Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Copyright © 2005 Advantica Inc. (USA Only) and Advantica Ltd. (Outside USA). All rights reserved by the respective owner. Own Use Gas Review of 2000 Model.
AQ Overview.  Annual Quantity (AQ) is a value held for each meter point that reflects the expectation as to the volume of gas that a meter point will.
Mod 0194 Presentation on the conclusions reached by British Gas Nick Wye On behalf of the I&C Group.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
1 Mod Review Group 126 Feb 07 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
Gas Performance Assurance Framework 11 th January 2013 Confidential.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
Allocation of Unidentified Gas Statement 2013/14 6 th February 2012.
Billing Operations Forum 24 July 2007 RbD Overview Billing Operations Forum 24 July 2007 RbD Overview Fiona Cottam.
Modification Proposal 0395 & 0398 – Limitation on Retrospective Invoicing and Invoice Correction 1 st December 2011.
RbD Subgroup Dean Johnson 8 th April 2008 RbD Subgroup Dean Johnson 8 th April 2008.
1 Mod Review Group 126 Mar 2007 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
Analysis of the Xoserve Read Validation Proposal Author: Alex Cullin 27/08/2014.
Project Nexus Workgroup Extension of Modification 0434 to permit retrospective updates pre-dating Project Nexus Go Live Date 9 th September 2014.
PN UNC Workgroup Read Validation 4 th October 2011.
1 Mod Review Group 126 Apr 2007 slides 126 Review Group – Restriction of Invoice Billing Period  These slides describe the business rules for the treatment.
Allocation of Unidentified Gas Statement – Interim Report findings 17 th September 2012.
PN UNC 4 th September 2012 Reconciliation Issues (Action: NEX06/02)
Development Workgroup 0282 Action 018 – impact on RbD 13 September 2010.
Allocation of Unidentified Gas Statement 2014/15 15 th May 2013.
Gas Performance Assurance Framework 11 th January 2013.
Calculations of Peak Load Contribution (PLC) AND Network Service Peak Load (NSPL) As of 1/1/2016.
1 Modification 0152V Implementation Matters 25 October 2007.
UNC Modification Proposal 0202 National Grid Distribution
Modification 0282 Action 002 Update
PLC = Peak Load Contribution (aka “ICAP”)
Gas Performance Assurance Framework March 2013
Options for Mod 640 Replacement
Allocation of Unidentified Gas Statement - Update
Weekly Progress Update 3rd Aug 2018
Rebecca Knight Mod 644 UIG Analysis.
Action 0002: Meter Error Notifications
SGN’s 2005/06 Shrinkage Assessment and Adjustment
Read Tolerance Scenarios - UNCVR
Extraordinary DSC ChMC
Modification th July 2008.
Large Supply Point Reconciliation which spans Pre & Post Go Live
Weekly Progress Update 13 July 2018
RAASP – Solution Options Scenario Comparison
Weekly Progress Update 15 June 2018
Modification 0117 – Additional Considerations
Project Nexus Workgroup
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Modification 0429 scenarios v2.0
Behavior Modification Report with Peak Reduction Component
Weekly Progress Update 11 May 2018
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
Actions for Mod209 Workgroup
AUG Query Responses 21st November 2013.
Project Nexus Workgroup
Nexus Workgroup Winter Consumption and the influence on Winter Annual Ratio (WAR) Bands 8th January 2014.
Nexus Workgroup Mod 0473 Presentation
Joint Theft Reporting Review (from meeting 1st March 2019)
Modification 421 – Updates and Benefits Case
Gas Performance Assurance Framework February 2013
Overview of RbD Risk Modelling 31 March 2008
AQ Review System Calculation Overview
Reconciliation Volume Impacts 25 January 2008
Invoicing Proposals 20th May 2013
Weekly Progress Update 13 April 2018
Modification Proposal 136
Unidentified Gas (UIG)
Extraordinary DSC ChMC
Annual Quantity (AQ) 45.
Development Work Group 194
Xoserve Draft UIG Incentives Modifications 20 May 2019
Presentation transcript:

Development Work Group 194 Overview of RbD Verification 27 March 2008

RbD Verification – Background Purpose RbD Verification was one the assurance activities to support the introduction of RbD in 1998 Designed to give a view as to whether RbD gives the same results as Meter Point Reconciliation within a statistical tolerance How Verification uses the “Domestic Monitor Panel” of customers maintained by British Gas Customers read their meter every week, submit reads monthly Verification calculates actual consumption from those reads Compares actual energy consumed against amounts billed via Commodity and RbD for those customers Scales up the results to match each LDZ mix of sites and calculates a total difference in kWh per LDZ

RbD Verification Outputs Comparison of actual v. billed by customer by month Commodity RbD LDZ LDZ LDZ DMP LDZ KWh Actual total KWh Billed total Explanatory items Remaining imbalance table

Verification – Explanatory Items Initial imbalance is adjusted for items which are: not present in the sample not yet processed via invoices Phasing by month unknown – totals only available

Current adjusting items Domestic Monitor Panel scaled up, plus … Unavoidable items not in sample Unidentified Theft of Gas (downstream) Late confirmed sites (orphaned energy) Historic known issues which cannot be corrected, not present in the sample, e.g. Threshold crosser exclusions (Mod 640) LDZ/postcode discrepancies Inter-LDZ unmetered transfers Total billing via Commodity/RbD, less … Timing issues, e.g. Unprocessed LDZ Reconciliations Unprocessed financial adjustments (duplicates) Threshold crosser adjustments not yet processed Annual Shrinkage adjustment not yet processed Initial graph Difference after adjusting items is the remaining imbalance

Latest RbD Verification slides – December 2007 Data available up to September 2007 National figures only reproduced (LDZ level shared with RbD Sub-Group) Statistical confidence levels: +/- 1.3% nationally Typically +/- 2.5% per LDZ Next update due at RbD Sub-Group, 8 April 2008

National Verification Update – 4 year History

RbD Imbalance – 4 year History Note: Items removed as a result of move to 4 year analysis include Temperature and Pressure Adjustments, Threshold Crossers 2000 to 2003 and Historical Shrinkage Adjustment

RbD Imbalance continued – 4 year History

Imbalance Breakdown – 4 year History .