Global Trigger and Global Muon Trigger Latency

Slides:



Advertisements
Similar presentations
1 Brevi Notizie dal Commissioning di CMS… November Global Run (GREN): will last 2 weeks: 26 Nov-7 December (Dec Cosmic Run cancelled, Tracker will probably.
Advertisements

Level-1 Trigger CMS Week, Brussels 14 Sep C.-E. Wulz Deputy Trigger Project Manager Institute of High Energy Physics, Vienna Prepared with slides/material.

CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
Manfred Jeitler, HEPHY Vienna Level-1Trigger in 2012 Lisbon, 6 Sep Level-1 Trigger in 2012 Manfred Jeitler HEPHY Vienna -90 kHz rate  - 3% deadtime.
Pg. 346/352 Homework Pg. 352 #6, 8 – 11, 15 – 17, 21, 22, 24, 27, 28, 30 – 32.
Solving Quadratic Equations by Completing the Square
Global Trigger Upgrades for SLHC Vienna, Global Trigger Group A.Taurok, C.-E. Wulz SLHC Workshop, FNAL, 19 Nov
Possible exam questions for the chapter 10 exam. A.1175 in 2 B.1000 in 2 C.65 in 2 D.130 in
Vienna Group Trigger Meeting CERN, 6 Dec Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global.
The Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System D.Acosta, A.Madorsky, B.Scurlock, S.M.Wang University of Florida A.Atamanchuk,
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
The CMS Level-1 Trigger System Dave Newbold, University of Bristol On behalf of the CMS collaboration.
Manfred Jeitler, HEPHY Vienna CMS Level-1 Trigger MGU, 11 July The Level-1 Trigger of the CMS Experiment at LHC Design, challenges and performance.
Vienna Group Trigger Meeting CERN, 18 July 2006 Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global.
14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 1 The First Integration Test of the ATLAS End-cap Muon Level 1 Trigger System Introduction Overview.
DT Track Finder, Global Muon Trigger, Global Trigger H. Bergauer, L. Boldizsar, M. Dallavalle, Ch. Deldicque, J. Erö, L. Guiducci, A. Jeitler, I. Jimenez.
Perimeter of Rectangles
On-line Software Requirements for the Global Trigger, the Global Muon Trigger and the Barrel Muon Trigger Track Finder Claudia-Elisabeth Wulz & HEPHY Vienna.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Global Trigger H. Bergauer, L. Boldizsár, A. Jeitler, P. Hidas, K. Kastner, S. Kostner, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J.
Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Trigger Internal Review CERN, 6 Nov GLOBAL TRIGGER.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
Annual Review Cern -June 13th, 2006 F. Loddo I.N.F.N. Bari RPC Electronics: Technical Trigger Flavio Loddo I.N.F.N. Bari On behalf of the RPC-Trigger group.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Hannes Sakulin CERN Annual Review CERN, 24 Sep Global Trigger Global.
Compact Muon Solenoid Christian Hartl CERN Austrian Doctoral Student June 2009 Institut für Hochenergiephysik, ÖAW CMS Global Trigger Control and Monitoring.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
Implementation and Test of the First- Level Global Muon Trigger of the CMS Experiment Hannes Sakulin 1), 2), Anton Taurok 2) 1) CERN 2) Institute for High.
CMS Latency Review, 13th March 2007CSC Trigger 1 Latency and Synchronization update.
CSC Muon Sorter M. Matveev Rice University January 7, 2003.
Global Muon Trigger / RPC Interface Warsaw and Vienna Groups RPC Electronics System Review Warsaw, 8 July 2003 presented by Claudia-Elisabeth Wulz.
Global Trigger, Global Muon Trigger H. Bergauer, L. Boldizsar, A. Jeitler, P. Hidas, K. Kastner, S. Kostner, N. Neumeister, M. Padrta, P. Porth, H. Rohringer,
13 March 2007G. Rakness (UCLA) 1 RPC efficiency in RAT Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
Electronics Review, May 2001Darin Acosta1 OPTICAL SP 1 Muon Sorter 3  / port card 3  / sector ME1 ME2-ME3 ME4 SR DT TF SP From CSC Port Cards MS MB1.
22 Sept A slight reformulation of (ALCT) muonic timing… In terms of brass tacks.
Trigger Workshop: Greg Iles Feb Optical Global Trigger Interface Card Dual CMC card with Virtex 5 LX110T 16 bidirectional.
L1 Global Muon Trigger Simulation Status URL of this presentation:
Global Trigger, Global Muon Trigger H. Bergauer, Ch. Deldicque, J. Erö, A. Jeitler, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M.
Effects of Endcap Staging/Descoping D.Acosta University of Florida.
Global Trigger Upgrades for SLHC Vienna, Global Trigger Group A.Taurok, C.-E. Wulz SLHC Workshop, FNAL, 19 Nov
21 October 2010 Vasile Mihai Ghete CMS Trigger Research Project HEPHY Scientific Advisory Board.
TWEPP, Prague, Costas Foudas, Imperial College London 1 The CMS Global Calorimeter Trigger Test Results and Commissioning Overview: Brief Description.
Global Trigger Upgrades for SLHC
CMS Trigger Supervisor Framework
TTC signals: Global Trigger and Global Muon Trigger
CMS Trigger Coordinator
Project Group CMS Trigger
Darin Acosta University of Florida
Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager
SLB Synchronization in H4 Beam (LIP - Lisbon)
Regional Cal. Trigger Milestone: Production & Testing Complete
SOLVING QUADRATIC EQUATIONS USING THE FORMULA
Finding the Volume of Irregular Shapes
Optimizing Endcap Navigation
example 6 Female Workers
Timing Bug in CSC Digis Affected both wire and comparator digis
Your valuable input to the Half Double book
Test of Link and Control Boards with LHC like beam, CERN, May 2003
LHCb Electronics Brainstorm
Global Trigger and Global Muon Trigger
Sector Processor Status Report
A, b and c can be any numbers
Global Trigger Finds Correct BX
A, b and c can be any numbers
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
Global Muon Trigger Update
Prepared for CSC by Fred Borcherding FNAL
A, b and c can be any numbers
Presentation transcript:

Global Trigger and Global Muon Trigger Latency 11 November 2005 Anton Taurok / Manfred Jeitler 11 November 2005 Anton Taurok / Manfred Jeitler: GT and GMT latency

Anton Taurok / Manfred Jeitler: GT and GMT latency 9.5 bx 9.5 bx 3 bx* RPC GMT GT 3 bx* CSC 3 bx* DTTF ? bx PSB GCT ? bx PSB 2 bx * estimated, subject to cable length 11 November 2005 Anton Taurok / Manfred Jeitler: GT and GMT latency

Anton Taurok / Manfred Jeitler: GT and GMT latency GMT and GT latency 11 November 2005 Anton Taurok / Manfred Jeitler: GT and GMT latency

Anton Taurok / Manfred Jeitler: GT and GMT latency comments latency has not changed since last review in 2004 overall latency between muon inputs and TTCci is 19 bx add an estimated 3 bx transfer time for muons from RPC, CSC, DTTF see CMS note 2004/022, chapter 5 add transfer time from GCT to GT over ~2-3 m long Infiniband cable 11 November 2005 Anton Taurok / Manfred Jeitler: GT and GMT latency