Alaska LNG Project Concept Information Work Product In Progress Alaska LNG Project Overview Kenai, Alaska January 30, 2014.

Slides:



Advertisements
Similar presentations
Piedmont Improvement Program NC Society of Engineers
Advertisements

Alaska Stand Alone Gas Pipeline
FPSC Ten Year Plan Workshop Nuclear Panel Steven Scroggs Senior Director, Project Development Florida Power & Light Company August 15, 2007.
Proposed Quintette Mine Re-opening February 2011.
Technologies 1 CHP (VA Dallas Case Study). Proprietary Information Of Energy 2013 Dallas VA Medical Center A CHP Case Study Design Build Delivery of a.
Industry Outlook Forum Kenai Peninsula – Opportunities Abound Kenai Nitrogen Operation (KNO) Restart Project.
J2 Regulating Reservoir Project
Integrity Urgency Ownership Alignment Innovation.
DIASPORA HOMES (K) Ltd Providing housing space to eradicate slums By ERNEST KAMAU Tel /5 Nairobi, Kenya.
Alabama Water Resources Conference 2013
Society of Petroleum Engineers ASAP Project Overview January 9, 2014.
2014 Industry Outlook Forum Cook Inlet Energy, LLC Operational Update.
UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
Solutions for Flaring Reduction Dual-Fuel & Gas Engines
Feeder Line Replacement Refresher Questar Gas Company Meeting with Utah PSC March 27, Questar Gas Company Docket No QGC Exhibit 1.10.
Methow Valley Irrigation District Alternatives Evaluation Presented by Bob Montgomery, P.E. and David Rice, P.E. January 31, 2013.
Oil And Gas Development In Iran
CREA Energy Innovations Summit Coal Mine Methane Electric Power Generation 1 Julian Huzyk Project Manager Vessels Coal Gas, Inc. 3MW LLC & North Fork Energy.
1 © 2011 Regents of the University of Minnesota. All rights reserved. 11 A UNIVERSITY OF MINNESOTA EXTENSION LEECH LAKE BAND OF OJIBWE PARTNERSHIP SHIRLEY.
COTES Group. Our Company>>>> Our Team and Resources>>>> References>>>> Engineering of the 21st Century>>>>
April 2010 Flare Gas Monetization Greg Loewen, President & CEO.
Murray River Project Update Coal Forum October 2013.
Coal to Liquids Plant Site Selection in WV Douglas G. Patchen October 25, 2007.
SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department.
PAST, PRESENT AND FUTURE Jason Smith, TERA Environmental Consultants February 20, 2014 Simon Fraser University.
QUALITY MANAGEMENT AGA – BEST PRACTICE ROUNDTABLE Sara Peralta, Director – Quality & Improvement Philadelphia February, 2013.
Presentation on the TAGS Small Project February 2002
Oil and Gas Industry Presentation Activities, GHG Emission Sources, and Potential Reductions January 14, 2009.
B9 Coal Deploying Fuel Cells to Generate Cheap, Clean Electricity from Fossil Fuels.
Floridian Natural Gas Storage Company Martin County, Florida
SMALL SCALE LNG PROSPECTS
Understanding Shale Gas Development From drilling to end user…..
TransCanada Corporation (TSX/NYSE: TRP)
North American Natural Gas Infrastructure Needs Donald F. Santa, Jr. President Interstate Natural Gas Association of America The Independent Petroleum.
Expanding the Twin Ports Energy Cluster to include LNG and CNG Production and Distribution Dr. Richard Stewart, Co-Director-GLMRI May 21, 2014.
Prudhoe Bay LNG By Spectrum LNG,LLC March 1, 2013 Presentation to the Alaska Legislature.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
© 2008 OSIsoft, Inc. | Company Confidential Experiences in Implementation: Stretching PI to Cover Ten Years How NGT&S is Transforming PI System Utilization.
Engineering Technology Division
FERC and the Development of an Alaska Natural Gas Pipeline Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory Commission.
LNG Technology.
Defining the Upstream Oil and Gas Sector: Exploration, Production, and Natural Gas Gathering and Processing Western Climate Initiative – Oil & Gas Collaborative.
Confidential Project Update: District of Chetwynd Bruce Wells, Vice President, Project Development February 02, 2015.
Overview & Status May Joint Team Objectives Create an economic project (competitive cost of supply) Develop sufficient technical information to.
Challenges in Transmission. 2 Environmental and Public Affairs Consulting for the Energy Industry Energy Sectors  Oil & Gas  Pipeline  Storage  LNG.
Joe Bovee, VP Land and Resources, Ahtna Inc. Bruce Cain, Special Projects Manager, Ahtna, Inc. Robert Wilkinson, CEO, Copper Valley Electric Association.
GEOTHERMAL PROJECT COST ESTIMATING By Lorie M. Dilley.
2  Large Service Area ◦ Copper Basin and Valdez  Electrically isolated from neighboring utilities  50% Hydro / 50% Fossil Fuels  Current Rates ◦ 18¢/kWh.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
Izok Corridor Project: Kitikmeot Community Visit
THE NORTH AMERICAN LNG OPPORTUNITY APEGGA, Calgary, Alberta.
Peabody Coal Lower Basin Pipeline Engineering Appraisal Study Bureau of Reclamation September 18, 2002.
Providing Services to the Energy Industry Presentation By EPCM Consultants Pty Ltd EPCM Consultants Pty Ltd Comdain Group.
XP06432_7 Mackenzie Gas Project Next Steps Toward a Mackenzie Valley Natural Gas Pipeline.
Independent, integrated thinking.
1 1 Presenter / date if required Independent, integrated thinking.
Overview & Status for: International Association of Energy Economists Alaska Chapter October 25, 2001 Anchorage, Alaska.
Biomass Cogeneration Facility Savannah River Site Aiken, SC
Preparing for a winter fuel emergency Alaska Journal of Commerce Alaska State Chamber of Commerce.
Compressed Air Energy Storage (CAES) Wind Integration Study Team September 10, 2009.
Alaska Legislature Senate/House Resources & Energy Committees February 2010.
ALASKA GASLINE DEVELOPMENT CORP. | Tel: | Toll-Free: | Fax: | Website: 1 ASAP Project Update Presented.
Denali – The Alaska Gas Pipeline
Project Overview.
Controlling Project Cost and Schedule
Delta Water Supply Project
Overview & Status July 18, 2001.
MMS Offshore Alaska Program
CYnergy Kick-Off Meeting
Post Point Treatment Plant Resource Recovery Project Update
Presentation transcript:

Alaska LNG Project Concept Information Work Product In Progress Alaska LNG Project Overview Kenai, Alaska January 30, 2014

Alaska LNG Project Concept Information Work Product In Progress Alaska LNG Project - Overview Alaska LNG Plant Conceptual Layout BP, ConocoPhillips, ExxonMobil and TransCanada are working together to progress an Alaska LNG project: people involved in project design work - Current work - $70M+ spent to date - Multiple third party contractors engaged – many Alaskan - Leveraging Denali, APP, related material ($700M past work) - Preliminary capital estimate - $45-65 Billion (2011 dollars) Key project design accomplishments to date: - Integrated Basis of Design heat/material balance complete - Confirmed ability to integrate into existing operations - Completed project design, announced concept Feb13 - Finalized lead LNG plant site decision, announced Oct13 Completed 2013 Summer Field Season: - Cultural resource assessment (>6,500 acres) - Hydrology / Lakes / Fisheries studied (37 / 17 / 20) - Traditional knowledge, subsistence, ethnographic surveys people involved Key project issues to address: - Mega-project challenges (labor, resources, equipment, etc.) - Uncertainty related to permit timing / scope - Commercial and fiscal issues with all parties, including the State of Alaska Results of URS ArcGIS Location Suitability Screening Study Lead LNG Plant Site Selection - Extensive Analysis of SouthCentral coast options analyzed; 4-5 sites feasible - Geotechnical, construction, operation issues Lead LNG Plant Site Nikiski Industrial Area

Alaska LNG Project Concept Information Work Product In Progress 2 Alaska LNG Concept Summary - Upstream PTU (62 miles east of PBU/GTP area) Initial Production System (IPS) project in progress SU Preliminary AK LNG design basis for PTU: –Leverage IPS facilities, add fourteen new wells –Add new gas facilities to existing central pad / facilities –New 30 gas line from PTU to GTP in Prudhoe Bay –Peak workforce – 500-1,500 people PBU Tie-in (adjacent to proposed GTP location) Installation / tie-in managed by Prudhoe Bay Operator –Tie into existing CGF, deliver gas to new Gas Treatment Plant –Gas project / deliveries tied to future PBU operations Preliminary plan is to inject CO 2 using existing injection systems as appropriate PTU Field Layout Process Utilities Power Generation Diesel Storage Living Quarters Maintenance Warehouse Cold Storage Drill Rig Point Thomson Central Pad Compression PBU Central Gas Facility Tie-in

Alaska LNG Project Concept Information Work Product In Progress Alaska LNG Pipeline Elevation Design Example Potential Pipeline Routes Alaska LNG Concept Summary - Pipeline Gas Pipeline and Compression Stations 800+ mile 42 x80 pipeline billion cubic feet gas per day Eight compressor stations (30kHP each) Pipeline contents will be treated gas, impurities removed at NS GTP Designed to manage continuous and discontinuous permafrost regions Expansion potential with additional compression if appropriate Refining route based on summer field information, continued design work Five off-take points for Alaska gas delivery Peak workforce – 3, ,000 people

Alaska LNG Project Concept Information Work Product In Progress 4 Alaska LNG - Concept Summary – GTP / LNG Plants NS Gas Treatment Plant Defined PBU integration for gas inlet, discharge Designed to remove gas impurities Four amine trains with compression, dehydration and chilling Prime power generation (5 units, 54kHP) All required utilities, infrastructure and camps Facility will be modularized, sealifted to location Peak workforce – 500-2,000 people LNG Plant, Storage and Marine Facility Three 5.8 million tons per annum (MTA) LNG trains (17-18MTA) -Plant receives billion cubic feet per day to liquefy -LNG production varies with ambient temp ( MTA) -Small volume of stabilized condensate (~1,000 bbl/day) Integrated utility system with all utilities on site Three 160,000 cubic meter LNG storage tanks Conventional jetty with two berths (15-20 LNG Carriers) Peak workforce – 3,500 – 5,000 people for LNG plant Peak workforce – 1,000 – 1,500 people for marine facility Evaluating modularization to manage risks NS Gas Treatment Plant LNG Plant and Storage

Alaska LNG Project Concept Information Work Product In Progress Recent Progress 5 Prudhoe Bay Data capture/analysis of PBU gas composition Evaluated field dehydration performance and depletion planning Developing integrated injection system Evaluating integrated power grid Point Thomson Comparing plot plan options for safety/operability Evaluated process design requirements Developing design basis for engineering work Gas Treatment Plant Confirmed viability of 3 train design, aligns gas treatment plan with LNG plant Finalized CO 2 design / handling basis Working to modularize plant design and evaluating sealift plans Pipeline Refined route from PBU to Livengood, finalizing preliminary route from Livengood to Cook Inlet Working special design areas -Atigun Pass - Denali National Park Area -Yukon River - Cook Inlet -Progressing fundamental technical work on geohazard analysis, waterway crossings, hydraulics and design LNG Plant and Marine Lead site selected Completed plans for metocean data gathering Ambient air monitoring stations / plan finalized Progressing work on LNG capacity and technology

Alaska LNG Project Concept Information Work Product In Progress Recent Progress – Environmental, Regulatory and Land Cultural Resource Survey Areas Environmental, Regulatory and Land Safe summer field season 2013 –No incidents for >40,000 man-hours, 90,000 miles –No reportable spills or public complaints Peak workforce of over 130 contractor staff completed survey work from PBU to Livengood –Over 6,500 acres surveyed for cultural resources –Over 75 hydrology, lakes and fisheries surveyed –Traditional knowledge and ethnographic surveys