LEADER Task 3.3 ALFRED - Primary Cover Gas System (PCGS) L. Mansani, M. Bruzzone, V. Pierantoni Karlsruhe, November 20 th, 2012.

Slides:



Advertisements
Similar presentations
PressureGuard Module One - Introduction.
Advertisements

©2006 Armstrong International, Inc. Things We Can Do.
! Nuclear Fission 23592U + 10n ► 9037Rb Cs + 210n
HVAC UNIT : LOCALISATION IN VEHICULE
Unit B: Safety in Agricultural Mechanics
FUEL SUPPLY SYSTEM.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Pneumatic Principles.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
1. Name the particles in the atom and give the charges associated with each.
Year 6 mental test 5 second questions
A case history of CFD support to Accelerator Driven System plant
World Health Organization
ACTIVE LEARNING PROCESS
Air Conditioning EPA Type III.
BLR’s Safety Training Presentations
Supplementary Training Modules on Good Manufacturing Practice
ITER Tokamak Cooling Water System Fusion Power Symposium Washington, DC Tom Coleman AREVA Federal Services December 15, 2011.
EGR 334 Thermodynamics Chapter 12: Sections 5-7
Generic Pressurized Water Reactor (PWR): Safety Systems Overview
Power Plant Construction and QA/QC Section 2.3– Steam Generators
Welcome to the Presentation of Plasma Based HNO3 Manufacturing Plant
1 POLYGENERATION OF ELECTRICITY, HEAT and ULTRA PURE WATER for SEMICONDUCTOR INDUSTRY Chuanfeng Liu Supervisors: Andrew Martin EGI KTH Aapo Sääsk Xzero.
Inert Gas Purification Systems
Eleven Gas Elements Chemistry 1 Tenth Grade By: Taylor Welliver.
Module 9 Confined Space.
Chemical Systems and Equilibrium
REFRIGERATION Refrigeration may be defined as the process of removing heat from a substance under controlled conditions and reducing and maintaining the.
1 PRELIMINARY FINDINGS AND REPORTS RELATIVE TO STUDY OF MARTINSVILLE REVERSION FROM A CITY TO A TOWN.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Neutron Physics and Reactor.
Addition 1’s to 20.
25 seconds left…...
Week 1.
We will resume in: 25 Minutes.
Chapter 13 Gas Mixtures Study Guide in PowerPoint to accompany Thermodynamics: An Engineering Approach, 5th edition by Yunus A. Çengel and Michael.
Lecture 36 Combustion Reactions.
Inert Gas Purification Systems Why do we need them??? Many of the materials used in research and development today are extremely air sensitive, and can.
Primary Water Chemistry
Lesson 18 - Decay Heat DEFINE the term decay heat. Given the operating conditions of a reactor core and the necessary formulas, CALCULATE the core decay.
Issues Associated with the Development of Severe Accident Management Guidelines for CANDU Reactors Keith Dinnie Director, Risk Management Nuclear Safety.
Microwave Soil Vapor Treatment CHA Corporation Field DemonstrationWINTER 2004 CHA Corporation 372 W. Lyon Laramie, WY Telephone:(307) Fax:(307)
EUROTRANS: WP1.5 Technical meeting, Karlsruhe, November 27 – 28, XT-ADS DHR Conceptual Design L. Mansani
Efficient Pigging of Gathering Lines
EUROTRANS - Helium cooled EFIT Probabilistic assessment of different DHR designs Karlsruhe, November Sophie EHSTER, Laurent VINCON.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
NUCLEAR POWER PLANT. NUCLEAR FUEL  Nuclear fuel is any material that can be consumed to derive nuclear energy. The most common type of nuclear fuel is.
NUCLEAR SAFETY Barbora Svobodová Angličtina-odborná II.
HEAT PIPE HEAT EXCHANGERS
Nuclear Fundamentals Part II Harnessing the Power of the Atom.
23.4 Nuclear energy NUCLEARNUCLEAR POWERPOWER Millstone Station.
23.4 Nuclear energy NUCLEARNUCLEAR POWERPOWER Millstone Station.
Types of reactors.
LEADER WP3 Conceptual Design Status KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, Luigi Mansani
Kevin Burgee Janiqua Melton Alexander Basterash
,Yalta,17-th Symposium of AER1 IMPACT OF CHANGED FUEL PERFORMANCES ON SAFETY BARRIER EFFECTIVENESS AT NORMAL OPERATION OF NPP WITH VVER A.V.
1. In combined cycle power plant (CCPP), the Brayton cycle & Rankine cycles are combined. 2.
LEADER WP3 Conceptual Design Status KIT Campus North, Karlsruhe, Luigi Mansani
Natural Convection as a Passive Safety Design in Nuclear Reactors
A seminar on Practical Training taken at KOTA SUPER THERMAL POWER STATION.
Nuclear fission Nuclear fission: heavy nuclei split into two smaller parts in order to become more stable proton neutron Kr-90 nucleus U-235 nucleus energy.
Controlling Nuclear Fission. Thermal neutrons Uranium 235 is the main fissile material which we are concerned with. Uranium-233 and plutonium-239 can.
Nuclear Battery Battery.  Reactor –Core Metallic fuel core (U-10%Zr) –Reactivity control Movable reflectors –Shutdown system Shutdown rod and reflectors.
Microwave Soil Vapor Treatment
Fluid Statics/Dynamics
NUCLEAR POWER PLANT.
Nuclear (Atomic) Power Plant
Session Name: Lessons Learned from Mega Projects
Presentation transcript:

LEADER Task 3.3 ALFRED - Primary Cover Gas System (PCGS) L. Mansani, M. Bruzzone, V. Pierantoni Karlsruhe, November 20 th, 2012

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, TABLE OF CONTENTS 1.System Functions Safety-Related FunctionsSafety-Related Functions Non-Safety Related FunctionsNon-Safety Related Functions 2.Cover Gas Composition 3.Primary Cover Gas System Design Configuration System Configuration RequirementsSystem Configuration Requirements System ConfigurationSystem Configuration 4.System Alignments Normal Plant OperationNormal Plant Operation Plant Shutdown before MaintenancePlant Shutdown before Maintenance Nitrogen Purge and Argon RecoveryNitrogen Purge and Argon Recovery TABLE OF CONTENTS

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, PRIMARY COVER GAS SYSTEM FUNCTIONS 3

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, PRIMARY COVER GAS SYSTEM FUNCTIONS 4 Non-Safety Related Functions Contribute to maintain the integrity of the Primary Boundary during all plant conditions Primary Boundary Integrity Molten Primary Coolant Inertization Maintain and control a slight argon underpressure in the primary cover gas volume and keep up the required inertization status of the molten primary coolant Safety Related Functions

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, PRIMARY COVER GAS SYSTEM FUNCTIONS 5 Non-Safety Related Functions (cont.) Nitrogen Purge & Argon Recovery To purge the nitrogen flowing from Reactor Hall into the Reactor Vessel during maintenance, restore the argon atmosphere and re-establish underpressure conditions inside the Reactor Vessel before every startup Containment of Radioactive Releases To maintain the radioactive releases to the Reactor Hall below the design limits by providing the mean for purification of the primary cover gas bulk mass

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, PRIMARY COVER GAS SYSTEM FUNCTIONS 6 Primary Heat Exchanger Leakage Detection Timely to detect a small leak of the primary heat exchanger and provide the way to condense and collect vapor and trap the radionuclides entrained by the vapor stream Fuel Cladding Failure Detection To detect failure in fuel assemblies cladding by monitoring increased primary cover gas activity originated by fission products circulating in the primary coolant Non-Safety Related Functions (cont.)

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, PRIMARY COVER GAS COMPOSITION

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, From EUROTRANS: the volatility of all the investigated elements (Po, Cs, Sr and I) is depressed, typically by several orders of magnitude, through strong chemical interaction with the heavy metal coolant. The strong retention of fission products constitutes a considerable advantage with lead and LBE coolants. In lead coolant (EFIT) the production of 210 Po is about three orders of magnitude smaller, and the amounts of volatilized 210 Po are correspondingly lower. In both XT­ADS and EFIT, volatilization of 90 Sr is completely negligible. Molar fraction passed to the gas phase 2.PRIMARY COVER GAS COMPOSITION

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, The activity in the Cover Gas comes from a fraction of the radionuclides present in the primary lead coolant that have vaporized into the gas phase The radionuclides in the primary lead have two different sources: – The activation products resulting from the coolant interaction with the neutrons – The activity released from the damaged fuel rods in case of fuel damage Due to the retention property of Lead the more significant radionuclides present in the Cover Gas are Noble Gases and Tritium Ne 235,54E-11 Ne 244,83E-18 Ar 394,69E-05 Ar 419,89E-12 Ar 421,20E-10 Ar 432,06E-15 Ar 454,25E-17 Xe1271,21E-15 Xe129m3,75E-13 Kr 815,92E-13 Preliminary activation product evaluation –Noble Gases composition after 40 years (grams) 2.PRIMARY COVER GAS COMPOSITION

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, PRIMARY COVER GAS SYSTEM CONFIGURATION 10

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, PCGS CONFIGURATION 11 Provision of two (2) piping penetrations on the Reactor Cover for PCGS gas extraction and return flow Comply with Reactor Cover penetration Layout Minimize the chances of preferential gas streams capable of bypass the circulation of the RV ceiling System Configuration Requirements Provision of buffer tank to compensate passively for gas pressure variation due to LBE temperature transients Provision of a blowers station with the performances required by the PCGS purification function to force recirculation of the Reactor Vessel ceiling through the filtration banks

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, PCGS CONFIGURATION 12 System Configuration Requirements Provision of an electrical heater in the blowers station discharge pipe to increase the gas temperature back to the current Reactor Vessel ceiling temperature, during primary cover gas recirculation and purification Provision of an argon storage tank to store and supply the amount of argon necessary to recover the primary cover gas for normal operation of the PCGS Provision of a argon supply electrical heater to support argon heat up from low temperature to a temperature high enough to prevent LBE from experiencing thermal shocks during plant startup conditions recovery via nitrogen purge and argon flushing operation Provision of a single blower to purge the nitrogen flowing from Reactor Hall into the Reactor Vessel after maintenance, restoring the argon atmosphere and re-establishing underpressure conditions inside the Reactor Vessel before every start-up

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, PCGS CONFIGURATION 13 System Configuration Requirements Provision of an HIGH temperature and a LOW temperature gas coolers to reduce the primary cover gas temperature to suitable values for purification Provision of a fine-dust filter and an HEPA filters bank for removal of remaining fines post purification upstream of the blowers station suction Provision of activated carbon beds to temporary entertain Xenon and Krypton, allowing that delay period significantly reduces the radioactivity of the gas flow leaving this section Provision of a Tritium treatment station to collect tritium released in the primary cover gas

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, SYSTEM ALIGNMENTS

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, SYSTEM ALIGNMENTS 15 Normal Plant Operation

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, SYSTEM ALIGNMENTS 16 Before Maintenance

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, SYSTEM ALIGNMENTS 17 Nitrogen Purge and Argon Recovery

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, Thank you for your attention