for Europe ASPERA – 2 Workpackage 5 1. Workpackage 5 - European-wide common calls and other common actions Deborah Miller, STFC.
IDARI Workshop, Tartu, June 2005 NUI Galway Work Package 4 Administration Lorna Ryan The IDARI project is financed under the FP5 Quality of Life and Management.
Final Presentation, European Cooperative House Brussels, 16 Dec.2009 Training +45 “Teachers Facilitating Learning among Elders” WP5 Test and Evaluation.
TIARA – WP6 Involving Industry in TIARA Lucio Rossi (WPD) CERN.
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
Scope of PCP Phase 1: Solution Design of Q4 First-of-a-kind prototype QUACO Bid Conference, CERN, 07 th July 2016 Arnaud Foussat, CERN TE MSC-LMF Helene.
Monitoring Visit to NatRisk Project
How to write an effective RFP
ARIES WP2 Task 2.2 kick-off Coordination, support and enhancement of communication/outreach activities for accelerators in Europe Jennifer Toes (CERN),
WP2.3 Accelerator and SC magnet TI sustainability
AMICI WP1 – Management, coordination and dissemination
AMICI WP5.2: Harmonization - Material and Component Reference
BENCH-CAN Internal evaluation 2nd semester
Innovation Development Strategy
Technical Business Consultancy Project
UNIDO-GEF Industrial Energy Efficiency Project in Macedonia
TRANSPORT SCIENCE: INNOVATIVE BUSINESS SOLUTIONS
Doing business with CERN Anders Unnervik
Update from the Faster Payments Task Force
H2020 AMICI Workpackage 4 - Innovation.
Tomasz Plasota, Bartłomiej Połeć
Impact of EU structural funds in research and innovation: the experience of the Lithuanian 'Valleys’ April, 2016.
Prototyping with industry WP5: Round Table Discussion
Work Package 2 TECHNOLOGICAL HARMONISATION Reporting period
WP5.1 Professional training and apprenticeship (CEA, DESY, INFN)
T5.2: Harmonization - Material and Component Reference
SWAMYNATHAN.S.M/TQM-UNIT4/BENCHMARKING
General Meeting cern, 10-12/10/2017 CREATIONS Demonstrators
TIARA Executive Office
P.Fabbricatore WP5 Coordinator
David Alesini, INFN-LNF, Frascati, Italy (Convener)
P.Fabbricatore (WP5 Coordinator)
Goal of the workshop To define an international roadmap towards colliders based on advanced accelerator concepts, including intermediate milestones, and.
Ways to industry participation in CLIC 24th October, 2017
Research and Innovation Staff Exchange
‘Accelerator and Magnet Infrastructure for Cooperation and Innovation’
WP4.1: Industry Survey – Accelerator Technologies
Module No 4: EU programme awareness/grants for rural micro-enterprise
WP4– Points of discussion
“CareerGuide for Schools”
V-Con project (October March 2017)
AMICI WP5 INDUSTRIALIZATION
Communication and Consultation with Interested Parties by the RB
Module 5 The Climate Expert and your role as a consultant
ESS Cooperation: New Financial supporting frameworks?
EU-RUSSIA Cooperation in Energy Efficiency
Olivier Napoly, coordinator CEA/Irfu
AMICI Work Package 3 „Cooperation“
The partnership principle in the implementation of the CSF funds ___ Elements for a European Code of Conduct.
Transfer of Medical Devices Manufacturing Technology
P.Fabbricatore (WP5 Coordinator)
RECARE set-up Rudi Hessel on behalf of coordination team
AMICI WP1 – Management, coordination and dissemination
ESS Vision 2020.
H2020 AMICI Workpackage 4 - Innovation.
TOP6 – WP4 Coordination and Management JPICH Coordination Office
M.V. de la Fuente; D. Ros; M.A. Ferrrer; J. Suardíaz;
SuperBIO: Evaluation Els Van de Velde
CO-DESIGN PARTECIPATE PATH family school territory
FAA Center of Excellence for Technical Training and Human Performance
AMICI WP1 – Management, coordination and dissemination
Work Package 3 „Cooperation“
TOP6 – WP4 Coordination and Management JPICH Coordination Office
ESS Vision 2020.
Project DIRECT Final Summary
Presentation transcript:

AMICI WP5 INDUSTRIALIZATION Salerno Jan 23rd 2019

Industry for Research’s benefit Objectives of AMICI WP5- Industrialization: Industry for Research’s benefit With this WP we aim to sensitize and train the industrial companies in the needs, the knowledge (know-how), the techniques, the methods and the quality standards involved in the accelerator and superconducting magnet technologies developed in the Technical Infrastructures.

The WP5 4 Tasks T5.1 Professional training and apprenticeship Task Leader: C. Madec (CEA) T5.2 Harmonization- Material and Component References Task Leader: M.Fouaidy (CNRS) T5.3 Harmonization - Cryogenic Safety Procedures Task Leader: S.Grohman (KIT) T5.4 Requirements and conditions for developing prototypes with the industry Task Leader: M.Michelato, F. Broggi (INFN)

For any task 1)  Recall of the objectives of the Task 2)  Expected results 3)  Work already done 4)  Work to be done until the end of AMICI 5) Critical issues 6) Future perspectives

All milestones (supported by internal reports) were achieved 24

DELIVERABLES: deadlines (as in the proposal) and requests for extension 30 30 30

T5.1 Professional training and apprenticeship Task Leader: C. Madec Participants: CEA, DESY, INFN, STFC

What about the scopes? Promoting professional skills training and cross improvement between research laboratories and industry Training and apprenticeship in TI. Defining the conditions and setting the basis for an apprenticeship program, where professional technicians and young engineers from relevant industrial partners would be trained by hands-on fabrication, assembly or test of accelerator and magnet equipment and by exercising key techniques Training and apprenticeship in industry. The engagement in industrial R&D activities and in services to the industry aimed at innovating their products and processes would benefit from the secondments of researchers and technical personnel within the companies themselves.

Survey of the practice in TI in training and apprenticeship What has been done After the Industry day in Padova, a working group with industry was formed (40-30, Elytt and Alsyom) and meetings were held, some times with participation of other Task (5.2 and 5.4) Survey of the practice in TI in training and apprenticeship Survey of the practice in Industry in training and apprenticeship Summarized in preliminary reports

Ongoing activities Since companies could not express their needs in terms of training, WP5.1 has listed the trainings that could be available to companies at TI List will be sent to companies after modification with AMICI TI inputs.

A relevant point: certification Training preparation and participation certificate : To agree on which TI can teach which topic and whom. To agree on the content of the trainings (what should be tought), meetings between the relevant TI to establish the content on targeted subject (for example on CR assembly, CEA and DESY, on magnet CEA and CERN). To review periodically the content and make it evolve To attest that companies have attended and circulate the information between TI and register on a common database ? and to issue a document stamped by AMICI We do not substitute to general trainings. We should not use the term certification since we don’t have the certification status.

An objective still requires some effort Training and apprenticeship in industry. The engagement in industrial R&D activities and in services to the industry aimed at innovating their products and processes would benefit from the secondments of researchers and technical personnel within the companies themselves. CEA responsibility, the final report is due by INFN. Something done: 1) Survey of training existing in industry; 2) Industry was inquired and does not seem well accepting secondments from TI, but it is possible the questions was not correctly asked. In AMICI some doubts about this activity but .. … there are examples of secondments of Academia in Industry funded with public funds. We need more examples. We think to PhD students or young researcher as making secondments in industry

Open questions and future perspectives How to finance the training : Can a training be given in a country different from the trainee company country be included in the state law financing? Do european funds exist to support trainings expenses ? The next steps : Could we create a « fund » with contribution of interested companies and practice the training? Creating a consortium of infrastructures and companies in order to train/learn when contracts for next accelerators or magnets construction are issued or ….

T5.2 Harmonization- Material and Component References Task Leader: M.Fouaidy Participants:CNRS, CEA, DESY, IFJ PAN

As stated in the AMICI proposal: Objectives of WP5.2 As stated in the AMICI proposal: “Establish a common knowledge, background and use among Technological Infrastructures and related laboratories and industries in relation to material and components involved in accelerator and large superconducting magnets. “ Main idea: Accelerator performances are based not only on accelerator systems design but also on material or component choice and specifications. Data and characteristics of these are not easy to find in papers and knowledge sharing is more commonly done with private communications. Even on raw materials, non-standard use in an accelerator environment (radiation, cold temperature…) add difficulties to find corresponding data. Main outcome: Create a reference database for material/component used in accelerators (accelerating structures, magnets, diagnostics, ancillaries…) and start to fill it with relevant data.

How AMICI Database will be working Functional database. This has been debated. Indications for finding the best way for connecting materials to components. Some examples of structure will be implemented (This requires 5-6 months at IFJ-PAN)

T5.3 Harmonization - Cryogenic Safety Procedures Task Leader: S.Grohman Participants: KIT, CEA, CERN

T5. 4. Requirements and conditions for developing T5.4 Requirements and conditions for developing prototypes with the industry Task Leader: M.Michelato (F.Broggi) Participants: INFN

What we are speaking about Model: A device based on first development of conceptual ideas with a scaled approach. Tooling not (fully) available yet. After some or many models …. Prototype: An almost mature component, for final assessing and training of tools and manufacturing methods . In principle it could be used in an accelerator. After one or some prototypes … Mass Production: Mature components. No more changes applied wrt the last prototype

What has been done Formation of the WG with industry Questionnaire for basing the discussion Interest of industry in collaboration for prototype 3.1 Early involvement of industry (not for model !) 3.2 Market potentiality 3.3 Prototype in Industry rather than in TI 4) A proposal from industry: The subsidiary principle 5) A first approach to the management of IP (after a dedicated workshop AMICI-ARIES at CERN) 6) Investigation about Legal Framework

LEGAL FRAMEWORK FOR PROTOTYPE DEVELOPMENT WITH INDUSTRY • Partnership for Innovation • Pre-commercial procurement (PCP) • Competitive procedure with negotiation • Competitive dialogue … all these procedures based on open selection

Critical Issues 1) Possible scheme for IP managing between TI and Industry On the basis of the current experience, it is commonly believed that possible schemes for managing the IP in the TI-Industry collaborative developments can be found case by case. The IP can be in general subdivided into three categories: 1) open access, 2) limited access under Non-disclosure agreements, 3) Not accessible documents. 2) Moving from prototype to mass production (maybe from models to prototype and then to mass production) some problems can arise due the limitations to lock-in included in the national laws for public contracts. Large contract protype+ series or results from R&D to be made public.

What could be done Better discussion about the subsidiary principle Open problem: From prototype to mass production (avoid the “lock-in“) Open problem: Too much IP spreading Need to have a feed-back from a wider audience

Future Some deeper investigation of the above points Define a code of conduct to be applied in the relationships with Industry in a way to be as possible not conflicting with the European laws for public contracts

Thank you for your attention