Wrap-Up Discussion: EIC R&D and Future Collaborations

Slides:



Advertisements
Similar presentations
Simulation Study For MEIC Electron Cooling He Zhang, Yuhong Zhang Thomas Jefferson National Accelerator Facility Abstract Electron cooling of the ion beams.
Advertisements

Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
Design Considerations LHC hadron beams: E p =7 TeV E A =E e  Z/A Luminosity O (10 33 ) cm -2 s -1 with Beam Power 100 MW (wall plug) Integrated e ± p.
1 LHeC Considerations for a Lepton Hadron Collider Option for the LHC F. Willeke, BNL The 4th Electron Ion Collider Workshop Hampton University,
Recirculating pass optics V.Ptitsyn, D.Trbojevic, N.Tsoupas.
Luminosity Prospects of LHeC, a Lepton Proton Collider in the LHC Tunnel DESY Colloquium May F. Willeke, DESY.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
Full-Acceptance Detector Integration at MEIC Vasiliy Morozov for MEIC Study Group Electron Ion Collider Users Meeting, Stony Brook University June 27,
R&D, Collaborations and Closeout Fulvia Pilat MEIC Collaboration Meeting March
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility EIC Collaboration Meeting, Hampton University, May 19-23,
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
Operated by the Jefferson Science Associates for the U.S. Depart. Of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz, Dogbone RLA – Design.
ERHIC design status V.Ptitsyn for the eRHIC design team.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility 1 Alex Bogacz EIC14 Workshop, Jefferson Lab, March 20,
Plan for Review of FCC- ee Optics and Beam Dynamics Frank Zimmermann FCC-ee Design Meeting 31 August 2015.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
Thomas Roser EIC AC meeting November 3-4, 2009 EIC Accelerator R&D Strategy and Programs Thomas Roser/Andrew Hutton BNL / Jefferson Lab R&D program is.
Future Circular Collider Study Kickoff Meeting CERN ERL TEST FACILITY STAGES AND OPTICS 12–15 February 2014, University of Geneva Alessandra Valloni.
Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz,
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz Status and Plans for Linac and RLAs.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz 1 Status of Baseline Linac and RLAs Design.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz IDS- NF Acceleration Meeting, Jefferson Lab,
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz NuFact’08, Valencia, Spain, July 4, 2008 Acceleration.
Research and development toward a future Muon Collider Katsuya Yonehara Accelerator Physics Center, Fermilab On behalf of Muon Accelerator Program Draft.
Full-Acceptance & 2 nd Detector Region Designs V.S. Morozov on behalf of the JLEIC detector study group JLEIC Collaboration Meeting, JLab March 29-31,
WG2: Beam Dynamics, Optics and Instrumentation – Summary
FCC-ee Interaction Region design
PERLE - Current Accelerator Design
JLEIC Collaboration Meeting Closeout considerations
R&D Topics for FOA Funding Proposals
Large Booster and Collider Ring
Very Asymmetric Collider for Dark Matter Search below 1 GeV
CLIC-ILC BDS & MDI work.
Electron collider ring Chromaticity Compensation and dynamic aperture
Muon RLA - Design Status and Simulations
Status of the VEPP-2000 Collider Project at Novosibirsk
Muon RLA - Design Status and New Options
Linac and RLAs – Overview of NF-IDS
CEPC-SppC Accelerator CDR Copmpletion at the end of 2017
Introduction to Jefferson Lab
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Other issues and concepts under study Conclusions References
Specifications for the JLEIC IR Magnets
Why is the CBETA Important for the Electron Ion Colliders?
JLEIC Collaboration Meeting Spring 2017
Accelerator R&D Results from the B-factory
Optics and Layout of Alex Bogacz Workshop, Orsay, Feb. 23, 2017.
Accelerator and Interaction Region
Summary of Beam Cooling Parallel Session
Summary of Washington DOE Review
Muon RLA - Design Status and New Options
– Overview Alex Bogacz JLAB, Aug. 14, 2017.
Polarized Positrons in JLEIC
Muon RLA - Design Status and Simulations
JLEIC Reaching 140 GeV CM Energy: Concept and Luminosity Estimate
Update on the JLEIC pCDR
HE-JLEIC: Boosting Luminosity at High Energy
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Status and plans for crab crossing studies at JLEIC
JLEIC Main Parameters with Strong Electron Cooling
FY18-19 EIC R&D FOA FY 2018 Research and Development for Next Generation Nuclear Physics Accelerator Facilities Web site:
Comments to the Report of the Community Review of EIC Accelerator R&D for the Office of Nuclear Physics, February 13, 2017 (60 pages) By Haipeng Wang,
JLEIC Electron Ring Nonlinear Dynamics Work Plan
HE-JLEIC: Do We Have a Baseline?
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Some Thoughts on the JLEIC Ion Injector
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Updated MEIC Ion Beam Formation Scheme
Presentation transcript:

Wrap-Up Discussion: EIC R&D and Future Collaborations Andrei Seryi and Ferdinand Willeke With input and ideas from many colleagues EIC Accelerator Collaboration Meeting October 29 - November 1, 2018

Fall 2018 EIC Accelerator Collaboration Meeting EIC collaboration A lot of opportunities to strengthen EIC collaboration With national labs and universities (as described by Ferdinand) With worldwide nuclear physics / particle physics / accelerator centers Many areas of collaboration opportunities Machine Detector Interface Beam cooling SRF technology SC magnets … Opportunities and synergy with ongoing and planned projects IR / SRF – HE-LHC, Super-B, LCLS-HE, FCC, LHeC, ILC, CEPC, … October 29 – November 1, 2018 Fall 2018 EIC Accelerator Collaboration Meeting

Detector & MDI – collaboration opportunity IR designed to support ~full-acceptance detection  unprecedented requirement Satisfy geometric match (elements) and beam dynamics (chromatic compensation) Crab crossing: large (25-50 mrad), avoiding parasitic collisions, optimizing detections IP electron ions forward e detection Compton polarimetry dispersion suppressor/ geometric match spectrometers forward ion detection IR Layout Central Detector Significant need/ opportunities for collaboration on EIC detector and Machine Detector Interface October 29 – November 1, 2018 Fall 2018 EIC Accelerator Collaboration Meeting

MDI & IR – expanding collaboration efforts Work on common set of physics channels to define detector acceptance Work on ”Machine – Detector interface requirement document” Possible title: Functional Requirements on the Design of the Detectors and the Interaction Region of EIC This paper aims to separate the functional requirements of an EIC interaction region and machine detector interface from any particular conceptual or technical solution that might have been proposed to date by design teams, and to document the requirements. EIC User group / MDI team– opportunity to lead the efforts Opportunity to engage European and world-wide collaborators European Strategy update for particle physics October 29 – November 1, 2018 Fall 2018 EIC Accelerator Collaboration Meeting

Machine – Detector interface requirement document Functional Requirements on the Design of the Detectors and the Interaction Region of EIC MDI interface document: Complementary to pre-CDR (CDR), Detector Handbook Focus only on requirements, not solutions Opportunity to be lead by EIC UG MDI team – potential for large international collaboration October 29 – November 1, 2018 Fall 2018 EIC Accelerator Collaboration Meeting

European Strategy update for particle physics Every few years, the European particle physics community reviews the roadmap and priorities of the field, updating the European Strategy for Particle Physics (ESPP) The update process has been launched by the CERN Council in September 2018 and is scheduled to be completed in May 2020 Submissions (10 pages) are due by 18 December 2018 EIC is planning to make two coordinated submissions: EIC Physics (coordinated by EIC User Group) EIC Accelerator Science and Technology (coordinated by F.W. and A.S.) The goals of submissions is to enhance collaboration on EIC October 29 – November 1, 2018 Fall 2018 EIC Accelerator Collaboration Meeting

Fall 2018 EIC Accelerator Collaboration Meeting https://indico.cern.ch/event/729871/ October 29 – November 1, 2018 Fall 2018 EIC Accelerator Collaboration Meeting

ESPP Open Symposium – May 2019 Extract from agenda of ESPP Open Symposium 2012: We hope EIC will get on the agenda of Accelerator Science and Technology section in May 2019 symposium https://indico.cern.ch/event/182232/ October 29 – November 1, 2018 Fall 2018 EIC Accelerator Collaboration Meeting

Fall 2018 EIC Accelerator Collaboration Meeting “EIC Accelerator Science and Technology” - submission to European Strategy Sections of the 10-pager draft: The Physics Motivation of the Electron Ion Collider (1p) Lessons learned from previous/existing machines & path forward (0.5p) The JLEIC design of the EIC (~3p) The eRHIC design of the EIC (~3p) Common table of JLEIC and eRHIC parameters (0.5p) Research and Development for the electron ion collider (~1p) EIC R&D synergies with European projects (~1p) October 29 – November 1, 2018 Fall 2018 EIC Accelerator Collaboration Meeting

EIC Accelerator Science and Technology – from the draft: October 29 – November 1, 2018 Fall 2018 EIC Accelerator Collaboration Meeting

Fall 2018 EIC Accelerator Collaboration Meeting Backup slides October 29 – November 1, 2018 Fall 2018 EIC Accelerator Collaboration Meeting

Examples of projects synergies between EIC and European projects Examples of ongoing collaboration (incomplete list) HL-LHC crab cavity system (ODU and JLab) – CERN, UK, … PERLE ( LHeC ER demo) – cavities, optics – LAL & IPN Orsay, … Muon Collider (e+e- threshold version) FFAG optics – INFN, … Next slides - illustrations for some of this work Thanks for materials for slides: Alex Bogacz, Jean Delayen, Frank Marhauser, Vasiliy Morozov, Tony Reilly, Bob Rimmer, Todd Satogata, Yuhong Zhang and many other October 29 – November 1, 2018 Fall 2018 EIC Accelerator Collaboration Meeting

LHC High Luminosity Upgrade and crab cavities Design of crabbing system ODU involvement since 2009 S. De Silva , PhD student, now scientist H. Park, PhD student R. Olave, post-doc Collaboration with Z. Li (SLAC) and N. Huque (JLab) October 29 – November 1, 2018 Fall 2018 EIC Accelerator Collaboration Meeting

Crabbing System for LHC High Luminosity Upgrade Proof-of-Principle Cavity S. De Silva’s ODU PhD work Prototype Cavity ODU/SLAC HOM Couplers ODU/SLAC/JLab October 29 – November 1, 2018 Fall 2018 EIC Accelerator Collaboration Meeting

Fundamental Power Coupler Test on the CERN SPS Cryo Jumper Tuning System Fundamental Power Coupler HOM Couplers Crab Cavity Operation in a Hadron Ring ODU/BNL/Jlab Collaboration Supported by DOE-NP grant October 29 – November 1, 2018 Fall 2018 EIC Accelerator Collaboration Meeting

PERLE – ‘Stepping Stone’ for 100 MW ERLs 400 MeV 3 passes ‘up’ + 3 passes ‘down’ PERLE with 10 MW beam power is a unique ‘test bed’ for next generation of high power ERLs Testing multi-pass beam dynamics in energy recovery mode. Demonstrator for the LHeC/FCC_eh ERLs Probing limits of transporting non- equilibrium beams with high ratio of beam power to installed RF power Mitigation of longitudinal phase- space distortion due to wakes, including CSR and longitudinal S-C Preservation of beam quality/stability in presence of collective effects, errors and imperfections Multi-lab collaboration expanding on JLab’s core competencies in: Operation of present state-of-art MW scale ERLs (IR/UV FELs) Beam dynamics and accelerator design for multi-pass ERLs Cavity modeling and cryo-module design Synergy between PERLE and JLEIC Cooler, where similar beam dynamics issues need to be solved October 29 – November 1, 2018 Fall 2018 EIC Accelerator Collaboration Meeting

SRF technology development – PERLE cavity First Nb 802 MHz 5-cell cavity – Oct 2017 802 MHz Niobium single cell cavity – completed in Aug 2017 5-cell cavity being electropolished October 29 – November 1, 2018 Fall 2018 EIC Accelerator Collaboration Meeting

SRF technology development – PERLE cavity Beautiful results on Q and gradient October 29 – November 1, 2018 Fall 2018 EIC Accelerator Collaboration Meeting

PERLE – Optics, Lattices 3-pass up + 3-pass down linac optics with energy recovery October 29 – November 1, 2018 Fall 2018 EIC Accelerator Collaboration Meeting

60 GeV Emittance Preserving ERL for the LHeC   Ongoing collaboration between JLAB and CERN encompasses: Accelerator design and beam dynamics studies Lattice design and performance optimization 802 MHz 5-cell cavity modeling and cryo-module design Future studies will include design of a lower energy 50 GeV ERL option. October 29 – November 1, 2018 Fall 2018 EIC Accelerator Collaboration Meeting

Arc Optics – Emittance preserving FMC cells Arc 3 Optics (30 GeV) October 29 – November 1, 2018 Fall 2018 EIC Accelerator Collaboration Meeting

Muon Acceleration via ‘Dogbone’ RLA Fixed field multi-pass (4.5) RLA based on SRF linac suitable for multi GeV acceleration of fast decaying muons features: Simultaneous acceleration of both m+ and m- charge species ‘Dogbone’ topology offering high efficiency of RF usage (close to factor of 2 higher than a corresponding racetrack) “Bisected” linac optics allowing for accelaration in both directions: the quadrupole gradients are scaled up with momentum for the first half of the linac, then they are mirror reflected in the second half. Compact nested droplet arcs, since no sizable synchrotron radiation Extension to multi-pass FFA-like arcs All the bulling blocks of muon RLA developed at Jlab within Muon Accelerator Program: Engineering design of beamlines, magnet specs Beam dynamics studies of the longitudinal and transverse emittance preservation End-to-end 6D simulation with magnet errors Our pioneering work on muon acceleration is quite applicable to newly emerging path to low emittance muon collider via muon production from electron-positron annihilation (LEMMA). Initial collaboration with INFN Frascati has started to adapt the above scheme to low emittance muon beams and extend the energy range beyond tens of GeV. October 29 – November 1, 2018 Fall 2018 EIC Accelerator Collaboration Meeting

Fall 2018 EIC Accelerator Collaboration Meeting In summary A lot of opportunities to strengthen and expand EIC collaboration October 29 – November 1, 2018 Fall 2018 EIC Accelerator Collaboration Meeting