XTOD Attenuator Status

Slides:



Advertisements
Similar presentations
Design and Experimental Considerations for Multi-stage Laser Driven Particle Accelerator at 1μm Driving Wavelength Y.Y. Lin( 林元堯), A.C. Chiang (蔣安忠), Y.C.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Richard M. Bionta XTOD July 19-21, 2005 UCRL-PRES-xxxxxx X Ray Diagnostics LCLS FAC Meeting Oct. 27, 2005.
James Welch October 30, FEL Commissioning Plans J. Welch, et. al. FEL Commissioning Plans J. Welch, et. al. Accelerator.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
Stewart Shen April 20, 2006 UCRL-PRES-xxxx LCLS X-Ray Absorber Richard Bionta, Keith Kishiyama, Donn McMahon, Marty Roeben Dimitri Ryutov,
Donn H. McMahon XTOD Breakout: XTOD FY07 October 12, 2006 UCRL-PRES XTOD FY07 Plan LCLS FAC Review October 12, 2006.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
X Ray Transport / Optics / Diagnostics Overview Richard M. Bionta Facility Advisory Committee Meeting April 29, 2004 Richard M. Bionta Facility Advisory.
1 A Grating Spectrograph for the LCLS Philip Heimann Advanced Light Source Observe the spontaneous radiation spectrum of the individual undulators Observe.
Stewart Shen October 27, LCLS-XTOD Gas Attenuator LCLS FAC Meeting October 27, 2005 Stewart Shen, Keith Kishiyama and Marty Roeben.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
John Trent April 20, 2006 UCRL-PRES FAC: XTOD Beam Transport X-ray Slit and Tunnel Design Pat Duffy, Kirby Fong, Keith Kishiyama,
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Richard M. Bionta X-Ray Transport, Diagnostic, & Commissioning September 22, 2004 UCRL-PRES Two Problems... LCLS Diagnostics.
Richard M. Bionta XTOD Layout and Diagnostic October 12-13, 2004 UCRL-PRES-XXXXX XTOD Layout and Diagnostic Systems Facility Advisory.
Richard M. Bionta XTOD Beam and Detector October 12-13, 2004 UCRL-PRES-XXXXX XTOD Beam and Detector Simulations Facility Advisory.
R. M. Bionta SLAC November 14, 2005 UCRL-PRES-XXXXXX LCLS Beam-Based Undulator K Measurements Workshop Use of FEL Off-Axis Zone Plate.
John Arthur Photon Systems April 7, 2005 Photon Systems Overview John Arthur.
PEEM III Endstation Design Review
RF background, analysis of MTA data & implications for MICE Rikard Sandström, Geneva University MICE Collaboration Meeting – Analysis session, October.
Donn H. McMahon XTOD Configuration October 24-26, 2005 UCRL-PRES X Ray Transport, Optics, and Diagnostics Overview FAC.
Richard M. Bionta X-TOD October 12, 2006 UCRL-PRES-xxxxxxx X Ray Diagnostics Overview FAC X-TOD Breakout October 12, 2006.
Recent Results from Dragonfire Armor Simulation Experiments Farrokh Najmabadi, Lane Carlson, John Pulsifer UC San Diego HAPL Meeting, Naval Research Laboratory.
ATLAS TRT CO 2 cooling system project status Beaufort 12: “Hurricane” (>119 km/h) Saffir-Simpson 5: “catastrophic damage” (>250 km/h) (CO 2 distribution.
Oct 17, 2001SALT PFIS Preliminary Design Review1 Southern African Large Telescope Prime Focus Imaging Spectrograph Mechanical Mechanism Design Michael.
BES-III Workshop Oct.2001,Beijing The BESIII Luminosity Monitor High Energy Physics Group Dept. of Modern Physics,USTC P.O.Box 4 Hefei,
Christoph Gabor, ASTeC HIPPI—Meeting (WP 5) 26 th – 28 th September 2007 Non—destructive transverse emittance measurement device The Front End Test Stand.
1 Possibility to obtain a polarized hydrogen molecular target Dmitriy Toporkov Budker Institute of Nuclear Physics Novosibirsk, Russia XIV International.
Electron Spectrometer: Status July 14 Simon Jolly, Lawrence Deacon 1 st July 2014.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
Compressor Helium filled optional equivalent plane imaging laser beam dump hole in mirror for e-beam SSA and more.
X-ray Interferometer Mirror Module ISAL Study Pre-work Overview.
1 1Dr. V.P.Ovsiannikov Cryogenics and vacuum in Dreebit EBITs The vacuum problem in EBIST is the problem of ensuring high vacuum into a long drift tube.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
SSRL Beam Line Infrastructure Update February 2002
Conceptual Design of a Programmable Cone Generator for SK and T2K
Experiments at LCLS wavelength: 0.62 nm (2 keV)
by P. Musumeci and F.Tazzioli
EBTF Design Review Technical Meeting Group
Experimental Facilities Planning
BINP, Novosibirsk, Russia
Design of Distribution Feedbox at LHC P7
LCLS Ultrafast Science Instruments
Proposed Offset Mirror System
Hal Tompkins – Photon Beam Systems Deputy June 8, 2009
Advanced Research Electron Accelerator Laboratory
John N. Galayda – Director of LCLS Construction March 30, 2009
Development of a Large Area Gamma-ray Detector
First demonstration of portable Compton camera to visualize 223-Ra concentration for radionuclide therapy Kazuya Fujieda (Waseda University) J. Kataoka,
X-Ray Transport, Optics, and Diagnostics WBS Alan J
Diagnostics Richard M. Bionta, LLNL April 24, 2002
Undulator Line Design Liz Moog, Advanced Photon Source April 24, 2002
(WBS ) Alan Wootton, LLNL April 24, 2002
Project Management Issues John N. Galayda, SLAC April 24, 2002
Optics John Arthur, SLAC & William W. Craig, LLNL April 24, 2002
FEE Diagnostics and Commissioning
Hal Tompkins – Photon Beam Systems Deputy May 14, 2009
DOE Review 7-9 February, 2006 Steve Lewis
Photon Systems Breakout Lehman Review July 11, 2007
XTOD Layout and Diagnostic Systems
BGC Collaboration Meeting –
X Ray Transport, Optics, and Diagnostics Overview
LCLS Lehman Review February 7-9, 2005
LCLS XTOD Mechanical and Vacuum Systems; Gas Attenuator
Lehman Review: XTOD Beam Transport
LCLS Photon Systems Overview
What if you use a capillary, small specimen or transmission technique
Keith Kishiyama, Marty Roeben Dimitri Ryutov, John Trent and
LCLS Lehman Review February 7-9, 2005
Presentation transcript:

XTOD Attenuator Status DOE Review of the LCLS Project (SC4) October 25, 2006 Richard Bionta, Stefan Hau-Riege, Keith Kishiyama, Donn McMahon, Marty Roeben, Dimitri Ryutov, John Trent and Stewart Shen This work was performed under the auspices of the U.S. Department of Energy by the University of California, Lawrence Livermore National Laboratory under Contract No. W-7405-Eng-48.

Content Physics Requirements Aperture Arrangement Gas Attenuator Solid Attenuator Integrated Attenuator Design Prototype Testing Project Management Issues

Design based on Physics Requirements* * LCLS-PRD-1.5-003 “Physics Requirements for the XTOD Attenuator System”, 3/15/2006

Attenuator is part of Front End Enclosure (FEE) Slit Solid Attenuators Spectrometer Package Collimator 1 Total Energy Fixed Mask Beam Direction Gas Attenuator Gas Detector Gas Detector Direct Imager (Scintillator) FEL Offset Mirror System

Gas Detector / Attenuator Conceptual Configuration N2 boil-off (surface) Gas detector Flow restrictor 4.5 meter long, high pressure N2 section Differential pumping sections separated by 3 mm apertures 3 mm diameter holes in Be disks allow 880 mm (FWHM), 827 eV FEL to pass unobstructed Solid attenuators N2 Gas inlet Green line carries exhaust to surface Status Attenuator: PRD done SCR done Prototype done ESD draft PDR in preparation Gas detector

Prototype Gas Attenuator runs well at 0-20 Torr

Gas detectors share differential pumping with the Gas Attenuator Optical band pass filter Photo diode Gas Attenuator high pressure section Gas detector ~1 Torr ~10-3 Torr ~0.1 to 2 Torr N2 ~10-3 Torr 20 Torr ~10-6 Torr ~20 cm inner diameter non-specular reflective surface (e.g. treated Al) Single shot, non destructive, measurement of u 2 m 5Torr no problem according to Stew Optical ND filters Photo tube LCLS X rays cause N2 molecules to fluoresce in the near UV

3-mm Apertures in Transition Stages with Bellows to allow transverse positioning of opening in window Be disk on gate valve survives FEL hits. Disks are transparent to high energy spontaneous, allowing alignment of hole using WFOVDI camera in FEE. Gate valve removes window when gas attenuator not in use and for ease of alignment.

Alignment concept using direct imager Gas Detector 1 Gas Attenuator Gas Detector 2 ~10-6 Torr 2 Torr 2 Torr ~10-6 Torr 20 Torr 10 cm 4.5 m 10 cm 2 m 2 m WFOV Direct Imager 1.5 m 1.5 m

Open valves to align sections Gas Detector 1 Gas Attenuator Gas Detector 2 0.7 Torr ~10-6 Torr 20 Torr 0.7 Torr 10 cm 4.5 m 2 m 10 cm 2 m WFOV Direct Imager 1.5 m 1.5 m

(40 mm diameter x 1 mm thick with 3 mm diameter hole through center) 10 cm 1 window 1 window with Ta ring 3 windows with Ta rings Low energy spontaneous through attenuator windows (40 mm diameter x 1 mm thick with 3 mm diameter hole through center) 3 mm hole may be hard to see (limited by simulation statistics) but Ta rings allow easy identification of hole position

Direct imager image of saturated low energy FEL + Spontaneous All valves open 3 valves closed 4.6 mR + 6 mm misalignment 0.46 mR + 300 mm misalignment Direct imager image of saturated low energy FEL + Spontaneous With this method it is easy to locate the FEL and systematically align the apertures with the FEL wherever it is located

Attenuator Risks and Mitigations Pressure calculations, and system stability (pumping, temperature, flow) Retired. Proved by prototype testing results. Accuracy & Repeatability Unachievable Repeatability proven. Accuracy within 5% likely achieved, assuming local temp fluctuation is negligible. Possible Optical Distortion caused by gas plume disturbance Calculation shows it is not a problem. Contribution of the transition stages to uncertainties in the attenuation In PDR, shorter transition stages will be pursued. Corrosion of the Be by the N2 gas or ions This could be a problem, Ar gas is the alternative, or replace the Be with B4C.

Prototype Integrated Attenuator System Gas Attenuator Gas Detector Cell

Gas Detector Cell Last Stage (Stage 6)

Completed Prototype System @ LLNL Vacuum Lab Gas Flow Control-1 Gas Flow Control-2 Gas Attenuator Gas Detector Cell Last Stage

Integrated System Vacuum Modeling Pressure Distribution Normal Operation Gas Attenuator 20 Torr Gas Detector 2.5 Torr Pressure Distribution Attenuator Pressure 20 Torr V-2 1.02 Torr V-3 1.86x10-3 Torr V-4 (GD) 2.0 Torr V-5 4.74x10-3 Torr V-6 3.55x10-6 Torr Qi 1506 sccm Qg 171 sccm RESULTS In response to step gas inputs of Qi and Qg,, 1.Attenuator pressure reached design level (20 Torr) 2.Gas detector pressure reached design level (2.0 Torr) 3. Last stage pressure met boundary conditions (~3x10-6 Torr)

Integrated System Vacuum Modeling Pressure Distribution Stand-by Operation Gas Attenuator 0 Torr Gas Detector 2.5 Torr Pressure Distribution Attenuator Pressure 1.95x10-4 Torr V-2 7.5x10-5 Torr V-3 6.6x10-4 Torr V-4 (GD) 2.0 Torr V-5 4.74x10-3 Torr V-6 3.55x10-6 Torr Qi 0 sccm Qg 171 sccm RESULTS In response to sudden drop of gas input of Qi,, 1.Attenuator pressure was lowered to ZERO level (10-4 Torr) 2.Gas detector pressure maintained at design level (2.0 Torr) 3.Last stage pressure still met boundary conditions (~3x10-6 Torr)

Prototype Tests (10/10/06) Pressures of Gas Attenuator and Gas Detector can be operated independently.

Comparison of Measurement & Calculation Value GA-P (Torr) GD-P GA-Flow (sccm) GD-Flow Stage-2 P Stage-3P Stage-5 P Stage-6 P Measured 20 2 1600 220 .84 4.77x10-3 2.42x10-3 4.33x10-6 Calculated* 1506 171 1.02 1.86x10-3 4.74x10-3 3.55x10-6 * Pump Speed S(p) was extrapolated from catalogue values

Purpose of Solid Attenuator Attenuates high energy x-rays from to levels of current x-ray sources Diagnostics may not be damaged Experiments may be performed without damage Attenuates x-rays whose energy is too high for gas attenuator to attenuate to level desired Works in series with gas attenuator – effects may be superposed Overlaps in attenuation levels with gas attenuator to allow large dynamic range with fine levels

Solid Attenuator Concept Overview 64 attenuation levels Six highly polished Be slides Each twice as thick as the last (0.5 to 16 mm) Up to 2,300x attenuation of 8.26 keV x-rays Millions of attenuation levels when used with gas attenuator Pneumatically actuated

Front View – Attenuating Pneumatic Actuator Custom Vacuum Vessel Adapter Flange Attenuator Block Attenuator Block Holder

How Solid and Gas Work Together For 8.26 keV x-rays the range of the gas attenuation with Nitrogen at 0 to 30 Torr is 86.7% to 100% transmission The thinnest solid attenuator (0.5 mm) at 8.26 keV provides 87.6% transmission Overlap means gas fills in between solid levels – very fine resolution and large range

X-ray Energy (eV) 8267 7000 6000 5000 4000 3000 2000 Be Attenuation Length (mm) 4060 3051 1875 1057 539 224.9 64.8 Gas Attenuator Trans. - 30 Torr N2 (4.5 m) 86.7% 78.6% 67.7% 50.4% 25.8% 4.0% 0.0%   Thickness (mm) Transmission 0.0 100.0% 0.5 87.6% 83.7% 74.9% 60.0% 36.7% 9.1% 1.0 77.5% 71.1% 57.4% 37.4% 14.5% 1.0% 1.5 68.5% 60.3% 44.0% 23.3% 5.7% 0.1% 2.0 60.6% 51.2% 33.7% 2.3% 4.0 37.0% 26.6% 11.6% 2.2% 8.0 13.8% 7.2% 1.4% 16.0 1.9% 0.5% 31.5 0.04% 0.00%

What if maximum Gas Pressure is 20 Torr? If maximum pressure is 20 Torr there will be small gaps in achievable transmission levels At 2 keV – No gaps from 100 to 0.1% At 3 keV – 11.7 to 9.1%, 1.06 to 1.0%, etc. At 4 keV – 40.6 to 36.7%, 14.9 to 14.5%, etc. All requirements are met – at least 3 steps per decade (8 desired) 30 Torr operation will be explored

Solid Attenuator Actuator Prototype Measured angular repeatability of face of test block using CMM Repeats within 0.2 deg. 2.2 degrees required Will repeat within 0.1% of attenuation level 5% required Actuator Test Block CMM Probe

Attenuator DP Stand – Preliminary Design

Integrated Attenuator System ~ 8.5 m

XTOD Attenuator Subsystem Schedule System Concept Review (4/06) Prototype Testing Results (10/06) ESD (10/06) Preliminary Design Review (12/06) Final Design Review (3/07) Procurement (6/07) Assemble/Test (9/07) FEE Beneficial Occupancy (11/07) Operational (2/08)

Summary Integrated Attenuator System design is workable and offers numerous advantages. Risk areas are identified. Obtained excellent prototype testing results. Vacuum computer modeling yields satisfactory results. No technical problems are foreseen. Project schedule meets current program plan.