Use clamps instead of bands to secure ESP cable on the tubing

Slides:



Advertisements
Similar presentations
Always use 3 points of contact when using ladders
Advertisements

PDO Second Alert Date: Incident : LTI What happened?
PDO Second Alert Valves open Valve closed Valves open Valve open
Never place yourself in line of fire
Use right tools for the job and use them correctly
Do not work at height without fall protection
PDO Second Alert Date: Incident type: LTI What happened?
Ensure a working platform is adjusted and used
Follow Management of Change for an activity which is not in permit
Keep away form ‘line of fire’
Always use the correct tools for the job
Always use the right equipment for the task !!!!
No hands on elevator while delivering pipe
Never put your Hands in line of fire
Ensure cat line are under tension before removing elevator bolts
PDO Second Alert Date: Incident title: LTI What happened?
Always ensure straight lifting
Unsecured pup joint falling
PDO Second Alert Date: Incident: LTI What happened?
Always use secondary retention
Keep your hands in a safe position
PDO Second Alert Date: Incident title: HiPo What happened?
Always use your hands to set the slips
Ensure that all Rig moves are carried out by competent personnel
PDO Second Alert What happened? Your learning from this incident..
Your health is your responsibility
Check equipment prior to start the job
Always be vigilant while moving across well site location
Confidential - Not to be shared outside of PDO/PDO contractors
Always follow defensive driving techniques
Always intervene an unsafe act
Always get authorization before starting any job!
Always keep your equipment maintained
Confidential - Not to be shared outside of PDO/PDO contractors
Effective communication prevents incidents
Confidential - Not to be shared outside of PDO/PDO contractors
Always isolate equipment before beginning maintenance tasks
Check Level Setup prior Lifting & Lowering Operation
Always use fit for purpose lifting accessories
Keep clear of any rope under tension
Stay away from line of fire
Always use a banksman with reversing
PDO Second Alert What happened? Your learning from this incident..
Use a tool and protect your hands
Always ensure MOC is used when making changes to equipment setup
Always ensure protective guards are in place
Do not drive underneath overhead lines without permission.
Keep away from “Line of Fire”
Always verify isolation before starting any electrical job!
Confidential - Not to be shared outside of PDO/PDO contractors
Your safety should always be built on SOLID ground
Always be alert and operate drilling hoisting equipment at safe speed.
Maintain communication between peers
Drive as per the road condition
Do Not Start Any journey without proper driving training.
Confidential - Not to be shared outside of PDO/PDO contractors
Always check your surroundings while working in the yard.
Driving rules are for saving lives – adhere to it always
Always follow NORM protocol!
If you feel tired, STOP and take rest
Carillion Alawi LLC, Incident Type LTI No, 16/12/18
Always assess your position and be away from “Line Of Fire”
Confidential - Not to be shared outside of PDO/PDO contractors
Keep away from the line of fire
Confidential - Not to be shared outside of PDO/PDO contractors
Only overtake when safe to do so
Confidential - Not to be shared outside of PDO/PDO contractors
Beware of raised edges of walk ways.
Slow down and always drive to the conditions of the road.
Use hands-off where possible
Presentation transcript:

Use clamps instead of bands to secure ESP cable on the tubing PDO Second Alert Date: LTI # 26, ESP Cable Slip – Arm Fracture What happened? While checking the cable reading after N/D BOP it was found to be negative. Decided to POOH the tubing hanger. While POOH, found that the cable was partially disconnected from the PFT lower connector. The cable reading was checked again after removing the PFT and it was found positive. So decided to lay down one joint and cut the cable to reconnect PFT connecter and land HGR. POOH and lay down HGR+1 joint . Started POOH the second joint and while removing the second band from the cable, it slipped very quickly into the well and during the process the cable wagged and it hit the derrickman on his left arm causing fracture. Your learning from this incident.. Always suspect tension on the cable if it is found disconnected from the PFT connector. Always ensure that only competent personnel does the banding on the ESP cable. Use clamps instead on bands Ensure all dates and titles are input A short description should be provided without mentioning names of contractors or individuals. You should include, what happened, to who (by job title) and what injuries this resulted in. Nothing more! Four to five bullet points highlighting the main findings from the investigation. Remember the target audience is the front line staff so this should be written in simple terms in a way that everyone can understand. The strap line should be the main point you want to get across The images should be self explanatory, what went wrong (if you create a reconstruction please ensure you do not put people at risk) and below how it should be done. Use clamps instead of bands to secure ESP cable on the tubing Confidential - Not to be shared outside of PDO/PDO contractors

Confidential - Not to be shared outside of PDO/PDO contractors Management self audit Date: 25.10.2018 Incident title – ESP cable slip, Arm fracture As a learning from this incident and ensure continual improvement all contract managers must review their HSE HEMP against the questions asked below Confirm the following: Do you ensure your employee check that ESP is not under tension during POOH Do you ensure competent employee carry out banding of ESP cable Do you ensure roles and responsibilities are clearly defined and understood among the Hoist crew and the ESP crew. Do you ensure a formal handover between the ESP crew leads. Due you ensure the availability and application of the MoC procedure during ESP installation. * If the answer is NO to any of the above questions please ensure you take action to correct this finding. Ensure all dates and titles are input Make a list of closed questions (only ‘yes’ or ‘no’ as an answer) to ask others if they have the same issues based on the management or HSE-MS failings or shortfalls identified in the investigation. Imagine you have to audit other companies to see if they could have the same issues. These questions should start with: Do you ensure…………………? Confidential - Not to be shared outside of PDO/PDO contractors