Presented By E. Cheri Miller

Slides:



Advertisements
Similar presentations
Waste Water residuals and land application
Advertisements

The Committee and Research – Where are we and where might we be going?
Northampton Generating Company, L.P. Northampton, PA
Techniques to reduce sulphur oxide emissions
Air Pollution Control « Air Pollution Control Ordinance » ( Chapter 311 ) The Air Pollution Control Ordinance(APCO) is the main legislative framework.
Comparative LCA of Flooring materials: Ceramic vs. Marble Tiles
© 2005 STS WMH StS WM Surface to Surface Waste Management Holdings Inc. September 2005.
Opportunities and Challenges of Marketing FGD - Gypsum to Agriculture David Flack Marketing Director Ag Spectrum Company.
U.S. Energy Information Administration Independent Statistics & Analysis 2014 Electricity Forms Re-clearance Vlad Dorjets, Form EIA-860 Project.
Generation of Radioactive Waste Radioactive Waste Management and Disposal NUCP
Florida Department of Environmental Protection David Read Cement Subproject Manager Bureau of Air Regulation Cement Mercury Subproject.
Treatment and Discharge of FGD Liquid Wastes
Closure of Animal Waste Lagoons John W. Worley. Lagoon Closure u What is required? u What are options for managing an inactive lagoon? u What does an.
Developing Coal Tar/ Petroleum Pitches
Chapter 24 Solid and Hazardous Wastes
CTC 450 Review Secondary Treatment Trickling Filters Biological Towers
Control of Sulfur Oxides Dr. Wesam Al Madhoun
ReduDust A System for Bypass dust recovery By: Ing
Synthetic Materials - Synmat History Founded 1994 Mission: Acquire and develop sources of synthetic gypsum.
FGD, SCR, & Other Retrofit NOx Controls FGD, SCR, & Other Retrofit NOx Controls Presented by: Joe Ennis, Director Project Engineering APP Site Visit October.
Managing coal combustion residues Information from: Managing Coal Combustion Residues in Mines Committee on Mine Placement of Coal Combustion Wastes,
1 EGTEI – 22 November 2011 Nadine ALLEMAND – EGTEI secretariat Pilot Study on Cost Analysis applied to the Apatity Power station Preliminary results Cooperation.
Use of FGD Byproducts in Agriculture: DOE Perspective Workshop on Research and Demonstration of Agricultural Uses of Gypsum and Other FGD Materials St.
Lime Softening. Resources and Materials Students should review and utilize the following on-line resources:
CONTROL OF SULFUR DIOXIDE AND SULFUR TRIOXIDE USING MAGNESIUM-ENHANCED LIME Joseph Potts and Erich Loch Cinergy Corporation Lewis Benson, Robert Roden.
Performance and Benefits of Flue Gas Treatment Using Thiosorbic Lime
Florida Department of Environmental Protection Alvaro Linero, P.E. Administrator, Special Projects Bureau of Air Regulation Mercury Puzzle Hg(0), Hg(II),
Wednesday, 12/12/2007, FYROM Prevention of Contamination from Mining & Metallurgical Industries in FYROM Strategic Plan for Prevention of Contamination.
1 REFINERY OILY RESIDUALS COST MINIMIZATION STRATEGY DSM ENVIRONMENTAL SERVICES, INC. P.O. Box Houston, TX (281)
Monday, 10/12/2007, SERBIA Prevention of Contamination from Mining & Metallurgical Industries in Serbia Strategic Plan for Prevention of Contamination.
Proprietary work product, not for reproduction 1 BIOMASS GASIFIER 20 MW POWERPLANT Energy & Environmental Integrators Note! This system can be scaled from.
Steam Power Station Presented By Ashvin G. Patel Asst. Prof. (E.E.)
The Importance of FGD Gypsum To the CCP Industry By David Goss, Executive Director American Coal Ash Association OSU – EPRI Workshop St. Louis, September.
11/02/2002 K.Sen, CFRI 1 Some Design Aspects on the Mini Coal Slurry Flotation Plants Kalyan Sen Central Fuel Research Institute Dhanbad ( India )
FGD MONITORING PROJECT ORSANCO Technical Committee Meeting June 4, 2013 Item 8a.
Lecture Objectives: Finish boilers and furnaces Start with thermal storage systems.
Pollutants in wastewater -- Revisited Ammonia Organic matter Nutrients Pathogens Color Metals and SUSPENDED SOLIDS.
Oxides of Sulfur SOx. SO2: largest amount SO3 very small amount 2SO2 + O2 SO3.
Formation and Treatment
Fossil Fuels Chapter 19.
 Products of incineration  sifting  fine material include ash, metal fragments, glass, unburnt organic substances etc..  residue  all solid material.
Agricultural Applications of FGD Materials Jim Roewer FGD Agricultural Use Workshop September 13, 2006.
Environmental Dredging of Perfluorochemical-Impacted Sediment from a Sensitive Wetland Mark A. Gaetz (3M) Paul Lear (WRScompass)
Solid Waste Ecological Issues Winter Mobro 4000 March 22, 1987 – 3,168 tons of garbage refused as landfill in Islip, NY Transferred onto the barge.
Value to Utilities of Agronomic Uses for Gypsum Lamar Larrimore Southern Company September 13, 2006.
Eco·Systems, Inc.. Beneficial Reuse of Industrial Byproducts Definition- turning an industrial byproduct into a valuable commodity Examples – Coal Combustion.
Environmental Science Chapter 19 Section 1
Scrubbers Colloquium N. Maximova and the class. Puu
“ Service & Product Pitfalls to Avoid in the Agricultural Market”
Hazardous Waste Any waste that is a risk to the health of humans or other living things.
Control of Sulfur Oxides
I. Solid WasteSolid Waste Chapter 19 Section 1. Classroom Catalyst.
Section 2.  Exploring rock for mineralization is the first step in finding an ore deposit.  Rock samples are taken from exploration areas and analyzed.
 reshWater/acidrain.html.
MICHAEL E. SCOTT, DEPUTY DIRECTOR DIVISION OF WASTE MANAGEMENT Available Information on the Beneficial Reuse of Coal Combustion Products 1.
NPDES Permitting for Coal Ash Ponds in North Carolina EMC Meeting January 12, 2012 Sergei Chernikov, Ph.D. 1.
Describe the manner in which mining companies explore for new mineral deposits. Describe three methods of subsurface mining. Describe two methods of surface.
KeLa Energy, LLC 12 th Annual Green Chemistry & Engineering Conference Recycling and Clean Coal Technology.
Conventional Sewage Treatment Plants:
Solid Handling Systems Of FFBL Coal Power Plant Project(CPP) Project
Solid Waste Management and Disposal
Lecture (8): liquid wastes treatment (primary, vital, advanced).
Mineral Exploration Exploring rock for mineralization is the first step in finding an ore deposit. Rock samples are taken from exploration areas and analyzed.
Air Quality & SO2.
CTC 450 Review Secondary Treatment Trickling Filters Biological Towers
Control of Sulfur Oxides Dr. Wesam Al Madhoun
Objectives Describe the manner in which mining companies explore for new mineral deposits. Describe three methods of subsurface mining. Describe two methods.
Objectives Describe the manner in which mining companies explore for new mineral deposits. Describe three methods of subsurface mining. Describe two methods.
CE 445 Wastewater Reclamation and Reuse
Presentation transcript:

FLUE GAS DESULFURIZATION (FGD) GYPSUM PRODUCTION, PROCESSING AND DISPOSAL Presented By E. Cheri Miller Specialist, Fuel By-Products and Marketing Tennessee Valley Authority

WHAT ARE FGD SCRUBBERS?

FGD PRODUCTS Many different products from the various FGD processes, primarily: Lime/limestone force oxidized (LSFO) = Calcium sulfate dihydrate (gypsum) Lime/limestone unoxidized = Calcium sulfite Fluidized bed ash and dry scrubbers = mixtures of char/fly ash and spent bed material or sorbent containing CaO, CaSO4, CaSO3 and ash Wet ammonia = ammonium sulfate

FGD PRODUCTS (cont.) Products of Lime/Limestone Forced Oxidation processes are most often sought for agricultural use Readily dewater to 7-12% moisture even without mechanical dewatering equipment Are easily reclaimed from ponds, stored, transported and spread using conventional equipment Unoxidized Lime/Limestone FGD products are thixotropic sludges (consistency of toothpaste—may liquify when shaken) Difficult to dewater Require some sort of processing or admixture such as fly ash or lime to achieve moisture levels that can be handled Cannot be easily stored, transported or spread with conventional agricultural equipment

FGD Gypsum Management In “once-through” systems, bleed stream from the scrubber absorber tank is usually at 12-30% solids and low chloride levels. Filtrate from gypsum dewatering is not recycled In “closed loop” systems, absorber tank will concentrate chloride levels to very high levels (20,000 ppm or more) as filtrate from gypsum dewatering is recycled back into the scrubber cycle

Limestone Forced Oxidation Process

FGD Gypsum Management (cont.) Gypsum can be mechanically dewatered using vacuum filters, rotary drum filters or centrifuges Mechanical dewatering results in a gypsum cake product which can have moisture levels as low as 5% Mechanical dewatering also allows for control of particle size, chloride content and removal of impurities

Vacuum Filter Belt

FGD Gypsum Management (cont.) Gypsum can also be dewatered in ponds managed as “rim ditch stacks” The large size of FGD gypsum particles (average 45 microns) allows the material to readily dewater in ponds Gypsum ponds/stacks can dewater product to 7-12% moisture by natural gravity drainage and drying depending on temperature and rainfall

Overview of LSFO Operation—Gypsum Pond with Fly Ash Silos in Foreground

Rim Ditch Stacking

Rim Ditch Stacking (cont.) FGD Gypsum which has been deposited in a pond or stack is easily reclaimed for marketing using either conventional earth moving equipment, or Can be reclaimed using a hydraulic dredge and re-slurried back through the mechanical dewatering system

Hydraulic Dredging from Gypsum Stack

Mining Gypsum from Rim Ditch Stack Using Earthmoving Equipment

FGD Gypsum Handling Issues Dewatered gypsum is usually stored in a roofed storage shed to avoid accumulating additional moisture from precipitation and to provide wind screens to prevent dusting Reclaimed gypsum on ponds will form a crust which helps shed water and prevents dusting so long as it is undisturbed. If the crust is broken it can cause a dusting problem

Loading Trucks with Gypsum Inside Covered Storage Shed

FGD Gypsum Handling Issues Even at moisture contents as low as 5% loading does not usually cause a dust problem Covered conveyors help prevent dust problems at transfer points

Gypsum Truck Dump-Covered Conveyor

Loading Barge

Aerial View of Barge Loadout

Cost/Benefit—Marketing/Disposal The O&M cost of FGD gypsum disposal in rim ditch ponds is very low— <$1/ton Routine O&M consists of two pieces of equipment and one operator, less than 40 hr/week can easily handle >1 million tons/year because in reality you are moving less than 10-20% of the material in the perimeter dikes—the rest stacks itself in the center of the rim ditch stack Non-routine O&M is also low Placement of cover material and revegetation on side slopes Raising spillways Dust control GW/Surface water monitoring

Cost/Benefit—Marketing/Disposal (cont.) Once a utility has paid to place material in a disposal facility, the cost of disposal is a sunk cost which cannot be recovered In order to avoid disposal costs, material must be diverted before disposal—reclaiming material after disposal has no cost savings benefits In addition, even if you divert material before disposal, you will not realize any cost savings unless you move enough material to be able to reduce manpower or equipment at the disposal facility Why? Because the relationship between disposal cost and tons is not a straight-line relationship

Avoided Cost of Disposal Actual Cost Break Points Average Cost Average with Fixed Cost Total Cost Fixed Cost Tons to Landfill

Cost/Benefit—Marketing/Disposal (cont.) Example: Total annual O&M cost of facility = $500K Total tons disposed = 500K/year Nominal disposal cost = $1/ton/year Sell 50,000 tons/year No cost savings because your manpower and equipment costs have not been reduced In fact, your cost/ton actually increases (e.g. $500K/450K tons = $1.11/ton)

Cost/Benefit—Marketing/Disposal (cont.) In order to divert FGD gypsum prior to disposal, the material must be mechanically dewatered Cost of dewatering facility = $3-6 M capital Costs about $3/ton to operate dewatering facility It is doubtful that mechanical dewatering can be justified based solely on an agricultural market At sites where FGD gypsum must be mechanically dewatered so that it can be hauled to a stacking area for disposal, the utility may avoid a significant disposal cost by developing agricultural markets Cost of hauling to a stacking area for disposal will be very site specific dependent upon the distance hauled, site development costs and regulatory requirements. “Rule-of-Thumb” for estimating trucking costs: $1/ton to load truck, $1/ton for first mile, $0.10/ton for each additional mile hauled.

Potential Markets for FGD Gypsum North American Production – 2004 = 12 M tons Use - 2004 Wallboard = 8.1 M tons Cement = 0.74 M tons Agriculture = 0.13 M tons Other = 0.025 M tons

Potential Markets for FGD Gypsum Future North American Production – 2015 = over 20 million tons Wallboard Five new wallboard plants have been announced which will run on FGD Gypsum Total usage in these plants will approach 3-5 M tons/yr accounting for 12 M tons/yr

New Wallboard Plants Designed for Synthetic Gypsum 3 1 6 4 8 9 * 10 * 11 12 2 7 5 United States Gypsum Company - February 17, 2005

Potential Markets for FGD Gypsum Cement Although several new cement kilns are planned for North America, use in cement (as a set retardant and grinding aid) will not significantly increase FGD Gypsum use

Potential Markets for FGD Gypsum Agriculture Use of FGD Gypsum in agriculture is the market with the greatest potential for expanding gypsum use Application rates will average 1-5 tons/acre Concerns about heavy metals in FGD Gypsum may dampen acceptance in this market

Conclusions Total amount of FGD gypsum available for agricultural use will be ~ 7-8 million tons/year by 2015 Not all FGD gypsum will be acceptable for agricultural use because of high chloride content and potential perception issues associated with heavy metals Many FGD gypsum sources will not be located in areas where the cost/benefit of using FGD gypsum for soil amendment will justify the cost of transporting and handling the material Agricultural use of FGD gypsum will probably be opportunistic, developing primarily in agricultural areas very close to sources of material, or at sites where the utility has disposal costs that are very high At power plants where the FGD gypsum cannot be diverted prior to disposal and/or where significant quantities cannot be marketed, the utility will not be able to justify paying subsidies to market FGD gypsum If FGD gypsum is to be accepted as a bona fide commodity, the cost of utilizing the material should be borne by the end user—payment of subsidies for use of byproduct materials is usually viewed with suspicion by regulators