EASEE-gas 24/09/2003 EASEE-gas Madrid Forum 24/25 September 2003 Henri Cattoor Wim Groenendijk.

Slides:



Advertisements
Similar presentations
DNV No. 1 © 2000 Det Norske Veritas D ET N ORSKE V ERITAS THEMES Plans and expected contribution WP VII - Network Management.
Advertisements

1 Accessibility Forum Projects Bill Hetzner Jim Kindrick.
Garrett L. Stauffer, CPA Partner PricewaterhouseCoopers LLP.
13 September 2012 SDMX Technical Working Group1 Report of the SDMX Technical Standards Working Group SDMX Expert Group Meeting, Paris, September 2012.
OECD International Futures Programme 1 OECD Futures Project The Commercialisation of Space and the Development of Space Infrastructure: The Role of Public.
U.S. Department of the Interior U.S. Geological Survey Beyond the Archive Task Team Discussion at WGISS #25 February, 2008 Lyndon R. Oleson U.S. Geological.
Documents for GEO & EO Summit II 1.Statement/Communiqué to be agreed by EO Summit II 2.Framework Document to be agreed by EO Summit II 3.GEO Report to.
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
1 GEO Implementation Plan Task Team (IPTT) GEOSS 10-Year Implementation Plan Reference Document.
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
SEM11-06 Committee procedures ETSI Seminar © ETSI All rights reserved.
Ad Hoc Bulk Electric System Task Force Update RPIC February 19, 2009.
NPA WG : Single and multiple releases
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
European Commission Jacques McMillan Enterprise Directorate-General Legal aspects linked to internal market EUROPEAN CONFERENCE ON MARKET SURVEILLANCE.
European Commission: Environment Directorate General Slide: 1 ECCP Aviation Working Group Mandate and draft work programme Directorate C – Air and Chemicals.
Zagreb, 28 September 2004 The South East Europe gas market: a preliminary analysis of facts and opportunities from the Regulators perspective GAS TASK.
ESafety Work Programme WORK PROGAMME 2004 The eSafety Steering Group, Brussels, 10 February 2004 The eSafety Steering Group, Brussels, 10 February.
UNFCCC secretariat, programme Fleur Newman, Programme Officer Breakout session 4.2 Procedure on significant deficiencies CMP & EB Mandates and 2012 Process.
1 Glenn Research Center ICAO ACP Working Group M Iridium Sub Group Overview Bob Kerczewski Mike Meza NASA Glenn Research Center Iridium AGC-FG and NexSAT-SG.
CRI- Common Review Initiative Improving Accountability in the FFEL Program Through Cooperation August 27, 2003.
HISPC-Illinois II The Public-Private Partnership Moves Forward on Privacy and Security.
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
PROPOSAL FOR SETTING-UP THE IBERIAN GAS MARKET (MIBGAS) Harmonization of trading licenses in the Iberian area Terms of reference 10 July 2008.
ECODESIGN DIRECTIVE Lots1 & 2 Heaters/Water-heaters
SAS 70 Third Party Report on Controls Overview and Timetable Finance / Audit Committee Meeting Austin, Texas January 14, 2003/ February 18, 2003.
EASEE-gas 20/10/2003 EASEE-gas Peter Taff (centrica) GTE Conference 22/23 October 2003.
PRESENTATION TO THE JOINT RULES COMMITTEE 15 MARCH 2012 ON THE PROGRESS ON IMPLEMENTATION OF THE INDEPENDENT ASSESSMENT PANEL ADOPTED RECOMMENDATIONS ADOPTED.
Code Governance Review: WWU views on potential changes to UNC and the Modification Panel Simon Trivella – 30 th March 2010 Governance Workstream.
CBP BMP Verification Program Development: Requests for Decisions on Panel Membership and Revised Schedule CBP Partnership Management Board September 13,
Commission’s draft staff working document on Art. 22 ERGEG’s view ERGEG’s Gas Focus Group (GFG) XV Madrid Forum, 6/7 November 2008.
Third Energy Package for Change of Supplier 2009/73/EC.
W Helmreich – Presentation to Sub-contractors; Brussels, 13/10/2005 WP 2: Monitoring, Analysis and Information Preparation Sub-contractor Meeting – 13.
Vienna, 8 April th IG Meeting Meeting Guide.
Table of contents 1 Manual of Operational Procedures (MOP) 2
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
Welcome to the Eighth e-IRG meeting Espoo, Finland Leif Laaksonen (e-IRG Chairman) CSC, the Finnish IT center for science
EU Developments Transmission Workgroup 6th October 2011.
Non Road Mobile Machinery Engines Global Technical Regulation for Approval by GRPE Draft NRMM gtr 2009/16 Final Report 2009/17 Informal document No. GRPE
1 Private Company Financial Reporting Brief History of Efforts in U.S.
Gas Quality Measurement Peter Schley marcogaz, Paris 13 September 2007.
NordREG Nordic harmonized electricity market by 2015? Work done and what to do beyond 2014.
Message Codification & Maintenance Message & Workflow Design WG: = Member countries.
1 PROPOSAL FOR PROCEDURES AND SCOPE OF SHA DATA COLLECTION UNDER THE CO-OPERATION BETWEEN OECD, EUROSTAT AND WHO 7 th Meeting of Health Accounts Experts.
Planning and submitting a shadow report Charlotte Gage Women’s Resource Centre.
Budget Setting Process For 2015 Budget Draft 0.1 Member Forum Date of Meeting: 27th May 2014.
Bjørn W Melaa Excom Vice Chairman The Gas Regional Initiatives and the CBP "working towards a standardised European gas network"
Implementation Strategy July 2002 STANDARDS DEVELOPMENT LIFECYCLE PROCESS ORP Publishes & Maintains 8 Standing Committee Recommends Approval / Disapproval.
Legal Status Data Legal status project and relating developments in CWS Patentscope Users Forum June 18, 2013 Angel López Solanas.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
The Data Sharing Working Group 24 th meeting of the GEO Executive Committee Geneva, Switzerland March 2012 Report of the Data Sharing Working Group.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
GEOSS Common Infrastructure Initial Operating Capability Directions and Discussion Presented to GEO ADC Geneva May
23 September 2004GTE Annual Conference1 Review of the Madrid Forum VIII July 2004 Geert E.H. Joosten GTE President GTE Annual Conference September.
DIRECTIVE 2000/60/EC 2 nd MEETING CHEMICAL MONITORING ACTIVITY (CMA) BRUSSELS, 17 th NOVEMBER 2005 Chemical Monitoring Activity Draft Outline of a Guidance.
Maribor, October 9, 2007 Implementation of EASEE-gas’ rules Or …Working towards a functioning European gas network European Association for the Streamlining.
Industry Dialogue on xoserve Services 14 th September 2007.
GTE ppt 1 Brussels, Henri Cattoor, Edigas Chairman GTE Interoperability, EASEE-gas and LNG.
1 Dublin 23/24 April CONCLUSIONS Regulatory Co-ordination Responses to Deliverables 3 and 4 due by 8 th May Papers redrafted to take comments into account.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren 20 th Madrid Forum, 26 Sept 2011.
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting.
Technical Barriers to Gas Trade and Interoperability
Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011
Webinar on the Exposure Draft of CAS Continuing Education Policy
Implementation Strategy July 2002
Study on interoperability in and gas quality in SSE
Study on interoperability in and gas quality in SSE
Study on interoperability in and gas quality in SSE
Hans Dufourmont Eurostat Unit E4 – Structural Funds
Hans Dufourmont Eurostat Unit E4 – Structural Funds
Presentation transcript:

EASEE-gas 24/09/2003 EASEE-gas Madrid Forum 24/25 September 2003 Henri Cattoor Wim Groenendijk

EASEE-gas 24/09/2003 EASEE-gas 1. State of the organisation 2. Action plan progress 3. Conclusion

EASEE-gas 24/09/2003 Executive Committee elected March 2003Executive Committee elected March full members:61 full members: 13 associate members13 associate members Producers (6) Traders & Shippers (16) Transporters (19) Suppliers (5) Service Providers (9) Distribution Network Operators (5) Retail Suppliers (0) End Users (1) State of the Organisation

EASEE-gas 24/09/2003 EASEE-gas 1. State of the organisation 2. Action plan progress 3. Conclusion

EASEE-gas 24/09/2003 General Comments General Comments CBP: Unit Harmonisation CBP: Unit Harmonisation Working Groups Working Groups - Business Rules - Business Rules - Gas Quality Action Plan Progress

EASEE-gas 24/09/2003 General Comments Executive Committee takes responsibility for Action PlanExecutive Committee takes responsibility for Action Plan First CBP (Harmonisation of Units) approvedFirst CBP (Harmonisation of Units) approved Business Rules increased focus on deliverablesBusiness Rules increased focus on deliverables Good progress on Gas Qualities HarmonisationGood progress on Gas Qualities Harmonisation

EASEE-gas 24/09/2003 Working Groups 1.Harmonisation of Units * 2.Business Rules * 3.Gas Quality Harmonisation * 4.Message Specification Message Codification and Maintenance 6.Real-time Data Exchange 7.IT Communication Network 8.eb XML

EASEE-gas 24/09/2003 CBP : Unit Harmonisation Approved by ExCom 27th August 2003Approved by ExCom 27th August 2003 Publication on web site, press releasePublication on web site, press release CBP to be implemented on or before 1/10/2005CBP to be implemented on or before 1/10/2005

EASEE-gas 24/09/2003 CBP : Unit Harmonisation Pressurebar EnergykWh, with a combustion reference temperature of 25°C Volumem³(n), at 0°C and bar (normal m³) Gross Calorific Value kWh/m³(n), with a combustion reference temperature of 25°C

EASEE-gas 24/09/2003 Working Groups Business Rules Broad participation & large interest in this Working GroupBroad participation & large interest in this Working Group No participation of end users nor public distributionNo participation of end users nor public distribution Smaller Task Force to develop detailed proposals with ambitious, but realistic, time scheduleSmaller Task Force to develop detailed proposals with ambitious, but realistic, time schedule Proposals being developed for a series of CBPs to address the progressive (and continuous) nature of the work in this areaProposals being developed for a series of CBPs to address the progressive (and continuous) nature of the work in this area Draft CBP on nomination cycle developedDraft CBP on nomination cycle developed

EASEE-gas 24/09/2003 Working Groups Gas Quality Harmonisation Well attended, good spiritWell attended, good spirit Again little or no participation of end users nor public distributionAgain little or no participation of end users nor public distribution Preliminary status report available to Madrid ForumPreliminary status report available to Madrid Forum Requires further work to develop draft CBPRequires further work to develop draft CBP Final recommendation will require approval by members and by Executive CommitteeFinal recommendation will require approval by members and by Executive Committee

EASEE-gas 24/09/2003 GQHWG Scope of Work GQHWG Scope of Work Define parameters relevant for harmonisationDefine parameters relevant for harmonisation Agree on common values and/or ranges for gas specification parametersAgree on common values and/or ranges for gas specification parameters Develop consistent approach on combustion propertiesDevelop consistent approach on combustion properties Propose billing arrangements that accommodate the agreed gas specificationsPropose billing arrangements that accommodate the agreed gas specifications Taking into account safety, costs, benefits and the image of natural gas

EASEE-gas 24/09/2003 Limited to cross border and EU entry points for high calorific gas, including LNG- terminalsLimited to cross border and EU entry points for high calorific gas, including LNG- terminals Excluding areas of production and isolated systems where production, transportation and utilisation are combinedExcluding areas of production and isolated systems where production, transportation and utilisation are combined Areas of Application

EASEE-gas 24/09/2003 Agreed< bar(a)Hydrocarbon dew point Under discussionImpurity Clause Under discussionRelative density Agreed< bar(a)Water dew point Agreed< 2.5 mol %CO 2 Under discussionO2O2 Agreed< 6 mg/m³ (n)Mercaptans (as S) Agreed< 30 mg/m³ (n)Total Sulphur Agreed< 5 mg/m³ (n)H 2 S+COS (as S) Under discussionWI Under discussionGCV Status (in GQHWG)ValuesParameter Gas quality parameters/values

EASEE-gas 24/09/2003 Conclude discussions on the set of parameters and corresponding valuesConclude discussions on the set of parameters and corresponding values Review the billing arrangements that lead to restriction in the GCV rangeReview the billing arrangements that lead to restriction in the GCV range Outline possible implicationsOutline possible implications Prepare a recommendation for a common business practicePrepare a recommendation for a common business practice Further Work

EASEE-gas 24/09/2003 EASEE-gas 1. State of the organisation 2. Action plan progress 3. Conclusion

EASEE-gas 24/09/2003 Reasonable support for EASEE-gas, but :Reasonable support for EASEE-gas, but : End User and Public Distribution involvement as good as non-existent End User and Public Distribution involvement as good as non-existent First CBP adoptedFirst CBP adopted Progress : picking up the paceProgress : picking up the pace Conclusion