CHIC: Possibilities of Supply

Slides:



Advertisements
Similar presentations
Database Workshop Report
Advertisements

Used to Procure Goods & Supplies. Office supplies Operating supplies Computer hardware and software (non- capitalized
Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
Open Space JIRA and Confluence Leandro Fernández & Iñigo Alonso ICS November 7, 2014.
EPICS Meeting 2005ORNL Rdb systems at SNS Jeff Patton and cast April 27-29, 2005 EPICS Meeting 2005.
CSE Design Lab Milestone IV Dennis O'Flaherty James Hopkins Dave Festa Karl Schwirz.
ROI. Retail$49.99 Wholesale$39.00 Hardware license($7.00) Manufacturing, packaging, manual($3.00) Distribution costs($0.50) Net revenue per unit$28.50.
The Technion Israeli Institute of Technology Intel Inc. A cooperation of:
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
IRAI Softwares for industries and schools November 2014.
European Organization for Nuclear Research LHC Gas Control System Applications G.Thomas, J.Ortola Vidal, J.Rochez EN-ICE Workshop 23 April 2009.
Ethernet Based Embedded IOC for FEL Control Systems J. Yan, D. Sexton, Al Grippo, W. Moore, and K. Jordan ICALEPCS 2007 October 19, 2007 Knoxville Convention.
Robotics & Engineering Design Projective Management Chin-Sung Lin Eleanor Roosevelt High School.
DISCS - Distributed Information Services for Control Systems
Computer Components Natasha Baker.
Neutron Chopper Technologies Work Package
What’s NEWONE ? Areas of Business Product Lines Share the Vision.
News from LAL on Vacuum System Racks for cryotraps: call for tender done provider selected purchase of electro-tech components in progress prototype expected.
December 2004EPICS JAERI/ KEK 1 EpicsOra EpicsOra and I/O hardware Judith Rock, Anatoli Khvorostianov.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
P 5 CONNECTING HARDWARE Lynda Spencelayh 1. Connecting hardware This is a practical task you will be expected to evidence these procedures via photos.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
Electrical Engineering for NSS - Status and Planning- Thomas Gahl Electrical Engineering Group Leader February 26, 2014.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
ESS Machine protection review Welcome Henrik Carling ESS/ICS Date:
ESS Integrated Control System Software Core Components S.Gysin
ORNL is managed by UT-Battelle for the US Department of Energy Status Report: Data Acquisition and Instrument Controls for the Spallation Neutron Source.
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
ESS Vacuum Standardization
Instrument Construction Phase 1 and beyond Rob Connatser Chief Instrument Project Engineer September, 2014.
In-Kind Strategy Integrated Control Systems Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
ICS interfaces Timo Korhonen ICS Apr 22, 2015.
 SOFTCON SYSTEMS PVT. LTD. (SSPL) offers unique, creative and practical automation solutions in the field of Process & Power on an LSTK / EPC basis with.
Controls Software Developer - Summer workers The Machine Directorate at the European Spallation Source (ESS) in Lund, Sweden, invites applications for.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Process Control System Requirements
Document No: GSC-21_034 Source: ISO/TC 184/SC 4 Industrial data
Cryogenic C&C Scope of work
HAPS Controls Glen White ATF2 Software Review Workshop, LAL, June 2008
Over 35 years experience Supplying NHS Trusts, Private Hospitals and Distributors Established 1977 Located in South Wales 350 employees Part of Berendsen.
Magnet PS Controls Hardware Status
Document No: GSC-21_034 Source: ISO/TC 184/SC 4 Industrial data
Vertical Cryostat Kick-off metting
Installation Binder / IRR – an example
Way of working with ICS HWI Hardware and Integration
Testing and deployment
Plan for controls with the digital platform
KICK OFF meeting - project presentation
ICS update 7th Experiment Control Workshop
PLCs integration into the ICS
Remote Handling Workshop Introduction
The Common Shielding Project
ESS Main Control Room & ICS Infrastructure
European Spallation Source Archiving Service
Afonso Mukai Scientific Software Engineer
MPS commissioning at ESS
Control Systems for the APTM and GRID
Author Team Supervisor A. Toral M. Mansouri S.L. Birch Y.K. Sin
DOE Review 7-9 February, 2006 Steve Lewis
Status of the ESS High Power RF Systems
Atefeh Sadeghzadeh Control engineer – Target safety and control
Internal components of a computer.
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Vacuum Control System for Monolith Vacuum
SAR MEBT Bilbao March Mats Lindroos
MRV system budget and scheduling Short overview installation
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

CHIC: Possibilities of Supply Nikolaos Tsapatsaris Group Leader: Neutron Chopper Group European Spallation Source ERIC Chopper Control Workshop 14/2/2019

Scope Definition Hardware Docs Software Service Component list PLC Software, PLC configuration, EPICS, PV setting Assembly Crate Devices Integration Cabling Connectors Testing Electrical diagram Assembly Instructions/SE Commissioning Testing procedure ESS Partner/Supplier

Conditions of using CHIC package Designs, products can not be used for profit making, sold or resold Designs, products can only be used as part of ESS instrument development, operation testing etc. CHIC can be manufactured by Partner lab Supplier ESS