LHC - Week 38 Technical stop: Katy Foraz

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

LHC progress Saturday 2 nd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Wednesday
1st LHC MD Period Started
Wednesday 3rd October - morning
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Summary of week 40 Machine Coordinators: G. Arduini, M. Lamont
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
The LHC - Status Is COLD Is almost fully commissioned
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Tuesday Fill lost #1855 at 7:28 due to the trip of RQX.R1. This was traced to a software bug in the FGC… The Class 51 (LHC_PC) FGC software has been upgraded.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
LHC summary week 32 Coordination: Mike Lamont & Jan Uythoven
Monday 11/07: Recovery Plenty of accesses.
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
LHC Morning Meeting - G. Arduini
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
LHC Morning Meeting - G. Arduini
Monday 6th August & night
Summary of Week 11: 14 – 21 March
Summary of Week 13 G. Arduini, B. Holzer
Summary of Week 16 G. Arduini, J. Wenninger
Lost at 12:05 to power converter (RTQX2.R1) problem
LHC Morning Meeting - G. Arduini
Saturday 2/4/ :00-09:00 Problems with SPS:
Week 35 – Technical Stop and Restart
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Tuesday Loss maps in the night:
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Wire almost entirely through beam before BLM triggers dump
LHC Morning Meeting - G. Arduini
Finally.... We had to wait a long time.... We had many problems....
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Wednesday 03/11 – The Plan Finish electron-cloud program:
LHC Morning Meeting - G. Arduini
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
Monday 24 October hours of 25ns MD
Monday 14:00 beam dump Access:
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Thursday 26th July 13:21 Fill 2880 beam dumped
Programme for Friday 9 July
07/08/2010 Fill #1264 dump at 02:14:38.
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
LHC Morning Meeting - G. Arduini
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Wednesday 23/2 Thanks CRYO!!!.
Thursday - setup 10:00 Starting pre-cycle. 11:30 Injection.
Another Immortal Fill….
Monday 27th August & night
Tuesday
HI2011 Commissioning Status
Presentation transcript:

LHC - Week 38 Technical stop: Katy Foraz Coordination: Gianluigi Arduini, Mike Lamont

Volker Mertens & Mike Barnes Technical stop TS3 06:00 Monday – 18:00 Friday: technical stop MKI replacement The work on and around the exchanged MKI8D completed and the equipment got handed back to the CCC several hours in advance of the ambitious planning. … excellent preparation and the extraordinary efforts over the past days (and nights) by all teams involved (ABT, vacuum, BI, survey, RP, transport …) which made this operation possible. look forward now to confirming the expected results in the coming weeks, which will lay the base for a comprehensive upgrade of the injection kickers in LS1. Replacement of synchrotron light telescope mirror assemblies Extensive powering tests (power converters, energy extraction… Volker Mertens & Mike Barnes 24-09-12 LHC status

Friday 21st September 11:24 electrical cut at Pt 2 (before the re-start of the compensator) Loss of cooling water, caused loss of cryogenics at point 2 including cold compressor 12:00 Compensator in point 2 restarted 14:00 MKI 8 ready for operation. 16:00 trip of cryogenics in point 8: 24 V power supply causing a stop of 1.8 K cold box… 17:00 SIG informed that the intervention on the electrical network is postponed to next week 24-09-12 LHC status

Friday 21st September 18:20 Machine patrolled. Pressures in the BSRTs in the 10-9 to 10-8 mbar range. RF available. 18:00 – 20:30 Beams to last TED for Q20 optics extraction verification successful 20:20 LHC closed after intervention on 60 A power converter 23:00 Problems with cryogenics heater controls of the in point 8… 24-09-12 LHC status

Cryogenics sectors 78 & 81 24-09-12 LHC status

Monday 24th September 01:30: powering tests (RB.A78/RB/A81) complete 02:45 start pre-cycle 04:20 The right jaw of TCLIB.6R2.B1 is not moving to the position defined by the reference (inside the dump limits), but it is stopping earlier… Solenoids are off for the mki8 kickers - cannot switch them on. 05:40 Beam in – probes & then INDIVs BBQ & feedback verification BSRT checks 08:00 Preparing for ramp with pilots 24-09-12 LHC status

Plan – order to be (re)-established Go through the whole cycle (with new collision process) with pilot beam for validation and chromaticity measurement (~5 hours) BBQ and BSRT verification in parallel. Switch off Active filters of main circuits and warm dipoles one by one for mains line perturbation observations Loss maps in collision (betatron and +500 Hz) (5 hours). Wire scans for BSRT calibration Loss maps squeezed/separated: betatron and asynch.dump in collision. (5 hours) Setting-up of injection with Q20 optics (5 hours) Damper setting-up with larger bandwidth (3-4 hours) 24-09-12 LHC status

Intensity ramp-up Short fill with 78 bunches with new collision process 1 hour stable beams 456 bunches (50ns_456b_447_0_432_72bpi12inj) CMS request for period at low pile-up (~1) – 2 h ATLAS request for VdM scan – 2 h Dump - Tobias special 840 bunches with additional train of 6 bunches (no collision and no long-range). Standard fill length. 50ns_840b_801_0_804_108bpi13inj 1374 bunches 24-09-12 LHC status

Miscellaneous To be followed-up: Kicker (Pt.8) vacuum BSRT temperatures E-cloud solenoids – MKI8 Collimator TCLI.B6R4.B1 offset on the LVDT for the left jaw, G.Spieza has to contact S.Redaelli to be authorized to disable the interlock on this jaw. Abort gap calibration will be done during one of the ramp with nominal bunches 24-09-12 LHC status

Q20 The issue of wrong trajectory out of the SPS with Q20 optics two weeks ago is fully understood. It was a combination of trimming parameters at the wrong level in the hierarchy and changes to the extraction bumps based on bad pickup readings. Now both beams are at the end of the lines with pilots and indivs, well corrected to the Q26 reference. All that is remaining is injection into the LHC with Q20 pilot. Correction onto the LHC orbit. Update the FEI interlocks with the pilot settings when everything is good. Inject again pilot with all interlock masks removed. Check whether everything is still fine. Copy the final steering from the pilot onto LHC2 (the high intensity cycle), inject indiv without masks. Could need some fine tuning of steering. Put 50 ns on the cycle and inject… Verena Kain 24-09-12 LHC status

Gated BBQ on B1 - first observations. 1. Pilots are seen only at injection, then the signal disappears. This is a consequence of the fact, that the gated system uses a hybrid before the diode detectors. In addition, the pick-up signals have to be attenuated before the hybrid. In the current configuration there is 10 dB attenuators for H and 20 for V. This is why H plane is more sensitive. 2. For the pilots the signals improve with the orbit offsets, quite proportionally. With a 4 mm orbit bump H signal was about 10 dB, with 8 mm - some 20 dB in H. In V the signal was not popping up even for 8 mm bump. 3. With one nominal bunch there is some 20 dB signal in H, no signal in V. 4. For one nominal bunch orbit bumps improve also the signals. With 4 mm bump in V the signal went up to some 20 dB (from zero with the centred beam). The system was not saturating with one bunch of 1.8e11 meaning that the V 20 dB attenuators can be replaced by 10 dB ones, as it is now in the H plane (during next possible access to RR47). 5. The tune feedback was switched to the second FFT1 system. It MUST be kept running with 1024 turns at 12.5 Hz for the tune feedback. 6. The gated system on B1 should be measured with more nominal bunches. Ralph & Marek 24-09-12 LHC status