Similar presentations
Managing the Health and Safety of Contractors
Advertisements

Background Presenters Work done in preparation for WHS changes
OSHA’s Voluntary Protection Program (VPP) Job Hazard Analysis Mishap reporting 1 This class is only intended to familiarize you with the programs in place.
Job Hazard Analysis. © Business & Legal Reports, Inc Session Objectives Identify the purpose of JHA Recognize the benefits of JHA Understand the.
OHS Worksite Inspections February Health & Safety Systems > The goal of any health & safety system is to eliminate or reduce as far as is practicable.
Hazard identification and Risk assessment
Now is this a high risk job?. HIGH RISK JOBS – RED CODE WORKING WITH ASBESTOS, OR UNDERTAKING A JOB WHERE THERE IS A LIKELIHOOD THAT ASBESTOS IS PRESENT.
Risk Management (Safe Work Method Statements)
OH&S Management System
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
Food Safety T-1150 This work has been produced by DGL (Aust) Pty Ltd This induction package has been designed for usage on DGL’s intranet.
Responsibility Equals Accountability Dangerous Goods Logistics T-1510 How to Open & Close Extendable Tray on R-325 This work has been produced by DGL (Aust)
7/9/20161 T-1470 Induction for Stramit This work has been produced by DGL (Aust) Pty Ltd This Learner’s Tool is about the skills and knowledge required.
12/07/2006 Rev B1 T-1160 Work Permits This work has been produced by DGL (Aust) Pty Ltd This Learner’s Tool is about the skills and knowledge required.
1OHS Training 2003Induction OHS Training Job Safety Analysis and Hazard management UEENEEE037B.
Instructions The Town of Sylvan Lake’s computer based health and safety orientation is simple process. Read each slide carefully To navigate through slides.
OH&S Management System
We always have time to work safely
INTERVET DISPATCH TRAINING T-1560
Presented by Kevin Williams
Landpower Project Zero Harm Learning Series Module:. #7a Module Title:
T-1440 Pre employment Medicals and Injury Management
Coupling/Decoupling of Trailers
This work has been produced by DGL (Aust) Pty Ltd
T-1070 CHEMICAL SEGREGATION
Work Health & Safety Legislation
This work has been produced by DGL (Aust) Pty Ltd
Chep Reconciliation Learning Tool T-1400
OH&S Management System
Risk management - HIRAC awareness presentation
Landpower Project Zero Harm Learning Series Module:. #7a Module Title:
U.S.D.A. FOREST SERVICE REGION 6
Figure A Figure B 12/07/2006 Rev B
T-1340 Portable fire extinguishers
T-1530 Management of Change
T-1270 Pre employement medicals and injury managment
This work has been produced by DGL (Aust) Pty Ltd
T-1370 CHAIN OF RESPONSIBILITY (CoR)
Figure A Figure B 12/07/2006 Rev B
Figure A Figure B 12/07/2006 Rev B
T-1270 Pre employement medicals and injury managment
Figure A Figure B 12/07/2006 Rev B
Safety is part of our culture at Halliburton
This work has been produced for DGL (Aust) Pty Ltd
Figure A Figure B 12/07/2006 Rev B
T-1520 Container Unloading for Evonik
Figure A Figure B 12/07/2006 Rev B
T-1470 Induction for Stramit
T-1280 VEHICLE LOADING CRANE
Figure A Figure B 12/07/2006 Rev B
T-1440 Pre employment Medicals and Injury Management
INTERVET DISPATCH TRAINING T-1560
T-1530 Management of Change
Onsite Control of Visitors & Contractors
Figure A Figure B 12/07/2006 Rev B
Yard Truck- Shunting Within Stramit Sites
This work has been produced by DGL (Aust) Pty Ltd
Figure A Figure B 12/07/2006 Rev B
Figure A Figure B 12/07/2006 Rev B
How to Understand a MSDS Learning Tool T-1170
This work has been produced by DGL (Aust) Pty Ltd
This work has been produced by DGL (Aust) Pty Ltd
T-1530 Management of Change
Food Safety T-1150 This work has been produced by DGL (Aust) Pty Ltd
This work has been produced by DGL (Aust) Pty Ltd
T-1510 How to Open & Close Extendable Tray on R-325
Coupling/Decoupling of Trailers
T-1520 Container Unloading for Evonik
Chep Reconciliation Learning Tool T-1400
Start JSA Team JSA Note Inspect Site Hazards Resolve JSA Sign Permit
Presentation transcript:

This work has been produced by DGL (Aust) Pty Ltd T-1160 Work Permits This work has been produced by DGL (Aust) Pty Ltd This Learner’s Tool is about the skills and knowledge required for Segregating Chemicals DGL (Aust) facilities. 12/07/2006 Rev B

Before you get started 12/07/2006 Rev B It is important that you complete all sections in this learning tool as it has been designed so that You can abide by the procedures of our organization. You can apply what you have learnt in this package in your day to day activities This Learning Tool is designed to be relevant only to DGL (Aust) Pty Ltd employees and only applied whilst employed with DGL (Aust) Pty Ltd You may have already acquired knowledge in the area identified in this package as you may have completed some specialized training. Or you may have been working within the industry for some time. Should you identify any improvement opportunities in the information contained in this package or have difficulties completing the package please contact National Training and Compliance Manager DGL (Aust) Pty Ltd PO BOX 1594 EAGLE FARM QLD 4009 Ph 07 3868 1001 Fax 07 3868 1055 12/07/2006 Rev B

WHO, WHY & WHEN When are Work Permits undertaken? When conducting non-routine work activities When conducting routine work activities which are subject to specific restrictions Work Permits are undertaken PRIOR TO the works commencing. Why are Work Permits undertaken? To establish if the proposed work activity can be safely undertaken in an acceptable manner, as far as practicable. Who can undertake a Work Permit? Manager / Supervisor ONLY (HSEQ Unit available to assist if required) 12/07/2006 Rev B

A JSA APPROACH F-130 Work Permit Form redesigned to incorporate WorkSafe's Job Safety Analysis criteria. Activity/ Tasks Hazards Risk Control Measures Responsible Person(s) 12/07/2006 Rev B

A JSA APPROACH When performing a JSA (SWMS) of a work process for a work permit pay attention to these concepts. Concentrate on what has to be done Do not concentrate on how job is to be done. Look at each step and identify all the hazards. 12/07/2006 Rev B

QMS TOOLS Work Permit Form (F-130) Work Permit Procedure (P-250) 12/07/2006 Rev B

ASSESSMENT An assessment of the proposed work activity may typically involve: Undertaking an inspection of proposed work area Having a good understanding of work permit location (products stored, workplace activities occurring, underground wiring, fire protection system configurations). The Work Permit must be undertaken in consultation with the Permit Holder. Once initiated, the Work Permit is registered in the site’s Work Permit Register. The Work Permit requires sign off by the Manager / Supervisor AND Permit Holder, both prior to and upon completion of the works. Site Work Permit Register can then be closed off. NOTE: One of the most important things to remember is to keep an open mind about what can go wrong. 12/07/2006 Rev B

ASSESSMENT Cont. How to complete a Work Permit assessment? Obtain copy of Work Permit Form (F-130) Complete relevant details of Permit Holder (Contractor name & Business name) Register Work Permit on Site Work Permit Register. 12/07/2006 Rev B

ASSESSMENT Cont. In consultation with and in presence of the Permit Holder, determine: The Work Permit Activity The individual Tasks required to perform the activity in the sequence that they are carried out. The Hazards of each task that could cause injury/incident The Risk Control Measures required to eliminate/ minimise the risk arising from the hazard. The Person responsible (Permit Holder or Mgr/Spvsr) to implement risk control measures. 12/07/2006 Rev B

ASSESSMENT Cont. Discuss and determine with Permit Holder: Type of equipment expected to be used PPE requirements Location, Date and Time works are authorised for Whether Safety Attendant /Guard is required Whether any equipment requires Tag Out Whether vehicles are required to be brought on site 12/07/2006 Rev B

ASSESSMENT Cont. Discuss and determine with Permit Holder: Whether the proposed work area is a Hazardous Area. If yes, additional considerations for hazard identification and control measures may be required. If the proposed work location is an area where explosive atmospheres may be present, hand tools rather than electric tools need to be used. Whether there are any other related Work Permits underway / scheduled that may impact on these proposed works. 12/07/2006 Rev B

Section 3 & 4 Of Work Permit Form Upon completion of works, Manager/ Supervisor to inspect works for satisfactory completion and ensure work permit location has been made safe PRIOR to signing declaration. Should the works be deemed incomplete or unsatisfactory, Section 4 is to be addressed by the Supervisor/ Manager. 12/07/2006 Rev B

‘SAFETY COMES FIRST’ ASSESSMENT Cont. To Note: The Work Permit Form (F-130) provides some guidance as to safety considerations for some types of work (Hot Work, Elevated Height and Excavations/ Break In). ‘SAFETY COMES FIRST’ 12/07/2006 Rev B

ASSESSMENT Cont. Remember when performing Risk Assessment, look at the Job to be done not how you do it! Remember the sequence for changing a flat tyre from the film. 12/07/2006 Rev B

Test your knowledge Through the following slides you will be asked an number of questions to show that you have understood the content of this learning tool Please record your answer on the training form F-260. You will be required to submit the answers to the DGL HSEQ unit 7/15/2019

When are Work Permits undertaken? Question 1 When are Work Permits undertaken? When conducting non-routine work activities. When conducting routine work activities which are subject to specific restrictions. Both a & b. When ever you feel like it. 12/07/2006 Rev B

Why are Work Permits undertaken? Question 2 Why are Work Permits undertaken? To establish if the proposed work activity can be safely undertaken in an acceptable manner, as far as practicable. Because it feels good to do one. Why not it is good to do. None of the above. 12/07/2006 Rev B

Question 3 Who can undertake a Work Permit? Manager. Manager / Supervisor ONLY, HSEQ Unit available to assist if required HSEQ Unit Supervisor ONLY . 12/07/2006 Rev B

Question 4 When performing a JSA (SWMS) of a work process, what must you pay attention to? How job is to be done. Identify all the hazards. What is to be done. Concentrate on what has to be done, do not concentrate on how job is to be done, look at each step and identify all the hazards. 12/07/2006 Rev B

How do you complete a Work Permit assessment? Question 5 How do you complete a Work Permit assessment? Inspect of proposed work area. understanding of work permit location. Concentrate on how to do the job. Obtain copy of Work Permit Form (F-130),Complete relevant details of Permit Holder (Contractor name & Business name),Register Work Permit on Site Work Permit Register. 12/07/2006 Rev B

Additional information 12/07/2006 Rev B