- 1 - World Gas Model Franziska Holz Joint Work with Ruud Egging, Steve Gabriel, and Jifang Zhuang Work in Progress Presented at the 4 th PhD Seminar of.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

GAS EXCHANGES IN SPAIN 5th IG Meeting of South Gas Regional Initiative 30th November, 2007.
MARKETING CHANNELS (Place)
Objectives Know why companies use distribution channels and understand the functions that these channels perform. Learn how channel members interact and.
Business-to-Business (B2B) Marketing
Copyright © 2002 Pearson Education, Inc. Slide 1.
Advanced Techniques for Profit Maximization
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Water Economic Modeling for Policy Analysis: A CGE approach to estimate the direct and indirect economic costs of water quality improvements in the WFD.
1 AID FOR TRADE IN AFRICA: Why Trade? Why AID? MOBILIZING AID FOR TRADE: FOCUS ON AFRICA Dar es Salaam, Tanzania John Page, Chief Economist Africa Region,
1 Introduction to Transportation Systems. 2 PART I: CONTEXT, CONCEPTS AND CHARACTERIZATI ON.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
This presentation includes forward-looking statements. Actual future conditions (including economic conditions, energy demand, and energy supply) could.
1 © inditex 2008 THE IMPORTANCE OF TRADEMARK REGISTRATION IN THE EXPANSION AND INTERNATIONALIZATION OF COMPANIES.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Illinois Climate Change Advisory Group (ICCAG) Modeling Sub-group An introduction to ENERGY 2020 April 26, 2007.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
Addition Facts
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc
Simulation-based Optimization for Supply Chain Design INRIA Team April 7, 2004 Torino-Italy.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
© Prentice Hall, 2005 Business In Action 3eChapter Developing Distribution and Promotional Strategies.
Copyright © 2012 Pearson Canada Inc. CHAPTER 13 Sales Promotion 13-1.
Two-Market Inter-domain Bandwidth Contracting
1 Column Generation. 2 Outline trim loss problem different formulations column generation the trim loss problem master problem and subproblem in column.
KOOTHS | BiTS: Economic Policy and Market Regulation (winter term 2013/2014), Part 2 1 Economic Policy and Market Regulation Part 2 Dr. Stefan Kooths BiTS.
Effective Rate of Protection
Chapter 6 Tariffs. Copyright © 2007 Pearson Addison-Wesley. All rights reserved. 6-2 Topics to be Covered Types of Commercial Policies Tariffs and Types.
KOOTHS | BiTS: International Economics (winter term 2013/2014), Part 4 1 International Economics Part 4 Dr. Stefan Kooths BiTS Berlin (winter term 2013/2014)
Real Estate Market Analysis
Section 26.2 Setting Prices
Foundations of Chapter M A R K E T I N G Copyright © 2003 by Nelson, a division of Thomson Canada Limited. Managing the Pricing Function 14.
Foundations of Chapter M A R K E T I N G Copyright © 2003 by Nelson, a division of Thomson Canada Limited. Understanding Pricing 13.
What is Mike’s Bikes? Single-player version (SoloMike)
Chapter foundations of Chapter M A R K E T I N G Understanding Pricing 13.
Juni 14 1 New actors in MATSim –T: Agent based retailers F. Ciari IVT – ETH Zürich MATSim Seminar - Castasegna.
SCATTER workshop, Milan, 24 October 2003 Testing selected solutions to control urban sprawl The Brussels case city.
Capacity Planning For Products and Services
Importance of monthly statistics on Natural Gas
Gas Quality E.ON Gastransport SIMONE Congress 2008, Dubrovnik Jörg Bödeker, Dr. Dietrich Weise.
1 Considerations in Gas Contracts Using LNG Supply Texas Utility Lawyers Association October 13, 2005 Craig Enochs Jackson Walkter L.L.P.
Basics of Macroeconomics Training Course Material for e-Library on System of National Accounts March 2009 Module-I: PP1.
A Key to Economic Analysis
Chapter Two Company and Marketing Strategy
© Vattenfall AB The Swedish Power Market Presented for Invest in Sweden Agency and Sun Microsystems Stockholm 20 March, 2009 Sandra Grauers Nilsson, Vattenfall.
GRIP South South Region Second Edition Gas Regional Investment Plan SGRI – 15 November 2013.
Squares and Square Root WALK. Solve each problem REVIEW:
1 Operations Management, Competitiveness, and Operations Strategy Lecture 1.
OHT 5.1 © Marketing Insights Limited 2004 Chapter 5 E-business Strategy.
Addition 1’s to 20.
25 seconds left…...
Directie Toezicht Energie, Bonn WS 8 february Bonn 1 SG Workshop: Secondary markets for interconnection capacity: way to adress contractual congestion.
Week 1.
1. 2 No lecture on Wed February 8th Thursday 9 th Feb Friday 27 th Jan Friday 10 th Feb Thursday 14: :00 Friday 16:00 – 19:00 HS N.
We will resume in: 25 Minutes.
The Strategy of International Business Chapter 12
Operations Management: Financial Dimensions
Principles of Marketing
Relevant Costs for Decision Making
Marketing Strategy and the Marketing Plan
Copyright © 2008 Pearson Addison-Wesley. All rights reserved. Chapter 11 Market-Clearing Models of the Business Cycle.
Globalization and International Trade Lecture 8 – academic year 2014/15 Introduction to Economics Fabio Landini.
Copyright © 2004 Pearson Education Canada Inc Personal Selling Today Introduction and Overview CHAPTER.
MultiMOD – An equilibrium model for energy market & infrastructure analysis Ruud Egging 24 th Oct 2013 CREE meets CenSES.
Gas Development Master Plan Overview of the GDMP Model Capacity Building Workshop Bali, 1-2 July 2013.
The Northeast Natural Gas Market in 2030 LNG EXPRESS CONFERENCE Boston, Massachusetts September 21, 2006 William Trapmann Natural Gas Analysis Team Leader.
Trading Transport Resources of Communication Networks on Bandwidth Exchanges W. Stańczuk, J. Lubacz, E. Toczyłowski Warsaw University of Technology, Poland.
Presentation transcript:

- 1 - World Gas Model Franziska Holz Joint Work with Ruud Egging, Steve Gabriel, and Jifang Zhuang Work in Progress Presented at the 4 th PhD Seminar of Natural Gas Oxford, November 10, 2006 DIW Berlin University of Maryland

- 2 - Outline Model Overview Optimization Problems of Selected Players -Producers -Transmitters -Pipeline operators -Storage operators -Marketers State of the Work and Future Plans

- 3 - Model Overview - Static complementarity model of the world natural gas market - Daily flows seasonal patterns over one year - Detailed representation of the players in the natural gas business: -Producers -Transmitters -Liquefiers -Regasifiers -Storage operators -Marketers - Mixed complementarity approach instead of MPEC which would we hard to solve One stage with market power (one player) - Other players assumed to behave competitively, and to be linked via market-clearing conditions

- 4 - INDUSTRIAL CITY GATE STATION COMMERCIAL RESIDENTIAL DISTRIBUTION SYSTEM UNDERGROUND STORAGE TRANSMISSION SYSTEM Cleaner Compressor Station GAS PROCESSING PLANT GAS PRODUCTION Gas Well Associated Gas and Oil Well Impurities Gaseous Products Liquid Products ELECTRIC POWER Overview of the Natural Gas Industry International Gas Pipeline National network: local transportation LNG Marketer/Shippers

- 5 - Overall picture T1 C1 T2 K1,2,3 S1 M1 T3 C3 K1,2,3 S3 M3 R3 Season 2,3 Season 1 L1 Producer Transmitter Sectors Marketer LNG Liquef Storage LNG Regasif Country 1 Country 3 Country 2 T 1

- 6 - Model Overview - Static complementarity model of the world natural gas market - Daily flows seasonal patterns over one year - Detailed representation of the players in the natural gas business: -Producers -Transmitters -Liquefiers -Regasifiers -Storage operators -Marketers - Mixed complementarity approach instead of MPEC which would we hard to solve One stage with market power (one player) - Other players assumed to behave competitively, and to be linked via market-clearing conditions

- 7 - Maximize production revenues less production costs s.t. -bounds on daily production rates -bounds on volume of gas produced in time-window of analysis (one year) Decision Variables -How much to produce in season and year (cubic meters/day) Market Clearing -Producers sales MUST EQUAL Transmitters purchases from Producer Producers Problem: Description

- 8 - Producers Problem: Formulation

- 9 - Complementarity Formulation: KKT Conditions of the Producers Problem

Maximize selling revenues less purchase costs from its domestic producer s.t. -material balances, including international pipeline losses Decision Variables -How much to sell in season and year (cubic meters/day) -How much to buy from producers and neighboring transmitters (cubic meters/day) Market Clearing: -Sales MUST EQUAL Purchases of (domestic) Marketers, Storage and LNG Liquefaction Transmitters Problem: Description

Interfaces between producers and end-user markets (marketers) Separate entity Market mechanism vs. dedicated trading companies for each producer Some real world counterparts (e.g., Gazexport) Low/high calorific markets: not that interesting not included for the time being New concept, seems to work, non-conventional Here presented formulation: producer dedicated transmitters Transmitter Characteristics

Incorporating market power in Transmitters Formulation Market power in Europe: producers Initial transmitter formulation: producers face only one buyer. Exerting market power only relative to this one buyer, no direct means to withhold gas from or bring it to specific markets. So what … ? multiple transmitters, dedicated for one producer integrate transmitter into producer (more conventional) one transmitter per producer = the exporting subsidiary of a producer The transmitter is exerting the market power vis- à -vis its customers, not the producer Decision Criteria: Usefulness Num Variables ~ Solvability, Acceptance Usefulness: there are examples of this type of agent in reality (e.g., Gazexport) Solvability: turns out not to be increased but we stick with this representation

Transmitters Problem: Formulation

Maximize congestion revenues s.t. -capacity bounds on flow Decision Variables -How much capacity to sell to Transmitters (in each season and year) Market Clearing -Capacity sold to Transmitters MUST EQUAL Capacity purchased by Transmitters Pipeline Operators Problem: Description

Pipeline Operators Problem: Formulation

Storage Reservoir Operators Problem: Description Maximize net revenues from marketers less injection costs, distribution costs, and purchasing costs from transmitter and LNG Regasification s.t. -volumetric bound on working gas -maximum extraction rate bound -maximum injection rate bound -annual injection-extraction balancing Decision Variables -How much gas to buy from Transmitters and LNG Regasifiers -How much gas to sell to Marketers Market Clearing -Storage Operators Sales MUST EQUAL Marketers Purchases from Storage

Storage Reservoir Operators Problem: Formulation

Marketer/Shippers Problem: Description Marketer/Shipper Maximize demand sector revenues less local delivered costs from transmitter, storage and LNG Regasification s.t. -Sales to Sectors MUST EQUAL Purchases from Transmitter, Storage, LNG Regasifier Decision Variables -How much to buy from transmitter, storage and LNG -How much to sell to each sector

Marketer/Shippers Problem: Formulation Marketer/Shipper Marketers dont have a decision variable, but are determined by their demand function to the transmitters Market clearing must be satisfied

Application Covers Europe and all LNG world-wide, one player each type in each country (when applicable.) 51 countries (also outside of Europe) 28 producers 15 large, 5 LNG only, 13 domestic only 36 consuming countries 3 sectors/countries, 6 LNG only LNG: 10 Liquefiers, 15 Regasifiers, 150 LNG routes 20 Storage Operators 74 pipelines Programmed in GAMS using PATH

State of the Work and Future Plans Currently: Running simulations for model with market power and for different scenarios The rich data input allows to investigate issues like international LNG flows, substitution effects between Russian, North African pipeline gas and LNG Later: extensions of the model Stochasticity into players problems, for example with stochastic demand realizations Alternative demand functions Scenario Reduction & Decomposition Other strategic behavior/market power for producers, marketers Dynamic model with decisions on investments in transport infrastructure

Thank you very much for your attention! For any comments and suggestions, please contact: