Methane Gas in Coal Mining SA June 18 – 21, 2012 Barry Stevens, Ph.D. President TBD America, a Technology Business Development consulting group 2011.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

GAS EXCHANGES IN SPAIN 5th IG Meeting of South Gas Regional Initiative 30th November, 2007.
PROCESS SELECTION Chapter 4.
10-1 McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 4 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
1 "Isky Enviroearth System presentsIsky Enviroearth The Future of energy.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
ABENGOA SOLAR Solar Power for a Sustainable World Past, Present, and Future of Solar Thermal Generation Bruce Kelly Abengoa Solar, Incorporated Berkeley,
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
1 Introduction to Transportation Systems. 2 PART I: CONTEXT, CONCEPTS AND CHARACTERIZATI ON.
- legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
This presentation includes forward-looking statements. Actual future conditions (including economic conditions, energy demand, and energy supply) could.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Introduction to Sustainable Solutions
FPSC Ten Year Plan Workshop Nuclear Panel Steven Scroggs Senior Director, Project Development Florida Power & Light Company August 15, 2007.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
ZMQS ZMQS
Valuation of Natural Gas in Salt Cavern Storage Facilities
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
MA Metal Finishing Forum Tools and Techniques for Optimizing Metal Finishing Process/Environmental MA Metal Finishing Forum Kevin L. Klink, P.E.
Prepared By: A.M. Al-Ashwal Project Advisor OFF GRID 1.
Indonesia’s current account challenge
1 6/20/13 June 20, 2013 Mac McLennan President and CEO Minnkota Power Cooperative Generation Choices.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
Capacity Planning For Products and Services
Canada Committed to a Nuclear Future Presented to the 15 th Pacific Basin Nuclear Conference by Milton Caplan President, MZConsulting Inc October.
The emerging skills shortage in the minerals industry - potential constraints on future sustainable development John Thompson.
Steve Baker President Natural Gas in Ontarios Energy Mix Seeing The Bigger Picture.
© S Haughton more than 3?
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
First Solar FuelSmart™: Powering Energy Security
New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.
2 Our Global Economy 2-1 Economics and Decision Making
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Adapting to a Changing Energy Environment Russ Girling, President and CEO, TransCanada Corporation May 15, 2012 STRIKING A BALANCE IN THE MIDST OF CHANGE.
Addition 1’s to 20.
25 seconds left…...
Importance of Effective Sand Management - DTI View Colin Cranfield Reservoir Engineer Licensing & Consents Unit, Aberdeen.
Test B, 100 Subtraction Facts
Week 1.
We will resume in: 25 Minutes.
1 Unit 1 Kinematics Chapter 1 Day
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
© 2011 Underwriters Laboratories Inc. Emerging Implications of DC Power & Energy Storage Ken Boyce NFPA Alternative Energy Technologies and Electrical.
B9 Coal Deploying Fuel Cells to Generate Cheap, Clean Electricity from Fossil Fuels.
Reducing the Threat of Fuel Release from the Red Hill Fuel Storage Facility A Unique Engineering Challenge.
Implications of Greater Reliance on Natural Gas for Electricity Generation 1.
GSE - Gas Storage Europe1 GSE Investment Workshop “ Physical specificities of gas storage” Brussels, 24 May 2007.
Underground Natural Gas Storage: ensuring a secure and flexible gas supply Jean-Marc Leroy GSE President Gas Coordination Group - 13 January 2010.
Compressed Air Energy Storage (CAES) Wind Integration Study Team September 10, 2009.
September 25, 2001 Maryland Public Service Commission Retail Gas Market Conference Timothy S. Sherwood Department Head, Energy Acquisition.
Earth Energy Advisors Monthly Energy Report
Presentation transcript:

Methane Gas in Coal Mining SA June 18 – 21, 2012 Barry Stevens, Ph.D. President TBD America, a Technology Business Development consulting group 2011 TBD America

NATURAL GAS Low natural gas prices are lifting the U.S. economy even as many people are asking questions about its environmental impact. "Natural gas is revitalizing America's steel industry, reinvigorating its petrochemical industry and benefiting heavy-equipment makers. …. Keith Hutton, CEO, XTO 2011 TBD America 2

3 WHY STORAGE Reliability Meet Load Variations Efficiency

SECONDARY 2011 TBD America 4 Operational Integrity Maintaining Contractual Balance Unforeseen Accidents & Disasters Regulatory Obligations Reducing Price Volatility Market Speculations

THE 2011 TBD America 5

THE MARKET Regulated Market Deregulated 2011 TBD America 6

OPERATING CHARACTERISTICS Total Gas Storage Capacity Base / Cushion Gas Working / Top Gas Deliverability Injection Capacity / Rate 2011 TBD America 7

HOW THEY 2011 TBD America 8

UNDERGROUND Depleted Gas Reservoirs Aquifer Reservoirs Salt 2011 TBD America 9

Disadvantages Low Deliverability & Injection Rates One Yearly Injection/Withdrawal Cycle High Base Gas Requirement Costly Reconstruction & Maintenance DEPLETED GAS RESERVOIRS Advantages Lowest Cost Existing Pipeline Connections Existing Wells & Surface Facilities Well Characterized Geology Utilization of Indigenous 2011 TBD America 10

Advantages Enables gas storage development in locations where hydrocarbon reservoirs are not readily available or suitable for natural gas storage Disadvantages Highest Capital Cost High Cushion Gas Requirement ( 50 % to 80 %) Maintaining Integrity of Gas/Water Interface Infrastructure Not Developed Poor Retention Capabilities Environmental Restrictions 2011 TBD America 11

SALT CAVERNS Disadvantages High Capital Cost Environmental Issues - Brine Disposal Volume of Each Cavern has Practical & Geological Limitations Periodic Service Disruptions - Government Mandated Inspections High Operating Cost Due To Corrosive 2011 TBD America 12 Advantages Very Low Base Gas Requirements Highest Deliverability Highest Injection Rates High Cycling Characteristics Multiple Cycles Reduces Unit Cost of Gas Injected & Withdrawn

ABOVE 2011 TBD America 13 Liquefied Natural Gas (LNG) Tank Farms Line Packing

High Volumetric Efficiency Costs Going Down Supports Stranded Gas Deposits 2011 TBD America 14

DEVELOPMENT 2011 TBD America 15

CHALLENGES Management & Control Industry & Market Demands Regulatory Hurdles Location 2011 TBD America 16

TBD America 17

SUMMARY Efficiency & Reliability Needs Capacity & Deliverability Driven Geographic & Economic Dependency Commodity Price 2011 TBD America 18

Barry Stevens, PhD President TBD America, Inc. THANK 2011 TBD America 19