Les Recksiedler. - Similar transformers not gassing or failing -Increased harmonic currents -No gassing during factory load run -No increase in gassing.

Slides:



Advertisements
Similar presentations
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200.
Advertisements

$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500.
Section 12.2: Chemical Calculations
Section 12.2: Chemical Calculations
AP Chemistry Chapter 3 Chemical Quantities (The Mole)
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Demonstration Problem
Fundamentals of Cost Management Chapter 10 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
Ch. 17 #11-12: These problems are just KE problems, like good old ½mv 2, with the slight twist that you must convert the KE values from eV to Joules before.
UPS Topologies and Multi-Module Configurations
“A little knowledge is a dangerous thing. So is a lot.”
Reliability McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
ABB djr 00/2 Components USA. ABB djr 00/2 Thermal Considerations when Condenser Bushings Are Applied in Bus Duct.
Chapter 4 Transformer Connections
ESLS 04 Daresbury Laboratory
Electrical Cable Aging and Condition Monitoring Codes and Standards for Nuclear Power Plants Electrical Cable Task Group (ECTG) NESCC Update: 7 November.
PX Activity Rules Robert Wilson Presentation to PX Team, 2/10/97.
1 PJH Charlotte, NC March 18, 2008 Liquid Dielectric Test Tables Task Force (C ) Rev 17 Porto, Portugal October 7, 2008.
Bolland Hybrid power production systems – integrated solutions Olav Bolland Professor Norwegian University of Science and Technology (NTNU) KIFEE-Symposium,
Year 10 C Pathway Mr. D. Patterson. Outcomes Convert from moles to volume of a gas (and vice versa) at standard temperature and pressure Use the conversion.
Re-Order Point Problems Set 1: General
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Calderglen High School
Objectives The student will be able to:
Unit 11 Stoichiometry CP Chemistry.
Aim: What is an organic compound?
Slide 1 Expectations of DNOs & Willingness to Pay for Improvements in Service May 2008.
Luiz Cheim, Lan Lin - IEEE Fall Meeting - Milwaukee 10/23/2012 IEEE C Revision (Nov 2011) TF Database Analysis TF Database Analysis Luiz Cheim and.
Connie Gao 1/26/2015 RMG Study Group RMG-Py Release Updates.
5 GAS DIAGNOSTICS What Goes In Must Be Consumed, If Not It Comes Out! Steve Zack.
Case Studies Task Force IEEE C Workgroup Meeting Milwaukee, WI.
ECE Electric Drives Topic 6: Voltage-Fed Converters Spring 2004.
ENERGY CONVERSION ONE (Course 25741)
RMM Systems, LLC By Sam Rietta RMM Systems, LLC is a manufacturer's representative firm focused on providing value added sales solutions by providing.
Operated by Los Alamos National Security, LLC for NNSA U N C L A S S I F I E D Slide 1 Dissolved Gas-in-Oil Analysis for Preventative Maintenance of the.
Safety Assessment for Electric Utility Workers Exposed to ELF-EMF: Literature Review Tarek K Abdel-Galil Ibrahim O Habiballah 27 Nov
EQUIVALENT CIRCUIT OF TRANSFORMER Lecture No. 5 By: Sajid Hussain Qazi.
Three-Phase ac Voltage Generation
Mehran University College Of Engineering & Technology, Khairpur Mir’s
DC/AC Fundamentals: A Systems Approach
Electronics Fundamentals 8 th edition Floyd/Buchla © 2010 Pearson Education, Upper Saddle River, NJ All Rights Reserved. chapter 14 electronics.
LECTURE 27 Controlled Rectifiers Dr. Rostamkolai
1.6 Real Single-Phase Transformer.
POWER SYSTEM PROTECTION
Announcements For lectures 8 to 10 please be reading Chapter 3
1 LBDS Testing Before Operation Jan Uythoven (AB/BT) Based on the work of many people in the KSL, EC and TL sections.
Elec467 Power Machines & Transformers
IEEE PES General Meeting, Tampa FL June 24-28, Chapter 3 Harmonic Modeling of Networks Contributors: T. Ortmyer, C. Hatziadoniu, and P. Ribeiro.
Simulation results for powering serial connected magnets Daniel Siemaszko, Serge Pittet OUTLINE : Serial configuration of full rated converters.
The Transformer (Primary has N P turns) (Secondary has N S turns) The source side is called Primary The load side is called Secondary.
REPAIRABLE SYSTEMS 1 AVAILABILITY ENGINEERING. A Single Repairable Component With Failure Rate λ and Repair Rate μ The component may exist in one of Two.
Why a summersible medium voltage converter scientific purpose industrial purpose deep sea environment is one of the more challenging and wide field of.
HVDC Transmission.
Three-Phase Transformer
1. 2 Magnetization Current in a Real transformer Although the output of the transformer is open circuit, there will still be current flow in the primary.
TRANSFORMER A transformer is a static device.
ECE 476 POWER SYSTEM ANALYSIS
Your Safety, Our Future.
HVDC Transmission part 2. Types of HVDC links: Monopolar link Bipolar link Homopolar link.
THREE-PHASE GROUND-FAULT BASICS
Harsh Environment Power Conditioning Voltage Regulator
Lecture 10 - Transformers/Three-Phase Circuits
Outdoor Power Conditioning Voltage Regulator
Indoor Power Conditioning Voltage Regulator
Chapter 14.
Outdoor Power Conditioning Voltage Regulator
Harsh Environment Power Conditioning Voltage Regulator
Indoor Power Conditioning Voltage Regulator
Chapter 33 Transformer: Three Phase. Chapter 33 Transformer: Three Phase.
Presentation transcript:

Les Recksiedler

- Similar transformers not gassing or failing -Increased harmonic currents -No gassing during factory load run -No increase in gassing during 2 day Field test load run -One supplier known for cookie cutter approach -Failure of three winding transformers in USA analyzed to be due to harmonics. -All transformer in each HVDC system either gassing or not. -Data is sparse Background – Transformers with a Wye and Delta secondary winding

- HVDC System one year earlier all transformers not gassing -All Transformer one year later gassing badly -One transformer failed after 5 years -3 transformer failures so far in 26 years -Reports not available for transformer repairs -No gassing during factory load run assumed to be 12 hours -No appreciable gas increase during 2 day Field load run. -Appreciable gassing within two months of in-service Case A– Three Phase Transformers with a Wye and Delta secondary winding

- Duvals Triangle – about 700 oC -No Furans one test only Case A– Gassing Results HydrogenMethaneAcetyleneEthyleneEthane Years H2H2 CH 4 C2H2C2H4C2H6COCO 2 TDCG ppmCO 2/ CO NormalLowNormalHigh NormalMediumLowAbnormal NormalMediumNormalHigh Medium Abnormal LowHighNormalHigh NormalMediumHighAbnormal

Case A – Field Load Run Tests – Two Days Hydrogen Methane Ethane Ethylene Acetylene CO CO TDCG

Case B – Single Phase Transformers with a Wye and Delta Secondary winding All transformers in one HVDC system gassing One unit has acetylene and is being repaired Similar HVDC scheme all transformers not gassing Same supplier for both. Non gassing transformers produced 11 years earlier Remaining units are acceptable ????

Case B – Gassing Results – Two worst units excluding unit with Acetylene Unit 1 Unit 2 Condition/Risk Methane Medium Ethylene High Acetylene < 5 < 5 Normal Extreme gassing above 70% loading Gassing 100 to 1000 times the daily gas volume in IEC table A3 at high loading

Case C – Gassing and Failures linked to Harmonics IEEE transactions Volume 19, No 1, pp dated January 2004, Thermal problems caused by Harmonic Frequency Leakage Fluxes in 3 Phase 3 winding Converter Transformers Magnetic fluxes must be managed Use CTC cable Leads arranged to cancel fluxes Increased distances Non-magnetic structural framework

Conclusions Factory Testing cannot ensure a reliable converter transformer? Design Review a possible solution? What are critical factors to consider? Winding configuration, lead routing, flux cancellation? Should warranty consider gassing results? If so at what level?

QUESTIONS & ANSWERS