Supplier Problem Resolution Problem Improvement Request

Slides:



Advertisements
Similar presentations
Quality Management System Corrective and Preventive Actions Argenis Osorio – Manager, Quality Assurance 19 September 2013 FACULTY MANAGEMENT.
Advertisements

ISO 9001 : 2000.
1 Supplier Improvement Program PIA Government Systems Meeting Lexington, KY 6 August 2010.
Establish Verification Procedures (Task 11 / Principle 6)
First Article Inspection 9102 Carl ZimmermanSept,2013.
4. Quality Management System (QMS)
Training.
4. Quality Management System (QMS)
Five Star Quality Consultants Implementing ISO 9001 Corrective and Preventive Action.
Elements of Internal Controls Preventing Fraud, Waste, and Abuse in Urban and Rural Transit Systems.
Effectively applying ISO9001:2000 clauses 5 and 8
The Role of the Internal Auditor for Maintaining System Compliance and Promoting Continuous Improvement Wayne M. Uttke
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
Elements of Effective Behavior Based Safety Programs
Hazards Identification and Risk Assessment
Technical advisory panel Mission Brief. Requirements Have the principal requirements of the facilities suite of instruments, in terms of equipment types.
ISO NON-CONFORMANCE, CORRECTIVE AND PREVENTIVE ACTION.
Process System Capability An introduction to 9103 ‘VARIATION MANAGEMENT OF KEY CHARACTERISTICS’ Bernard LAURAS AIRBUS.
Exercise 1 Tor Stålhane IDI / NTNU. Intro The strength of ISO 9001 and many other standards is that they focus on “What shall be done” and leave “How.
ISO, QMS & CIR Awareness 2013.
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
Implementation into Child Nutrition Programs
Introduction This presentation is intended as an introduction to the audit process for employees of entities being audited by MACD. Please refer to the.
Quality management systems – Requirements
Topic 5 Initiating a project
1 © The Delos Partnership 2004 Project Management Executing the Project.
TOTAL QUALITY MANAGEMENT
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
OHSAS Occupational health and safety management system.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
IT Infrastructure Library (ITIL) For You -With Max Mart The ManageEngine Guy!!

Principal Investigator ESTCP Selection Meeting
Procurement- Lecture 3 Customer service and logistics
Strategic Information Systems Planning
Project Management PTM721S
ISO 14001: 2004 Environmental Management Review Presentation
The Five Secrets of Project Scheduling A PMO Approach
Incident Management Incident Management.
Warranty procedure Index Overview
Module 6 Corrective Action Request (CAR) Overview
How to Implement an IG Manufacturing Quality Procedure System
Principal Investigator ESTCP Selection Meeting
Global 8D Problem Solving
Safety Accountabilities
ISO 9001:2015 Auditor / Registration Decision Lessons Learned
KMCO CAPA System Training
Mastering Change Control
ISO 9001 Awareness Training.
Establish Process Governance
همسویی چارچوب‏هاو به‏روشهای حاکمیت و مدیریت فناوری اطلاعات
Agenda Who are we? 1 Introductions Journey so far 2
Quality Assurance of Assessment Arrangements
Capability Maturity Model
SCAR Corrective Action Report Supplier Quality Assurance
Take Control Over Underwriting Quality and Leakage
See the possibilities TM.
AS 9100 Awareness Training.
Principal Investigator ESTCP Selection Meeting
Establishing a Strategic Process Roadmap
Capability Maturity Model
5 Why Process/Guidelines
Supplier Briefing Pack
KVI Analysis for period 1st May 2018 to 31st March 2019
MODULE 7 Definitions Module 7 page 1.
Principal Investigator ESTCP Selection Meeting
Good Governance and an Effective Board of Trustees
Radiopharmaceutical Production
KVI Analysis for period 1st May 2018 to 31st March 2019
Presentation transcript:

Supplier Problem Resolution Problem Improvement Request Briefing Pack Problem Improvement Request (PIR)

Problem Improvement Request Introduction: For all Concessions, Quality Escapes, Customer Complaints, delivery issues or product rejections, effective completion of the PIR is a pre-requisite of the Non-conformance Process. The PIR process will identify products and processes that can be exposed to similar non-conformance, which can be addressed via "read across" action. Key Questions: Has the Problem been effectively contained, and by what means? Does the PIR and actions detailed actually address the root cause(s) of escape and problem? Are the stated actions plausible and the true root cause(s) of the escape and problem? Is there sufficient detail and supporting data to underwrite the cause(s)? Is there objective evidence to demonstrate that a thorough process has been followed to establish why (e.g. 5 - Why's, Cause & Effect Diagram etc.)?

Problem Improvement Request Continued: Having established the root cause, we customers expect robust and demonstrable corrective action: Are the actions identified meaningful and accurate? Is the implementation of corrective actions scheduled to be achieved over a realistic timescale, relative to the severity of the original problem and it's affect on the customer Are all corrective actions in place / complete, verifiable and by what means?

Problem Improvement Request Our perspective : The PIR Process is structured to enable suppliers to investigate non-compliance within their systems and return them to a compliant state. Suppliers should be using the tool not only to facilitate the acceptance of non-conformance but also as a vehicle to eliminate any future recurrence and protect the customer. The PIR is / should not be viewed as an afterthought, nor should it be seen as a burden. The supplier has ownership of the document and all associated actions identified / detailed therein - that owner has the ability to both identify and drive change, or process improvement - as appropriate.

Problem Improvement Request The suppliers perspective should be : The PIR is the tool that will be used to improve the business and drive down the cost of non-quality. There is an on-going commitment to improve the business and eliminate unnecessary waste. In the case of non-conformance, use of the PIR is a critical part of that process to ensure the Escape & Problem will not re-occur and not just a short term vehicle raised to re-commence deliveries. There should be an on-going review of all PIR's raised to assist in monitoring overall process compliance - not just at the next concession arising! The PIR can be used to support / justify investment in the process.