ABA CLEAN ENERGY CARBON PROJECT Bruce Johnston

Slides:



Advertisements
Similar presentations
INVESTMENTS IN POWER SECTOR
Advertisements

Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference.
The Role of ESCO in Wholesale Trade of Electricity (Capacity) ( REVIEW OF WHOLESALE TRADE OF ELECTRICITY) KUTAISI September,
Clean Energy Project Analysis Course Greenhouse Gas Emission Analysis with RETScreen ® Software © Minister of Natural Resources Canada 2001 – Photo.
AN OVERVIEW OF REGULATION FOR EMBEDDED GENERATION. LAGOS – JULY, 2014.
The Sustainable Carbon Credit Originator We are an international company that originates high quality carbon credits by initiating, developing or.
EVOLVE INDIA SOLAR SOLAR FINANCE SOLAR B. O. O
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
Previous Efforts in the Electricity Sector to Improve Energy Efficiency On Supply Side  Maximum use of natural gas.  Increase of generation efficiency.
Making the Right Wind Power Investment University of Toronto Wind Workshop October 12th, 2005 Mike Crawley, President/CEO AIM PowerGen Corporation.
Energy Efficiency and Arizona’s Energy Future Jeff Schlegel Southwest Energy Efficiency Project (SWEEP) April
Marketing of MicroCHP MicroCHeaP meeting Copenhagen 29 September 2005.
THE DEVELOPMENT OF THE BRONKHORSTSPRUIT BIOGAS PROJECT
Houghton College/NextEra Solar Array. Solar Array Details 2.5 MW system covering 11 acres 2.92 million kWh production (equivalent to powering 270 homes.
Energy Project Development A Discussion on State and Federal Incentives Presented By Dennis Plaster, General Manager.
BUSINESS OPPORUNITIES IN SAUDI POWER SECTOR US-Saudi BUSINESS OPPORTUNITIES FORUM CHICAGO April 28-29, 2010 Ali Albarrak President &C E O Saudi Electricity.
Practical Ways For Towns to Save Money With Clean Energy Projects Paul Michaud Murtha Cullina LLP April 30, 2014.
Capacity Development for Clean Development Mechanism Project Idea Note (PIN) Preparation by Kofi Asante.
You currently have no control over ever rising electricity prices Electricity costs have doubled over the last 10 years* What will your electricity bill.
Distributed Generation Programs, Incentives and Interconnections Ian Loughran, P.Eng. DSM Program Leader Renewable Energy Programs
INSTALLATION OF CAPACITOR BANKS IN COMMERCIAL/INDUSTRY BUILDINGS African Regional NAMA Workshop Kigali, Rwanda, 2015 By: Kennedy Amankwa, Energy Commission,
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
Carbon Finance in Practice Public Heating Biomass Systems in Moldovan Rural Communities Project Anatol Gobjila, World Bank February 28, 2007, Tirana, Albania.
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
INITIATIVES IMPLEMENTED ON NATIONAL AND INTERNATIONAL LEVELS FOR ENERGY EFFICIENCY AND ENERGY- SAVING IMPROVEMENT VI Eurasian Energy Forum 4-6 October.
Electricity Reforms in Bangladesh
9/18/ Legal Issues With Railway Public Private Partnerships In Nigeria CWC NIGERIA INFRASTRUCTURE CONFERENCE ABUJA, November 18, 2009 Ayuli Jemide,
Electricity Generating Authority of Thailand (EGAT) 1 STRUCTURE, STATUS AND CROSS BORDER POWER INTERCONNECTION 0F THAILAND b y Mr. Prutichai Chonglertvanichkul.
Kenneth Langer, Ph.D. Global Environmental Investment Group Washington, D.C Insurance Mechanism To Facilitate Financing of Energy Efficiency Projects.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Beyond Mandates, Does Green Pave the Way? Marlene Santos Vice President, Customer Service Florida Power & Light Company October 17, 2009.
The Broward County Green Workforce Innovation Project White Paper April 2010.
The Role of Renewable Energy in Addressing Climate Change Australian Government Support for Renewable Energy Denis Smedley Director Renewable Energy Technologies.
Privatization and Liberalization of the Electric Power Industry in Taiwan Energy Commission Ministry of Economic Affairs October 5, 2001.
Net Metering and Embedded Generation NB Climate Action Change Hub Advisory Committee Meeting – October 1, 2008 Saint John, NB Linda Berthelot.
February 28, 2015 Generating Electricity from Sustainably Harvested Biomass Material NYS Science Teachers and Master Teachers.
The policy and plan on CDM Forum MDP Maroc Marrakech, April Italian Ministry for the Environment and Territory Department for Global Environment,
ENERGY AGENCY LITHUANIA Perspective for the EU Structural Assistance to the Energy Projects in Lithuania for the period Marijus Franckevičius.
Cooperative Opportunity for Wind Development. State of Union speech  “it’s possible we could generate up to 20 percent of our electricity needs through.
Technical Advisory Group Tuesday 6 October 2009 Tony Pearson Network Planning Manager.
El Gallo Hydroelectricity Project PDD Analysis
Vogtle Nuclear Plant Update Moderator: Honorable Greg White, Michigan Panelists: Honorable Lauren “Bubba” McDonald, Georgia Public Service Commission Buzz.
Things to Know About the World Bank Carbon Finance (CF) 10
Michael O’Doherty Assistant Director of Housing, MCC Retrofitting for the future..
Energising your Budgets Bruce Pittingale Carbon Special Reserve
New Government Policy on Energy Efficiency By Subodh Kumar Scientist Central Road Research Institute New Delhi ,
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
Legal, Regulatory and Financial Incentive Framework to Support Landfill Gas Power Generation Project Development Presented by Leiping Wang Senior Energy.
PacifiCorp and CAISO Expanding Regional Energy Partnerships
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
“Access to electricity is … the connection that’s needed to plug Africa into the grid of the global economy. In partnership with African nations [and the.
AFRICAN DEVELOPMENT BANK KENYA- SPAIN Multilateral Partnership Meeting Nairobi, 9 December 2013.
Session 22 (R) Utility Scale Solar Development Power Purchase Agreements (PPAs) April 04, 2016.
Wind Prospect Experience and Practicalities of Wind Energy International Cooperation Forum for Energy Service Companies (ESCO’s) - Opportunities in China.
Berkshire Wind: Joint Action By Communities with Common Goals Presented by: David Tuohey, Director of Communications & External Affairs Massachusetts Municipal.
RENEWABLE ENERGY REGULATION IN KENYA KENYA-SPAIN MULTILATERAL PARTNERSHIP MEETING HELD AT CROWNE PLAZA Presented by Caroline Kimathi Asst Manager, Licensing.
Cogeneration at UC March 09, Welcome Central Utility Plant.
Planning and Realisation of Wind Farms
ENERGY: STATE - OF - PLAY IN GHANA
Luthin Associates Overview
Damitha Kumarasinghe Director General
GEORGIAN ELECTRICITY MARKET OPERATOR
Presentation to the Enron Corp. Finance Committee
THE REPUBLIC OF MALAWI MALAWI PRESENTATION AT
City Council April 30, 2018 Item 13
Integrated Bilateral Agreement (IBA) 2018 to 2028
About Dominion: One of America’s Leading Energy Companies
Funder Preferred Risk Allocation
Providing much more than affordable electricity
Presentation transcript:

ABA CLEAN ENERGY CARBON PROJECT Bruce Johnston FIRST IPP IN NIGERIA ABA CLEAN ENERGY CARBON PROJECT Bruce Johnston

Aba

Genesis of Aba IPP December 2000 – Geometric Power Limited (GPL) (sponsor and developer of Aba IPP Project) launches the Abuja 22MW Emergency Power Plant March 2004 – President Obasanjo approves GPL’s Aba IPP as first privately financed project May 2004 – Minister of Power and Steel, MD/CEO of NEPA and GPL sign an MOU to build the Aba IPP according to the President’s directive April 2005 – Minister of Power and Steel, MD/CEO of NEPA and APL sign an agreement for the lease of NEPA assets in Aba by APL for 15 years August 2005 – President allocates supply of gas for the Aba IPP in the National Gas Master Plan

Project Background Current situation – Industries and other consumers presently depend on expensive diesel generation for a substantial part of their production because of inadequacy of the power supply from the national grid Aba IPP Project – Will supply reliable power to industries, commercial businesses and residential homes in Aba through construction and operation of 140 MW gas fired power plant Downstream – Construction of own industry-centred distribution lines: several industries poised to expand production capacity if reliable low-cost power supply is assured Other Customers – Commercial and residential consumers to receive power through distribution lines in “ring-fenced” network leased from PHCN

Project Description Structure Island model disconnected from the national grid and serving industrial and residential customers Power Station Installed capacity of approximately 140 MW comprising 3 gas fired open cycle turbines with opportunity for expansion EPC Contractor to construct, install and commission power plant on turnkey basis Subsequent procurement of O&M Contract Distribution Lines 33 KV distribution lines to be constructed from power station to supply reliable power to GPAL Customers through seven distribution substations

Project Description (Cont.) Substations 33 KV Power Station substation with eight outgoing 33 KV Feeders to be constructed for evacuation of power generated at the Power Station New Distribution Substations Four distribution substations to be constructed within the city of Aba and equipped each with 2x15 MVA 33/11 KV transformers to supply power to GPAL customers Osisioma Ogbor Hill Factory Road Port Harcourt Road

Project Description (Cont.) Leased Distribution Substations Three distribution substations (each equipped with 2x15 MVA 33/11 KV transformers) leased from NEPA to supply power to residential and commercial customers through APL NEPA Aba Control Substation NEPA Power Station Substation NEPA Umuode Substation

The Clean Energy Project Nigeria's first Clean Energy Carbon Project to benefit from the Clean Development Mechanism ("CDM") established under the Kyoto Protocol. Project has qualified for $9 million carbon grant from the Community Development Carbon Fund (CDCF) (set up by the World Bank).

Carbon Finance General term applied to financing under which a Fund/entity seeks to purchase greenhouse gas emission reductions ("carbon" for short) to offset emissions in the OECD. Under Carbon Finance arrangements (or ERPA) a clean development project in a developing country can "sell" carbon credits, obtained by replacing more polluting projects, to buyers in industrialised countries seeking to meet their Kyoto obligations to reduce emissions in those countries.

Community Development Carbon Fund A public-private partnership of governments and 16 companies and organisations managed by the World Bank. Designed to provide communities in developing countries, and in particular least developed countries, with an opportunity to benefit from new investments in renewable energy and clean technologies that aim to reduce greenhouse emissions and mitigate effects of climate change, while improving the welfare of the communities involved. Community development benefits of ABA Project include access to electricity, construction of a school, health centre and a road for the surrounding communities of Aba Plant.

ABA IPP Investment Structure CDCF Carbon Funding

ABA IPP Power Delivery Model Gas Supplier Gas Transporter

Allocation of Power Plant Capacity Unregulated Customers At least 60% to industries directly via new GPAL owned distribution lines and substations Regulated Customers Up to 40% to residential and commercial customers via APL leased PHCN distribution lines and substations

Power Purchase Agreements Unregulated Supply Each industry off-taker will sign PPA with GPAL Each industry off-taker will provide payment security in the form of revolving bank guarantee Industry off-takers will pre-pay for one month supply Tariffs Regulated Supply Each customer will sign a Standard Connection Agreement (with APL) Customers will use pre-pay meters

Gas Supply Requirement Plant requires ~43 mmscf/day Supply Primary fuel is natural gas supplied through a pipeline from Imo River and the gas gathering field in Owaza and Obigbo GPAL will sign a GSA with Gas Supplier Transportation To be transported through a new pipeline constructed by separately procured gas transporter GPAL will sign a Gas Transportation Agreement with Gas Transporter

ABA CLEAN ENERGY CARBON PROJECT Bruce Johnston FIRST IPP IN NIGERIA ABA CLEAN ENERGY CARBON PROJECT Bruce Johnston