Atefeh Sadeghzadeh Control engineer – Target safety and control

Slides:



Advertisements
Similar presentations
© 2010 Invensys. All Rights Reserved. The names, logos, and taglines identifying the products and services of Invensys are proprietary marks of Invensys.
Advertisements

EQUIPMENT VALIDATION.
What disciplines students learn in Electrical and Computer Engineering Technology.
Software life cycle processes Purpose n A new international standard (ISO/IEC 12207:1995(E) that –establishes a common framework for software life cycle.
Introduction to Software Testing
Software Verification and Validation (V&V) By Roger U. Fujii Presented by Donovan Faustino.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
CPIS 357 Software Quality & Testing I.Rehab Bahaaddin Ashary Faculty of Computing and Information Technology Information Systems Department Fall 2010.
Requirements Engineering for the Accelerator Eugene Tanke Systems Engineer Workshop on Requirements Conformance for SRF.
VTT-STUK assessment method for safety evaluation of safety-critical computer based systems - application in BE-SECBS project.
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
BE-SECBS FISA 2003 November 13th 2003 page 1 DSR/SAMS/BASP IRSN BE SECBS – IRSN assessment Context application of IRSN methodology to the reference case.
Validation Copyright © 2004 Yokogawa Validation. Copyright © 2004 Yokogawa Page 2 Validation ProjectStandard Project > Validation.
Over View of CENELC Standards for Signalling Applications
Configuration Management Romuald Duperrier Head of Systems Engineering Division April 22, 2015.
Responses to recommendations of TAC 11 Integrated Control Systems Henrik Carling ESS/ICS Date:
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Instrument Construction Phase 1 and beyond Rob Connatser Chief Instrument Project Engineer September, 2014.
1 Interfaces, Engineering and Standards. 2 Interfaces LoKI Interface document description for deliverables Elements: PBS number, Deliverable description,
Installation and Commisioning SE view point Romuald Duperrier ESS SE manager.
 SOFTCON SYSTEMS PVT. LTD. (SSPL) offers unique, creative and practical automation solutions in the field of Process & Power on an LSTK / EPC basis with.
Controls Software Developer - Summer workers The Machine Directorate at the European Spallation Source (ESS) in Lund, Sweden, invites applications for.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
PRODUCT VERIFICATION Adapted from the NASA Systems Engineering Handbook for CSULB EE 400D by Alia Bonetti.
Steve Griffith February 28th, 2017
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Accelerator Readiness Review October 31, 2006
2012 Spring Simulation Interoperability Workshop
Energy Saving Bureau Industrial energy audits in coherence with Directive on the promotion of end-use efficiency and energy services.
JSA Enhancements SIS competencies May, 2012.
Software and Systems Integration
Session II: System authority for ERTMS 4RP Trackside approval
12207.
Flooding Walkdown Guidance
BU IS GIG Chemical, Oil & Gas
Engineering Processes
IEC and Information Technology
ارائه كننده: شاهين انتصاري
Introduction to Software Testing
Lockheed Martin Canada’s SMB Mentoring Program
יוסי שדמתי רק איכות מניהול סיכונים לאימות ותיקוף תהליכי הרכבה From Risk Management to Processes Validation יוסי.
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
First Article Inspection
Medical Device Design and Development
Control Hardware & Status
BS EN 10204:2004 Metallic Products – Types of inspection documents
Engineering Processes
BS EN 10204:2004 Metallic Products – Types of inspection documents
Quality Regulation for Mechanical Equipment RESSQ – Mech
Workshop commissioning Installation Coordination at ESS
Personnel Safety system 0 for the Ion Source and LEBT (PSS0)
Testing Coordination at ESS
Receiving Inspection on incoming goods
Introduction and Safety Plan
PSS verification and validation
Configuration Management
PSS Verification and validation
Author Team Supervisor A. Toral M. Mansouri S.L. Birch Y.K. Sin
On behalf of protection systems
PSS0 Configuration Management,
Safety Readiness Review (SRR) Thomas Hansson, ESH
NSS integrated installation plan workshop Introduction
DOE Review of the LCLS Project October 2006
Machine Protection PLC Based System Verification and Validation Plan
PSS verification and validation
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Computer System Validation
Standards.
Unit IV – Chapter 2 V-Test Model.
Presentation transcript:

Atefeh Sadeghzadeh Control engineer – Target safety and control TSS V&V Atefeh Sadeghzadeh Control engineer – Target safety and control www.europeanspallationsource.se 19-07-11

Outline Purpose Verification Validation Standards and ESS frameworks

Purpose A base for further detailed verification and validation activities Templates standards and platforms identified

Verification The aim of verification activities is to inform managers, testers, and developers about some key issues of the testing process and to demonstrate that systems perform as expected. Software test: verifies that all TSS software meets the specific functional requirements. Software simulation Software integration Factory Acceptance Test (FAT): verifies that the TSS manufactured equipment meets the specified design. The FAT may be performed by the Manufacturer or ESS as applicable. Factory Integration test (FIT): integration of TSS hardware and software will be verified. Verifies that the TSS equipment approved during FAT, including downloaded software, can be integrated and perform the TSS functional requirements. The FIT is performed off the site.

Validation During this phase, the TSS will be validated through inspection and testing to assure that the installed and commissioned TSS meets all requirements. Site Acceptance Test (SAT): validates that the TSS can perform its functional requirements in its operational environment. SAT of installation shall be performed of installer and is a pre-requisite for further SAT. The SAT shall be performed by ESS on the site. Site Integration Test (SIT): validates that TSS system and the interfaced systems work when integrated on the site.

Standards and Frameworks IEC 61511-1:2016, Functional safety – Safety instrumented systems for the process industry sector – Part 1: Framework, definitions, system, hardware and software requirements SS-EN62381, Automation systems in the process industry-Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT) ESS-0117128, ESS handbook for system verification ESS-0094204, ESS Guideline for FAT and SAT ESS-0113711, Site Acceptance Test (SAT) ESS-0113710, Factory Acceptance Test (FAT) ESS-0015433, ESS Rules for electrical design ESS-0145268, Target Safety System Configuration Management plan