Medical Gas Rail
Medical Gas Rail Rail is a surface mounted extruded aluminum gas and electric service delivery system designed to optimize flexibility, expandability and adaptability. Flexible and Efficient Reduce Construction Cost Eliminate Life Cycle Costs Reduce Future Risk
Flexible and Efficient Nexxspan™ Gas and Electric Rail has up and down lighting and integrated equipment management for continuity of mounting equipment and expanding essential services on demand. Equipment Rail Integrated into the design Integrated up and down lighting
Reduce Construction Costs with Single Point Connections Medical Gas and Electrical Connections
Reduce Construction Costs It takes 40 sweat joints for 8 gasses 5 per gas on average when installing traditional in wall outlets
Reduce Construction Costs Which do you think is more cost effective and highly efficient in reducing time of construction costs and general conditions? Conventional Gas and Electrical Rough-in Gas and Electrical Rough-in
Eliminate Life Cycle Costs At All Children’s Hospital, the patient rooms were designed for current needs, and planned for future use as an Intensive Care environment. Coupler (blanks) plugs provide gas connections which may be “activated” without re-certification of med gases at any time in the FUTURE-PROOF YOUR FACILITY Active outlets O-V-A Blanks A-V-V O-blank O-A ER Exam Room – All Children’s Hospital, St. Petersburg, FL
Piping for Traditional in Wall Outs Reduce Risks Minimal behind the wall pipes Piping for the Medical Gas & Electric Rail Piping for Traditional in Wall Outs
Installation Pictures York Specialty Hosp, PA
Installation Pictures Coney Island, NY, ED
Installation Pictures All Children’s, St Petersburg, FL
Installation Note Medical Gas and Electrical Rail can be installed over architectural feature as shown in previous slide.
Medical Gas and Electric Rail Installation Steps Electrical service connected to junctions boxes Medical Gas Rail Rough-ins installed with Heavy duty rail backer Gas connection through R-I
Medical Gas and Electric Rail Installation Steps Gas feeder & Electrical after Drywall
Medical Gas and Electric Rail Installation Steps The Gas Rail is placed at the specified height per submittal documents and then secured to the backer plat through the drywall with ¼” self tapping sheet metal screws
Medical Gas and Electric Rail Installation Steps Gas stub out connect to Medical Gas Rail pipes
Medical Gas and Electric Rail Installation Steps Electrical wires should be pulled clear of the gas Rail section both above in the J-Boxes and below at the light rough-in
Medical Gas and Electric Rail Installation Steps The electrical raceway is then placed on top of the gas rail and also screwed in to the backer plate. Insert light bulbs and make final connections behind the center electrical panel
Medical Gas and Electric Rail Installation Steps The NEW Nexxspan Gas Rail as installed at the United States Air Force Academy in the Ambulatory Surgery Recovery area. Note the over bed light also provided by Nexxspan.
Medical Gas and Electric Rail Installation Steps York – WellSpan Health – York, PA Patient Rooms