STC with CSI feedback IEEE P Wireless LANs Date:

Slides:



Advertisements
Similar presentations
LB84 General AdHoc Group Sept. Closing TGn Motions
Advertisements

LB84 General AdHoc Group Sept. Closing TGn Motions
[ Interim Meetings 2006] Date: Authors: July 2005
IEEE WG Status Report – July 2005
IEEE White Space Radio Contribution Title
LB73 Noise and Location Categories
LB73 Noise and Location Categories
WRAN Protocol Reference Model(PRM)
Waveform Generator Source Code
TGu Closing Report Date: Authors: November 2005
[ Considering of Intra-cell multiple CBP response]
March 2014 Election Results
TGp Closing Report Date: Authors: July 2007 Month Year
Attendance and Documentation for the March 2007 Plenary
Attendance and Documentation for the March 2007 Plenary
[ Policies and Procedure Summary]
[ Policies and Procedure Summary]
Effect of FCH repetition on the detection of FCH and MAP
3GPP liaison report May 2006 May 2006 Date: Authors:
Motion to accept Draft p 2.0
3GPP liaison report July 2006
[place presentation subject title text here]
(Presentation name) For (Name of group) (Presenter’s name,title)
Fractional Bandwidth Usage
TGp Motions Date: Authors: November 2005 Month Year
On Coexistence Mechanisms
WRAN Protocol Reference Model(PRM)
TGu-changes-from-d0-02-to-d0-03
TGp Closing Report Date: Authors: May 2007 Month Year
IEEE WG Opening Report – March 2007
November Opening Report
On Coexistence Mechanisms
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGv Redline D0.06 Insert and Deletion
Experimental DTV Sensor
IEEE WG Opening Report – July 2008
TGu Timeline Date: Authors: July 2005 July 2005
IEEE P Wireless RANs Date:
IEEE P Wireless RANs Date:
Spectrum Sensing Tiger Team
TGu-changes-from-d0-01-to-d0-02
LB73 Noise and Location Categories
TGy draft 2.0 with changebars from draft 1.0
TGv Redline D0.10 Insert and Deletion
IEEE WG Opening Report – July 2007
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Redline of draft P802.11w D2.2 Date: Authors:
Annex on TG1 detection for draft
TGr Proposed Draft Revision Notice
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
Liaison Report From Date: Authors: Month Year
Beamforming and Link Adaptation Motions
[ Policies and Procedure Summary]
Draft P802.11s D1.03 WordConversion
Questions to the Contention-based Protocol (CBP) Study Group
Motion to go to Letter Ballot
EC Motions – July 2005 Plenary
TGu-changes-from-d0-04-to-d0-05
TGu-changes-from-d0-03-to-d0-04
TGu Timeline Date: Authors: January 2005 January 2005
TGu Motions Date: Authors: May 2006 May 2006
WNG SC Closing Report Date: Authors: November 2005
TGu Timeline Date: Authors: May 2005 May 2005
TGu Timeline Date: Authors: July 2005 July 2005
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
TGu Timeline Date: Authors: July 2005 July 2005
TGr Proposed Draft Revision Notice
TGp Motions Date: Authors: January 2006 Month Year
Presentation transcript:

STC with CSI feedback IEEE P802.11 Wireless LANs Date: 2006-11-14 July 2006 doc.: IEEE 802.22-06/xxxxr0 November 2006 STC with CSI feedback IEEE P802.11 Wireless LANs Date: 2006-11-14 Authors: Notice: This document has been prepared to assist IEEE 802.22. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.22. Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures http://standards.ieee.org/guides/bylaws/sb-bylaws.pdf including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair Carl R. Stevenson as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE 802.22 Working Group. If you have questions, contact the IEEE Patent Committee Administrator at patcom@iee.org. > Yuli YANG, Huawei Technologies Baowei Ji, Samsung

July 2006 doc.: IEEE 802.22-06/xxxxr0 November 2006 Abstract This document proposes a new STC scheme with the CSI feedback, which can obtain better BER performance and higher transmission rate than the traditional STBC system. Yuli YANG, Huawei Technologies Baowei Ji, Samsung

Motivation CSI can be known at the transmitter November 2006 Motivation CSI can be known at the transmitter Improved SNR by the use of CSI at the transmitter For the complex input signals, the STBC scheme’ s data rate is LOW with more than two transmit antennas Yuli YANG, Huawei Technologies

Traditional STBC STTD for two transmit antennas November 2006 Received Signals Combined signals Yuli YANG, Huawei Technologies

Traditional STBC STBC for four transmit antennas Transmission matrix November 2006 Traditional STBC STBC for four transmit antennas Transmission matrix for real input signals for complex input signals Yuli YANG, Huawei Technologies

Proposed STBC Scheme Transmission matrix Received Signals November 2006 Proposed STBC Scheme Transmission matrix Received Signals Combined Signals Yuli YANG, Huawei Technologies

Proposed STBC Scheme Scheme for two transmit antennas November 2006 Transmission matrix Received Signals Combined signals Yuli YANG, Huawei Technologies

Proposed STBC Scheme Transmission matrix for four transmit antennas November 2006 Proposed STBC Scheme Transmission matrix for four transmit antennas Decoding matrix for four transmit antennas Yuli YANG, Huawei Technologies

Proposed STBC Scheme Transmission matrix for 8 transmit antennas November 2006 Proposed STBC Scheme Transmission matrix for 8 transmit antennas Decoding matrix for 8 transmit antennas Yuli YANG, Huawei Technologies

SNR comparation Traditional scheme Proposed scheme November 2006 Yuli YANG, Huawei Technologies

Simulation Results on System Bit Error Rate ( BER ) November 2006 Simulation Results on System Bit Error Rate ( BER ) Yuli YANG, Huawei Technologies

Conclusions By the use of CSI at transmitter November 2006 Conclusions By the use of CSI at transmitter Form the maximum ratio transmission Improve system BER performance. Increase data rate in the system with more than two transmit antennas Yuli YANG, Huawei Technologies