In service monitoring Near miss logging Continuous improvement

Slides:



Advertisements
Similar presentations
ENAV S.p.A. ASAS TN I Workshop, April 20031/13 Airborne Spacing and Safety Alberto Pasquini - Deep Blue (ENAV)
Advertisements

Lecture 8: Testing, Verification and Validation
© Ricardo plc 2012 Eric Chan, Ricardo UK Ltd 21 st October 2012 SARTRE Demonstration System The research leading to these results.
VoIP: Full Lifecycle Management Russell M. Elsner APM Technology Director OPNET Technologies, Inc.
Stephen D’Angelo Orun Irunmale Bart Jedrocha.  Create a realistic driving simulator suitable for performing psychology experiments by interfacing with.
Real-Time Systems – The Big Picture Real-Time Systems Anders P. Ravn Aalborg University September 2009.
Real-Time Systems – The big Picture
Measuring and Managing Operational Risk. 2 Assessing Operational Risk Exposure Required Process of Continuous Risk Assessment, Monitoring and Reporting.
Equipment Capability Customer DAES Analysis-Experimentation-Simulation 1 DARP Workshop System of Systems Safety Cases Parallel Session 18 th & 19 th April.
ETSC Best in Europe Conference 2006 Changing Human Machine Interfaces Towards the development of a testing regime Samantha Jamson University of Leeds.
Michigan VII: Technology Improving Lives ITS Midwest Annual Meeting February 7, 2006 Gregory D. Krueger, P.E. Statewide ITS Program Manager Michigan Department.
Modeling Framework Generally modeling framework is made up of the following components: A set of biophysical modules that simulate biological and physical.
ROAD TRANSPORT RESEARCH, TECHNOLOGICAL DEVELOPMENT AND INTEGRATION (2003 Call)
© Brammertz Consulting, 20091Date: Unified Financial Analysis Risk & Finance Lab Chapter 12: Operational risk Willi Brammertz / Ioannis Akkizidis.
Security Architecture
ITER – Interlocks Luis Fernandez December 2014 Central Interlock System CIS v0.
Risk Management. IT Controls Risk management process Risk management process IT controls IT controls IT Governance Frameworks IT Governance Frameworks.
Developing Structured Activity Tools. Aligning assessment methods and tools Often used where real work evidence not available / observable Method: Structured.
Name, department/event, date
Demo eMDSS E-Maintenance Decision Support System.
J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan The current qualification and verification.
Database Security and Auditing: Protecting Data Integrity and Accessibility Chapter 1 Security Architecture.
Knowing What You Missed Forensic Techniques for Investigating Network Traffic.
Aviation Safety Program IVHM Research Aviation Safety Program IVHM Research Aviation Safety Program (AvSAFE) Integrated Vehicle Health Management (IVHM)
Threat and OE Scalable FSO Dynamic Integrated Training Environment Spans all domains Includes Common Training Database and scenarios Future Training Concept:
Before1S Video Viewing Quiz ReviewRed Tag & Red Tag Logging Insights Meeting Zone 01 1S – Ibn Batuta Mall Do QuizSorting Activity Event Overview Meeting.
Michigan VII: Technology Improving Lives Safety Summit Lansing, MI February 28, 2006 Gregory D. Krueger ITS Program Manager Michigan Department of Transportation.
Database Security and Auditing: Protecting Data Integrity and Accessibility Chapter 1 Security Architecture.
Computer-Controlled Railroad Simulator Adrian Anderson
Assessment and Prediction of Behavioral Simulator Fidelity Round Table Discussion Moderator Erwin R. Boer.
TMALL 0141 Presentation v 1.0 Asset Management Bo Olsson Bucharest October 7th, 2015.
ESA Harwell Robotics & Autonomy Facility Study Workshop Autonomous Software Verification Presented By: Rick Blake.
DeSIRE Workshop, Pisa, 25-26/11/2002 1/7 A Case Study in Air Traffic Control Alberto Pasquini Deep Blue Srl.
Driving Schools in Virginia - Market 200 Driver Training schools Driver Improvement clinics 2 –Average repeat offenders per clinic every year: 32.
Human Factors Progress IDS Project Nicholas Ward Jason Laberge Mick Rakauskas HumanFIRST Program.
The Virtual PWC Facility Tony Andrady Research Triangle Institute Klaus-Peter Beier University of Michigan.
Using Data Collection Tools in Flight Training Kris Rockwell Hybrid Learning Systems AICC Phoenix February, 2004.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Topic: Reliability and Integrity. Reliability refers to the operation of hardware, the design of software, the accuracy of data or the correspondence.
Sicherheitsaspekte beim Betrieb von IT-Systemen Christian Leichtfried, BDE Smart Energy IBM Austria December 2011.
Skills and products portfolio an overview Lorenzo Martinelli – Business Development Contact:
Cascading Failure
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A l Humans smarter, meaner, more strategic, emotional, variable, etc.
A Technical View of Risk Assessment Methods for Backup Systems Bradley Wong Life Sciences Consulting Tustin, CA – USA DIA/All Hands: 12 February 2015.
Transmitted by the Experts of TRL (EC)
PARKING AUTOMATION SYSTEM
Initial project results: Annex 6 – 20 Sept 2016
IEEE Std 1074: Standard for Software Lifecycle
Agenda 1. Introduction 2. Advanced Driver Assistance Systems 3. Problems with ADAS 4. Strategy Analytics 5. Conclusion 6. Q&A.
ASEP IWG Report to GRB 65th
J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan Robustness Diagram Trends and Challenges.
Submitted by OICA Document No. ITS/AD-14-07
High level objectives Overview Proposal for approach
Information Systems General Information.
Conformity of Production (COP)
Submitted by the experts of OICA
K2-Project “TECHAHAD” Deals with: Contributes to:
Submitted by OICA Document No. ITS/AD Rev1
Safety Assessment of Automated Vehicles
New Assessment & Test Methods
SHORT-TERM ACTIVITIES
Report on Automated Vehicle activities
Safety concept for automated driving systems
Transmitted by the Co-Chairs
Information Systems General Information.
Objectives. Objectives Objectives Content Configure Microsoft Azure monitor.
Group 1a: Traffic scenarios
Test track -/real world testing
VMAD Describe in a few sentences what should be the outcome of the ‘audit/virtual testing/in-use data reporting Audit Confirmation that the manufacturers.
© 2017 Global Market Insights, Inc. USA. All Rights Reserved Automotive Simulation Market – Global Industry Forecast & Analysis over
Presentation transcript:

In service monitoring Near miss logging Continuous improvement Transmitted by Group 1 of VMAD IWG VMAD-02-12 Audit Safety concept Control Strategy (environmental conditions/false detection) Functional Requirements Hardware Diagnostics on vehicle Development process (risk assessment) Quality Management Process of OEM Component and Vehicle Consumer Interface & training (HMI Concept) Virtual Testing Scenario database Traffic rules database Hardware in the loop Failure injection Reporting structure of virtual testing Validation methods of simulation – Track and Real World Need to define acceptable deviation Collect data of Real World Drive & test hardware in the loop for validation Need safety margin defined Separate validation/watchdog system Track Testing Testing of edge cases Virtual Testing validation Real World Virtual Testing validation Near miss logging In service monitoring Near miss logging Continuous improvement