MOD 326 – Allocation of Unidentified Gas Following the Appointment of the AUGE August 2010.

Slides:



Advertisements
Similar presentations
Review of UNC Section Q “Emergencies” Steve Pownall Transmission Workstream.
Advertisements

Third Energy Package for Change of Supplier 2009/73/EC.
1 Project Nexus Modelling costs and benefits Andrew Wallace, Cesar Coelho Ofgem Project Nexus IA Subgroup 25 July 2012.
Individual Meter Point Reconciliation. What? Calculation of actual energy used at meter point level for all supply points Allow sites to be accurately.
NTS Exit (Flat) Capacity Charges – Credit Arrangements (UNC TPD V3.3.4) Simon Trivella – 14 th January 2009 Distribution Workstream.
Mod 232 Anna Taylor Pricing Manager. 1 Mod 232 An alternative methodology for allocating unidentified energy Currently allocated by RbD entirely in SSP.
Proposal to Change the UNC AQ ‘Backstop Date’ to accommodate the 2010 Seasonal Normal Review DESC – 2nd October 2009 NOTE: Instances where TBC is stated.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
ScottishPower, Energy Retail Gas Long Term Vacant (LTV) Proposal January 2010 Elaine Carr ScottishPower.
1 Project Nexus Market Differentiation Topic Workgroup 14 th & 15 th July 2009.
Future Funding Allocation for Change Development  Action came about during discussions on BSC panel  The analysis of change and development of potential.
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
MOD506 – Gas Performance Assurance Framework and Governance Arrangements.
1 Mod Review Group 126 Feb 07 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
1 To re-define the Aggregate Reconciliation Period to reflect the period to which the charge relates.
1 Mod Review Group 126 Mar 2007 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
1 Mod Review Group 126 Apr 2007 slides 126 Review Group – Restriction of Invoice Billing Period  These slides describe the business rules for the treatment.
ScottishPower, Energy Retail MOD 282 – Introduction of a process to manage Long Term Vacant Sites May 2010 Elaine Carr ScottishPower.
UNCC 11 November 2013 Request for Clarification on AUG Rules Fiona Cottam.
Allocation of Unidentified Gas Statement – Interim Report findings 17 th September 2012.
PN UNC 4 th September 2012 Reconciliation Issues (Action: NEX06/02)
ALLOCATION OF RbD ACROSS RELEVANT PERIOD DNOs’ comments on previous Workstream discussion ALLOCATION OF RbD ACROSS RELEVANT PERIOD DNOs’ comments on previous.
Development Workgroup 0282 Action 018 – impact on RbD 13 September 2010.
DNPC08 Review of Standard LDZ System Charges Consultation Responses 25 October 2010.
Performance Assurance 21st May Incentives. USRV’s – Incentive Regime Charges are based on a range of standards USRV Period runs from 21 st of one month.
PN UNC Workgroup Settlement Issues 1 st November 2011.
CONFIDENTIAL - Mod Initial Business Rules © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
ScottishPower, Energy Retail Gas Long Term Vacant (LTV) Proposal February 2010 Karen Kennedy ScottishPower.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Industry Dialogue on xoserve Services 14 th September 2007.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Review of the UNC Post-emergency Claims Arrangements Strawman February 2009.
1 Modification 0152V Implementation Matters 25 October 2007.
IGT and Shipper Workgroup meeting 28 th February 2011.
Supply Point Register 7th December 2011
Supply Point Register 21st November 2011
Supply Point Register 10th January 2012
UNC Modification Proposal 0202 National Grid Distribution
RBD NOTIFICATION PROCESS
Introduction of Code Contingency Guidelines Document
MOD570 Obligation on Shippers to provide at least one valid meter reading per meter point into settlement once per annum 25th February 2016 Angela Love.
Review Group 178 SSP as Domestic only.
NTS Entry Charging Review Update
Modification th July 2008.
Part B Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
MOD_23_18 Payment and Invoice Day Exchange Rates for Part A Currency Cost Calculations Post Cutover 16th August 2018.
CSEPs Reconciliation Proposals
The Necessary Criteria for a UNC Modification Proposal
Project Nexus Workgroup
UNC Modification Proposal 0385 Inclusion of DNOs as Users in User Pays Arrangements Phil Lucas 7 June 2011.
Introduction of Code Contingency Guidelines Document
Gas Long Term Vacant (LTV) Proposal April 2010
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
Genuine Reconciliation
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
MOD 640 INVOICING VALIDATION RULES
Modification 421 – Updates and Benefits Case
Project Nexus Workgroup
Modification Proposal 136
Correction to No Load Cost - “and” vs “or”
Dis 1208: Mod The ability and requirement for Users and Transporters to raise issues to be considered by the Allocation of Unidentified Gas Expert.
REVIEW GROUP 178 – AN ALTERNATE SOLUTION
Erika Melén, Senior Settlements Analyst Modification Proposal 141a
Presentation transcript:

MOD 326 – Allocation of Unidentified Gas Following the Appointment of the AUGE August 2010

Gas Settlements, Energy Retail 2 Reasons Behind MOD326 Proposal The AUGE Application Date is from 1 st April 2011 The Shippers/Suppliers in the LSP market have known about the future exposure to unidentified since at least 2007, and that they would face additional costs once the AUGE is established ScottishPower therefore believes that it is appropriate that the AUGE should be able to identify issues and re-allocate unidentified gas costs associated with them over the period to which they relate, with a backstop earliest date of the AUGE Application Date (1 st April 2011) However we do believe that the exposure should not be open-ended and therefore propose that the application date should roll forward in line with existing invoicing rules LSP Suppliers have had more than ample time to address the risks associated with unidentified gas in their contracts with customers and therefore should be able to recover costs MOD 326 recognises that it is unacceptable that the RbD market, and mainly domestic customers, should be exposed to any unidentified gas that is related to industrial and commercial usage

Gas Settlements, Energy Retail Key Points 3 It seems highly inappropriate that the AUGE identifies an issue, which finds a portion of the unidentified gas related to the LSP market, but cannot apportion it over the full period to which it relates In particular this is an issue, as the SSP market has exposure through RbD to the whole period – therefore if the AUGE cannot apportion over the whole period the SSP market is still being treated inequitably in relation to unidentified gas

Gas Settlements, Energy Retail How it Works in Practice The AUGE will set out the methodology to be used in apportioning unidentified gas between LSP and SSP markets in relation to issues it identifies Invoicing for the apportioning of unidentified gas will follow the protocol agreed and established under MOD229 (TPD Section E – 10.5), but obviously in some cases the number of days will be greater than 365: invoicing will be payable by way of adjustment in respect of the aggregate User Aggregate Reconciliation Clearing Values, and shall be invoiced at the same time or as soon as practicable after the Invoice in respect of the Aggregate NDM Reconciliation, and payable in accordance with TPD Section S There is no prospective nature to this MOD - it is anticipated that the AUGE methodology will address the problem of any issues that remain unresolved and how these will be treated in relation to unallocated gas in the future

Gas Settlements, Energy Retail Other Things to Note The process of identifying issues that will factor through the AUGE process will be set out in the AUG methodology (TPD Section E ) ScottishPower will be bringing forward a modification to also allow Users and Transporters to raise issues and put a requirement on them to do so We do not believe that MOD326 presents any invoicing issues and note that at August MOD Panel discussion on MOD327, it was suggested that how reconciliation was envisaged to work was an implementation issue We believe that the definition of MOD326 reconciliation should be treated in the same way as proposed in MOD327 and addressed in implementation

Gas Settlements, Energy Retail Summary 6 MOD326 is seeking a more equitable treatment of unidentified gas and ensuring that the LSP and SSP markets face the same risk As MOD326 picks up on MOD229 functionality and is similar to MOD327/317/317A we do not believe further development is required and believe that the Workstream should refer the proposal back to the Panel 6