Customer Visit TT2020 Standard Presentation

Slides:



Advertisements
Similar presentations
EuropeAid Introduction to the new Capacity4dev. EuropeAid What is capacity4dev? What is the utility of this tool? Capacity4dev is a tool that: can support.
Advertisements

YEKATERINBURG, 4 SEPTEMBER STATUS QUO - COOPERATION BETWEEN CCTT AND MÁV Ilona Dávid President – Director General MÁV, Hungarian State Railways.
The EU Rail Freight Corridors in the context of freight transport on the Europe-Asia landbridge Edyta Jaszczuk-Jezierska Member of the Management Board.
The Process of Including Pan-European Corridor X (Xa) in the Rail Freight Corridor Network (in Line with Regulation 913/2010/EU)
Business Processes of Harbours and Port Terminals Expert Group for Business Processes of Harbours and Port Terminals BUSINESS PROCESSES OF HARBOURS AND.
We increase the impact of marketing measures and enhance our customers’ brand value. In order to achieve this goal we combine market research and consulting.
Short summary of RFC 7 Orient-East/Med Corridor 11.
1 Malmö Shaping the Future of Core Networke Future of Core Network corridors 6 th of May 2015 Scandinavian Mediterranean Rail Freight Corridor Tommy Jonsson.
We increase the impact of marketing measures and enhance our customers’ brand value. In order to achieve this goal we combine market research and consulting.
We increase the impact of marketing measures and enhance our customers’ brand value. In order to achieve this goal we combine market research and consulting.
Interoperability and Integration of EGI with Helix Nebula - Workshop Sergio Andreozzi Strategy and Policy Manager (EGI.eu) 11/04/2013 EGI Community.
Nutrition Education Presentation to: Nutrition Services Directors Presented by: Barbara Stahnke, MEd, RD, LD Date: March 23, 2015.
1 ERFA Annual Event Brussels, Welcome. Irmtraut Tonndorf ERFA Chair.
100,000 OPPORTUNITIES INITIATIVE
A cooperation between RFC Rhine-Alpine – cooperation for improved international services and growth on rail Christiane Warnecke Managing Director May 2017.
The EU Rail Freight Corridors - Present and Future
International Timetabling Calendar 2017 – Rail Freight Corridors
Meeting Housekeeping/Highlights
fresh thinking for powerful marketing
Czech-Slovak Corridor
 BUT …. Terminal pilot REQUEST TO THE CCB
Welcome! The 2015 B-13 Data Collection webinar will begin in a few moments. Event number: Event password: 2015B13 To hear the presentation.
25/06/2018 6th ERA TAF TSI Regional Workshop (Poland, Latvia, Lithuania and Estonia) The Content of TAF TSI: RU/IM Communication and Legal Obligations.
COMBINED TRANSPORT A brief view on the UIRR scrl
Redesign of the International Timetabling Process (TTR)
S&TT structure 13 September 2017.
Strategic Planning Update
TAF/TAP workshop Brussels, September 2017.
MISSION STAFF WHAT WE DO NORTH CAMPUS: Raitt Hall, 229-D SOUTH CAMPUS:
TTR IT Implementation Capacity Offer/Request/Allocation
Non-RU Applicant (NRA), PCS UG
RFC Short Term Path Request Pilots
Content Management System
Redesign of the International Timetabling Process (TTR)
Removal of national particularities, PCS UG
Built on the Powerful Microsoft Office 365 Platform, My Intranet Boosts Efficiency with Support of Daily Tasks, Internal Communications and Collaboration.
Envelope Concept report, PCS UG
29th April 2014 Teleconference
Temporary Capacity Restrictions: TCR WG & TCR tool
Redesign of the International Timetabling Process (TTR)
International Timetabling Calendar 2018 – Rail Freight Corridors
PCS Outlook PCS User Group 12th September 2018, Vienna.
PCS Minor Release th February 2018, PCS UG.
PCS CCB Group 22nd February, 2017.
PaP Publication strategy TT2019 – Combined PaP
Redesign of the International Timetabling Process (TTR)
EEC Core Team 6th February 2018, Vienna.
Development roadmap PCS Day 2017.
IT Support for TTR Pilots
DELETE BEFORE PRESENTING
Operationalizing Export Certification and Regionalization Programmes
PCS User Group 15th February, 2017.
Retrospective report of the past year
TTR IT Landscape PCS-TTR Day Vienna, 21 November 2018.
International Timetabling Calendar 2020 – Rail Freight Corridors
PaP Product Definition
Taskforce „TT Quality“: Report from First Workshop (short)
TSI Compliant PCS Mandatory Interface
CIPC Executive Committee Report-2
The modules of the EU Labour Force Survey
Major 2018 For TT2019 Ad-Hoc Path Request For TT2020 New Path Request
CAPACITY strategy & MODEL atlantic 2020 PILOT
RFC Short Term Path Request developments
PCS Team Introduction 22 November 2017.
Customer Visit TT2020 Standard Presentation
Annex A1.6.2b RU access to OBI RNE General Assembly 16 May 2018.
Regional and Bilateral cooperation instruments
Indiana Finance Authority (IFA)
Railway timetabling tools with automatic solutions
Multi-state Freight Planning in the Mid-America Freight Coalition
Presentation transcript:

Customer Visit TT2020 Standard Presentation 12.02.2019 C-OSS Manager Stephan Noll

ScanMed Organisation Structure since 2019 Executive Board RAG/TAG Management Board Regional WGs* Corridor Team North Managing Director Emanuele Mastrodonato Communication Officer Antonia Recchia Brenner PIMs * As regards TCRs the Regional Working groups report to TCRs corridor WGs CRM Manager ..on board soon.. C-OSS Stephan Noll Accessibility Manager Johan Carlgren Co-Leads Market Analysis & Customer Prospection Capacity Mgt Interoperability Legenda Legal (SCU) Infrastructure Co-Leads Working Group Co-Leads TPM CIP Activity Task-Force Operations Temporary Cap. Restriction + ad-hoc Project Teams for target-oriented and time-limited activities (led by one of the 3 Managers) North* South*

New ScanMed Chairperson and Staff Linda Thulin Chairperson MB Hanne Bjørn Nielsen Deputy Chairperson MB Emanuele Mastrodonato Managing Director Stephan Noll C-OSS Manager Johan Carlgren Accessibility Manager N.N. CRM and Market Manager Antonia Recchia Communication Officer

Highlights Lowlights Review 2018 / TT2019 Increased sales rate on ScanMed North by 9% (0,5 Million PaP km more) Increased total capacity utilization by 8% (from 33,5% to 38,2%) PaP TCR Screening Process worked Multi-corridor dossiers Intensive customer dialogue and support in all request stages, provisional C-OSS Almost no requests on ScanMed South No requests of Terminal Pilot Slots No requests for Short and Regular Reserve Capacity

PaP screening against TCRs after publication Improvements in 2019 for TT2020 PaP screening against TCRs after publication Verona QE joined Terminal Pilot International Contingency Managment TTR Pilot Munich-Verona Improvements New Connection to Trelleborg Connection (HaP) RFC1/3 Bologna-Piacenza Connection (HaP) RFC3/8 Maschen-Osnabrück

Schematic PaP TT2020 and Capacity Offer 16.841.260 16.622.207 -1% Harmonized Path Maschen-Osnabrück RFC 3/8 8.846.951 8.894.206 New PaP to Trelleborg -3% Harmonized Path Bologna-Piacencza RFC 1/3 7.994.310 7.728.001 TT2019 TT2020 Indication of Terminal Pilot North South Coloured Indication of new features in PaP Catalogue TT2020

Participation of Terminals in TT2020 Status Terminal Pilot 2 3 3 1 Facilitator of information exchange C-OSS as common Post-Box Publication of Free Terminal Slots Publication of Coordinated Terminal Slots Port of la Spezia Italy 2 DUSS Germany 3 Bologna Italy 4 Alnabru Norway Verona Q.E. Italy Taulov Denmark + 4 4 NEW 4 Participation of Terminals in TT2020 All Terminals which participated in the Pilot in TT2019 confirmed their participation for TT2020 again New terminal participation of Verona Q.E. (coordinated Terminal Slots) C-OSS coordinates to harmonise PaP construction timeline regarding process description with Verona Q.E.

Process description for Level 4: Coordinated Terminal Slots with Verona QE No additional work for applicant, only for C-OSS and IM (except for request)

Coordinated Terminal Slots Verona QE TT2020 In order to provide customers with requested terminal services, a time-interval from 8 to 10 hours (shunting + terminal slot) to accomplish operational tasks within Verona Q.E. was basis for construction

International Contingency Managament Publication of Progress Report, Processes and Re-Routing Options on 14.01.2019 Possibility to identify vulnerable stretches and prepare for Re-Routing Scenarios (Parameters Vehicle Fleet!) 24/7 Contact Person at ScanMed RFC is the Managing Director Documents and Files are available in CIP: www.cip.rne.eu

International Contingency Managament High impact can be assumed, as a rule of thumb, if 50% of the trains on the affected section need an operational treatment. This can also be caused by a combination of several small incidents adding up to a high impact on railway operations. The GA by RNE approved the introduction of at least one English-speaking dispatcher on national traffic control center in every shift until 2020. Source: Handbook for International Contingency Management by PRIME and RNE

TTR Pilot Munich-Verona Capacity Model TT2020 was published on 14.01.2019 TTR Pilot by DB Netz, ÖBB Infra and RFI RNE Pilot, no corridor pilot

TTR Pilot Munich-Verona Ordering Tool: National Tools Involvement C-OSS: under Discussion (Art. 1(4) FCA TT2020 with Annex IV) Information: https://cms.rne.eu/ttr-communication-platform/scanmed-pilot-library

ScanMed Corridor Events ScanMed Presentation at Freight & Terminal Forum 27 March 2019 in Utrecht ScanMed Spring Customer Workshop 14 May 2019 in Frankfurt Transport Logistic Fair 04-07 June 2019 in Munich Save the dates !

Questions? C-OSS Stephan Noll M +49 152-37522997 T +49 69 265-26773 Mainzer Landstraße 201-203, 60326 Frankfurt am Main www.scanmedfreight.eu or follow us on LinkedIn!