ESR2 Process Cycle Design

Slides:



Advertisements
Similar presentations
Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 1.
Advertisements

February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
ESS Cryogenic System Design
Cryogenics Applied Technology Development Dana Arenius, Rao Ganni Engineering Division Cryogenic Systems Department Technology Town Meeting Feb 9, 2012.
Current status Arkadiy Klebaner November 21, 2012
ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
12 GeV Upgrade of Cryogenics at Jefferson Laboratory (Jlab) Dana Arenius Engineering Division Cryogenic Systems ILC08 Nov This work is supported.
Results Conclusion Methods Application of plate-fin heat exchangers with different UAs for mitigating the effects of pulsed heat load Objectives Background.
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
SOFT 2004 OVERVIEW OF CRYOGENIC TECHNOLOGY FOR THE THERMONUCLEAR FUSION P. DAUGUET, M. BONNETON, P. BRIEND, F. DELCAYRE, B. HILBERT, A. RAVEX Air Liquide.
April, 2009 ERL SRF CRYO MODULES AND CRYOGENIC SYSTEM.
Hall B Cryogenics CLAS and CLAS12 David Kashy Hall B Lead Engineer May 26, 2010.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
New compressor station Second stage of nitrogen system (N2 refrigerator, cryogenic tank, pipe lines) Cryogenic equipment required to run NICA Third stage.
Superconducting Electronics and Detectors Workshop “Jefferson Lab Cryogenic Operation” Mathew C. Wright December 1,
Restoring Komag Yasuhiro Makida Consideration of restoring and modifying Komag for a stand alone operation without the refrigerator. Contents 1.Magnet.
Cryogenics for crab cavities – SPS/LHC 2 nd HiLumi LHC meeting – Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Cryogenic refrigeration for the XFEL facility. Current status of the commissioning. Wilhelm Hanspeter Grenoble, June 4th, 2015.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Mathew Wright Cryogenic Systems Operations Engineer
PXIE Cryogenics Concept Arkadiy Klebaner Session 5 / WG1 (CW Linac and PXIE) October 26 th, 2011.
LCLS-II Cryoplant Overview
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
L Design and Optimization of Helium Liquefaction System with Targeted Capacity of 50 lph without LN2 T Maiti, S Pal, A Mukherjee, U Panda Variable Energy.
Project X Workshop - Cryogenics1 Project X CRYOGENICS Arkadiy Klebaner.
1 Cryogenic System of Interaction Region (SiD, ILD, QD0, QF1, Crab Cavity) in the Japanese Mountain Site WebEx meeting : June 19 th, 2012 IPNS/Cryogenic.
Energy efficiency considerations in cryogenics Philipp Arnold Section Leader Cryogenics Proton Driver Efficiency Workshop.
1 Young-Ju Lee Vacuum & Cryogenic Engineering Team National Fusion Research Institute Young-Ju Lee Vacuum & Cryogenic Engineering Team National Fusion.
ESS | Helium Distribution | | Torsten Koettig Linac – Helium distribution 1.
Vishy Ravindranath LCLS-II 2 K Cold Box FDR March 9, 2017
Cryoplant Installation Cost and Schedule Installation PDR
Study and Development of Large Cryogenic Systems in China
Dana Arenius LCLS-II 4.5K Cold Box Director’s Review November 16, 2016
2K Cold Box FDR Introduction
Process Simulation for the LCLS-II Cryogenic Systems
FRIB Cryogenic Support
Online Helium Inventory Monitoring of JLab Cryogenic Systems
Cryoplant Installation Scope
N. Hasan1, P. Knudsen2 and V. Ganni2
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
SPS cryogenic proximity equipment and SM18 validation
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
CRYOGENICS OPERATIONS 2008 Organized by CERN
SC1R Cold Box PDR: Process Requirements
Zhiwei Zhou, Qiyong Zhang* and EAST Cryogenic Team
Mathew C. Wright October 2016
SC1R Cold Box PDR Overview
SHMS Cryogenics and Q2(Q3Dipole) Cool Down
Pressure Piping Analysis
Mathew C. Wright January 26, 2009
High Magnetic Field Lab, CAS
ILC Experimental Hall Cryogenics An Overview
ESR 2 Presented to Joint Hall A/C Summer Meeting
Cryogenic System Commissioning Summary Report
Cryogenics – The Basics
Scope, Requirements Deliverables & Schedule
Cryogenics – The Basics
SNS Cryoplant Commissioning Past Experiences
CTF Users’ Perspective
Cryogenics – The Basics
ESR2 Cryoplant Utilities
Thermohydraulic behaviour of the cryogenic system
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
Cryogenic upgrade of B165 CRG Status Meeting 16th may 2019
ESR2 Process Cycle Design
Presentation transcript:

ESR2 Process Cycle Design ESR2 Preliminary Design Review June 19, 2019

Presentation Outline BACKGROUND EXISTING EQUIPMENT AND CAPACITY MODIFIED CAPACITY PROCESS CYCLES CONSIDERED FINAL DESIGN CYCLE SUMMARY

Background ESR1 Complex: 3 x Warm Compressors 1.5 kW Cold Box Valve Box - Experimental Hall Distribution Cans - CHL ESR TL Bayonet(s) - GHe Supply from CHL - Existing LHe Dewar Proposed ESR2 Complex: 4 x Warm Compressors 4.0 kW Cold Box CBX Distribution Recovery System GHe Storage Tank(s) LN Storage LHe Dewar CHL ESR TL ESR2 ESR1

ASST-A Cryogenic System History: Originally procured in 1992 by SSCL Magnet Testing Lab for Magnet String Test Preliminary concept of Floating pressure process (Ganni Cycle) Developed and successfully used for the variable capacity operation to recover after the magnet string quench test Never been used after SSCL cancellation Majority of the components already present at JLab

Existing Equipment and Capacity Features Compressor System (Sullair) 2 x 186 kW (250 hp) 1st stage 2 x 522 kW (700 hp) 2nd stage Four turbo-expanders Eleven heat exchangers Grouped into six brazed aluminium cores Two 80 K beds, One 20 K bed LN Consumption: 125 gph (Design, Max. Liquefaction) 70 gph (Design, ½ Capacity R+L) 4.0 kW 4.5 K cold box Capacity (tested) 4.5 K Refrigeration: 2.0 kW AND 4.5 K Liquefaction: 20 g/s OR 4.5 K Refrigeration: 4.0 kW 4.5 K Liquefaction: 37 g/s (Design)

ESR2 Future Loads 12 GeV Loads: Expected 12 GeV Era Cryogenic Loads (Cumulative) Fall 2017 – Present (Up to FY 2019)1 4.5 K Refrigeration: 0.8 kW 4.5 K Liquefaction (Lead Cooling): 7.54 g/s (0.75 kW Equivalent 4.5 K Refrigeration) 15 K Target: 1.0 kW (0.35 kW Equivalent 4.5 K Refrigeration) Total: 1.90 kW @ 4.5 K _____________________________________________________________________________________ Expected (?) Loads (2020)1 4.5 K Refrigeration: 0.80 kW 15 K Target: 2.0 kW (0.70 kW Equivalent 4.5 K Refrigeration) Total: 2.25 kW @ 4.5 K Expected MOELLER Load (2023-2026)1 4.5 K Refrigeration: 0.48 kW 4.5 K Liquefaction (Lead Cooling): 4.94 g/s (0.50 kW Equivalent 4.5 K Refrigeration) 15 K Target: 6.00 kW (2.0 kW Equivalent 4.5 K Refrigeration) Total: 3.0 kW @ 4.5 K 1Per ESR 2 Distribution System and Support for Moeller Experiment (D. Kashy, Dated 12 September, 2018)

Process Cycles Considered 15K Target load broken down into 5kW for MOELLER and 1kW for other experiments Turbine and HX parameters from previous testing of cold box Developed process model for seven supply points for the 15K load and 4 return points

Process Cycles Considered Initial modeling showed that return to point (2) required higher CHL support flow due to return conditions being warmer than injection point Return conditions set to point (1) on either LP or MP

Comparison of Various Target Supply and Return Conditions   "35K" LP "35K" MP MOELLER Supply Hall C supply CHL support flow (g/s) Cost for 2 years Available DP MOELLER (Atm) Available DP Hall C (Atm) T2 outlet w/ new moller transferline T2 outlet $1,170,000 1.52 15K HP $1,190,000 14.9 $1,160,000 13.5 T3 inlet HP $1,250,000 1.5 $1,230,000 2 $1,750,000 $1,570,000 13.2 $1,770,000 $1,590,000 T4 inlet HP $1,780,000 $1,620,000 5 $2,140,000 $1,920,000 4 $2,060,000 $1,930,000 $2,070,000 $1,950,000 T3 outlet , 4 Atm 3 2.9 $1,810,000 1.1 $1,960,000 CHL 8 $2,400,000 1.9 $2,310,000 1.43 T3 outlet , 5 Atm 8.5 $2,460,000 3.9 9 $2,430,000 2.43 $2,380,000 $2,280,000 1.4 T4 outlet 12 $2,780,000 1.33 4K direct from ESR 14.5 Discuss how lower temperature levels require more CHL support flow and are more costly. Taking HP flow requires more support flow than flow after turbine Supply Point Temperature (K) Pressure (atm) MOELLER flow (g/s) T2 outlet (green) 13 2.5-3.5 127 15K HP (blue) 14 16 122 T3 inlet HP (red) 12 84 T3 outlet , 4 Atm 8 4-5 71 T4 inlet HP (orange) 60 T4 outlet 6 53 4K direct from ESR 4.5 4 47

Final Design Cycle MOELLER supplied from T3 inlet HP (red), other halls supplied from 15K HP (blue) All return goes to (1) MP dP of ~13 atm for the halls and MOELLER -No modifications to transfer line required Only 1 first stage compressor required ~5 g/s CHL support flow

T-S Diagram of Design Cycle

Summary Design of the upcoming ESR2 plant based off of existing cold box and compressors and upcoming loads from MOELLER experiment Modelled ESR2 cold box to find the best way of supplying target flow for MOELLER and halls After discussions with Physics, chose how to supply target flow without modifying existing Hall transfer lines Will use the values for this mode in sizing other piping for the plant Other presentations will discuss what modifications need to be made to run in this configuration

Questions?