Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

31/10/2011LHC 8:30 meeting 1 Overview LHC Operation Week 43 Machine Coordinators: Barbara Holzer & Jan Uythoven.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
Saturday 6:13 – 15:00 STABLE BEAMS  scans etc. 15:00 moved to ADJUST Squeeze to 2 m in two steps 11 – 5 – 2  remarkably smooth  tertiary collimators.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday
MD Planning Fri – Sat (26. – 27.8.)
Wednesday 8.9 External crossing angles:
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary Friday h38: Ramp down and pre-cycle.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Summary of week 7 Hardware Commissioning:
Saturday 30th June - Sunday: Rocky !
Summary of ion week 48 Last beam OP summary of 2010 Week 48
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Coordination: G. Arduini, E.B. Holzer
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
Thursday morning – optics correction
LHC Morning Meeting - G. Arduini
Summary of Week 11: 14 – 21 March
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Alice solenoid – orbit distortion
Summary of Week 16 G. Arduini, J. Wenninger
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
LHC Morning Meeting - G. Arduini
Wednesday 8th August & night
LHC Morning Meeting - G. Arduini
Wednesday 30th November 10:00 Access PZ33 for RP, Cryo, EPC, ELQA
Tuesday 20 March 2012.
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Tuesday Loss maps in the night:
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Planning at 5 o’clock meeting Friday
Friday morning 10:30 Optics measurements and corrections.
LHC Morning Meeting - G. Arduini
Tuesday 9th November 10:02 Fill beams dumped
Sunday
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Saturday 7th May Sat – Sun night
LHC Morning Meeting - G. Arduini
Summary Thursday h21: Stable beams fill #1303.
Wednesday 10/5 Cryo recovery until 18:30
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
Monday 24 October hours of 25ns MD
Saturday 3rd November - morning
IP8 aperture measurements (07:30-10:30)
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
Wednesday 26 October 2011.
Saturday Luminosity production 1380 bunches
31/3/2010 Difficult day… but at the end stable beams.
15/12/2009 Vacuum interlock in sector 78 understood  out-gassing of a Penning gauge ignited as a result of ionization or dust arcing In conclusion: NO.
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Saturday 26 November 2011.
Tuesday
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Friday 28 October 2011

8:32 cryo conditions S56 and S67 back but QPS problem on MB.B9R1 10:39 Start test of IP2 squeezed optics to 1 m and optics measurements, in preparation of the ion run. one pilot per ring Keeping the tune feedback with pilot beams was not obvious: Needed to chirp (and therefore impact the damper controls upgrade) Coupling correction at several steps of beta* 19:38 on momentum beta-beat measurements completed 19:53 Electrical glitch. Cryogenics lost in sector 12. ATLAS Torroid and Solenoid tripped. Short power cut on the Meyrin site. Automatic switch to Swiss electrical network to recover power. The 66->18kV transformer (EHT102-LHC1) suffered from a problem on the control system: the voltage regulation got crazy and several alarms were generated, which produced a cut of the transformer. The Meyrin site was immediately taken over by the MP7 line, but the swap was not without effects: LHC sector 12 went down, together with the cryogenics and ATLAS magnets; PS was as well affected. At about 1:30, the network was put back in its original configuration, after replacement of the control system of the transformer.

18:55 IP2 at 1m beta* for the first time

Summary Coupling and Beat-beat Coupling: Coupling correction has been put in place at IP 2 beta* = 3m, this reduced the global coupling knob. Knob name: Coupling_correction_IP2_ions. At lower beta* this coupling correction was not sufficient, so an additional know will be calculated. Beta-beat: The beta-beat was measured at beta* IP2 = 3, 1.5 and 1m. The beta-beat at 1m is around 20% in the vertical plane and around 10-15% in the horizontal plane for both beams. Detailed analysis will be conducted.

Others TCTH.4R1.B2 motor steps lost 8:30 – 16:30 update of ADT: D. Valuch, F. Dubouchet, W. Hofle : We have installed new front end computers, new drivers, new fesa classes and upgraded firmware in the signal processing units. We could profit from the circulating pilot bunches and preliminarily checked all internal signals using the observation memories. One preamplifier was found broken, it is fixed now (saved time for ions). New critical settings for blowup were set from the CCC. The blowup is installed on all beams and planes, still needs to be checked during the validation with beam (~2 hours). 21:45 Since the vacuum in IP8 was rather bad in the last physics fill, we opened further the TDI.4R8 gap. For the last couple of fills, it had been closed back to +/-20mm positions instead of +/-55mm. We now set it to the intermediate position of +/-37.5mm. 22:31 access for ATLAS

Vacuum at TDI: IP8 at +/-20mm, IP2 at +/-55mm

Satellites Fill #2261 (Enrico Bravin) Satellite distribution for fill 2261. The satellite near the bunches range between 1.5% and 6% with an average of 3%.

Satellites Fill #2261 (Enrico Bravin) Satellites not at 25ns seem to be similar to previous fills. See screen capture: zoom of the buckets histogram: the lines going out of the plot are the main bunches (1E6), then you see the 25ns satellites and very small the other satellites.

Preparation for reduced ‘enhanced’ satellites for next physics fill: aim is 1-2% of main bunches From Steven Hancock and Thomas Bohl

Outlook Cryo back estimated 10:00-11:00 Saturday continuation of: preparations for ion run using proton pilot beams Second ramp for ALICE squeeze to 1.0 m Aperture measurement Checking/setting injection orbit Afterwards approximately 2 hours of ADT validation Then till Sunday 16:00 (End of proton physics 2011) : Luminosity production 18:00 Sunday – 6:00 Saturday 5 November: MD block 4 Others: Maybe end of fill study reducing the ADT gain (check beam lifetime, emittance growth, luminosity lifetime) ATLAS requested ~10 minutes at end of fill of beam separation by +-3 sigma separation in the vertical plane +-1 sigma separation in the horizontal plane