Otara Gas Turbine Station By Doug St George, Assistant Engineer with NZ Electricity Dept 1967 to 1969.

Slides:



Advertisements
Similar presentations
Methane Capture and Use: Current Practices vs. Future Possibilities.
Advertisements

GAS TURBINE POWER PLANTS
JET ENGINE MECHANICAL ARRANGEMENT
In India 65% of total power is generated by the Thermal Power Stations. Main parts of the plant are 1. CHP.
Jamesway Incubator Company Inc. HRS System By Dominic Babineau, Engineer.
UL/FM Fire Pump Systems Lunch & Learn 04/18/05
LESSON TEN. AIR AND EXHAUST SYSTEMS AND TURBOCHARGERS.
CHAPTER 3 INTERNAL COMBUSTION ENGINES
CCAS 3381 AUTOMOTIVE SKILL I ENGINE SUBSYSTEMS. OBJECTIVES To understand the operational principles and basic mechanisms of engine sub-systems Lecture.
Steam (Vapour) Power Plant Rankine cycle Power Plant
ENERGY CONVERSION ES 832a Eric Savory Lecture 11 – A small-scale power plant worked example Department of Mechanical.
3-Multi - Can Annular Combustor 3-Multi - Can-Annular Combustor The third design and the one preferred by most manufacturers, is the can-annular combustor,
Turbochargers ure=related.
Diesel Automotive Engines
1. Cooling tower. 2. Cooling water pump. 3. Transmission line (3-phase). 4. Unit transformer (3-phase). 5. Electric generator (3-phase). 6. Low pressure.
Presentation Technology ORC GREEN MACHINE
POWER PLANT.
Three-Phase ac Voltage Generation
POWER GENERATION TECHNOLOGIES
Combined_Cycle_Power_Plant Prepared by: Nimesh Gajjar.
This tutorial is a PowerPoint ® file which includes recorded narration. Automatic slide sequencing is coupled to the sound track. For the most effective.
TURBOCHARGERS & SUPERCHARGERS
How Does a Gasoline Engine Work? by Ryan Cramer… 6 th grade.
Diesel Power Plant Mr.B.Ramesh, M.E.,(Ph.D) By
Gas Turbine Power Plant
Gas Power Cycle - Jet Propulsion Technology, A Case Study
Gas Turbine Theory and Construction
Endend Oil and gas market. endend Customer requirements High reliability Low operating costs Low first cost Local codes and standards Domestic content.
How do nuclear plants work? By: Madison Layden. In a nuclear-fueled power plant – much like a fossil-fueled power plant – water is turned into steam,
L 20 Thermodynamics [5] heat, work, and internal energy heat, work, and internal energy the 1 st law of thermodynamics the 1 st law of thermodynamics the.
Energy and the Environment Spring 2014 Instructor: Xiaodong Chu : Office Tel.: Mobile:
Gas Turbine Theory and Construction. Introduction Comprehend the thermodynamic processes occurring in a gas turbine Comprehend the basic components of.
Otto, Diesel, and Rotary Engine Cycles Arenas Alejandro Julian Thompson Daniel Vertucci Matthew White.
How It Works Diesel Locomotive Air Breaking Dynamic Breaking.
Unit 2 -Gas And Diesel Power Plants
POWER. Power –Power measures how quickly work is done –Power systems are the machines that use energy to perform work –They are found in automobiles,
The Diesel Engine The Combustion Cycle The four-stroke combustion cycle of the diesel engine is composed of the intake stroke, compression stroke, power.
Gas law engine Operation of a 4 cycle engine: Google “4 cycle animated Engine” Use the ideal gas law if the number of moles change. The combined gas law.
Prof. R. Shanthini Nov 12, An engineering example for unsustainable development.
Gas Turbine Power Plant
Barford Power Station St Neots Community College Sixth Form Visit, May 2008.
A SEMINAR ON PRACTICAL TRAINING AT SURATGARH SUPER THERMAL POWER STATION.
THERMAL POWER PLANT.
Automotive Engines: Theory and Servicing, 6/e By James D Halderman © 2009 Pearson Education, Inc. Pearson Prentice Hall - Upper Saddle River, NJ
SURATGARH SUPER THARMAL POWER STATION
Coolant Fill Coolant Check and Fill. Oil Fill & Dip Stick Main Engine Oil Fill Dip Stick Delo 400 – 40 wt. Engine Oil.
Training Presentation On Suratgarh Super Thermal Power Station (Raj)
Presented by Thomson george
Presentation on Steam Power Plants R.C.Chaturvedi
Engine Brake VEB + VEB + is the name of the Volvo engine braking system and is a further development of the VEB engine brake. Engine brake VEB + consists.
1 3E-03 Fire Syringe RAPID COMPRESSION IS ADIABATIC GIVING RAPID RISE OF AIR TEMPERATURE IN THE CHAMBER WHICH EXCEEDS THE IGNITION TEMPERATURE OF THE FLAMMABLE.
I ntroduction.. 1 Energy Conversion  Energy Conversion  Energy Conversion is when energy changes into another form. In physics, the term energy describes.
Refrigeration What's Refrigerated? What makes up a system?
WORK Work = Force x Distance POWER power = work done ÷ time taken ENERGY 1-POTENTIAL ENERGY (Potential Energy = Force x Distance ) 2-KINETIC ENERGY Energy.
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
SATURN – GAS TURBINES POWER GENERATING AND GAS COMPRESSOR SETS
Des. Ton Nguyen. MAIN PARTS  Fan  Compressor  Combustor  Turbine  Nozzle.
Gas Turbine Power Plant
Unit 40: Engines and motors Dr
Gas Turbine Theory and Construction
BASICS OF MECHANICAL ENGINEERING
Gas Power Plant - Layout and Operation
Unit 40: Engines and motors Dr
Chapter 40: Engines and motors
By: Stephen A. Kieffer 1. Internal Combustion Engine -Introduction- o My name is Stephen Kieffer … Graduate of Arizona State University … Degree in Aerospace.
Diesel Automotive Engines
BASIC MECHANICAL ENGINEERING
ENERGY CONVERSION ES 832a Eric Savory
IC Engines Classifications
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
Presentation transcript:

Otara Gas Turbine Station By Doug St George, Assistant Engineer with NZ Electricity Dept 1967 to 1969.

This power station was built with 4 Stal-Laval gas turbines, each of 50 Megawatts, or about 67,000 horsepower. The first turbine was dual-fuel, to run on either Kapuni natural gas, or diesel and was cooled by fresh water with cooling towers. Units 2,3 and 4 were cooled by salt water from the Otara creek nearby. This power station was built with 4 Stal-Laval gas turbines, each of 50 Megawatts, or about 67,000 horsepower. The first turbine was dual-fuel, to run on either Kapuni natural gas, or diesel and was cooled by fresh water with cooling towers. Units 2,3 and 4 were cooled by salt water from the Otara creek nearby.

The turbine unit comprised a gas generator, on the left, with separate low and high pressure compressors, twin vertical combustion chambers, with piping above and below the floor leading to the power turbine, driving the generator. Starting was by compressed air blowing into the low pressure compressor. The turbine unit comprised a gas generator, on the left, with separate low and high pressure compressors, twin vertical combustion chambers, with piping above and below the floor leading to the power turbine, driving the generator. Starting was by compressed air blowing into the low pressure compressor.

The generator shaft had a free-wheel coupling to allow the generator to be run at 3000 RPM on its own, as a synchronous condensor, for voltage control. The generator shaft had a free-wheel coupling to allow the generator to be run at 3000 RPM on its own, as a synchronous condensor, for voltage control.

Some views follow, taken from the top of one of the exhaust stacks. The Otahuhu Sub-Station building can be seen, where remote start switches were fitted. The turbines could be generating full power in a few minutes after pressing start. Some views follow, taken from the top of one of the exhaust stacks. The Otahuhu Sub-Station building can be seen, where remote start switches were fitted. The turbines could be generating full power in a few minutes after pressing start.

A view of the Otara Creek, used for salt water cooling, and the salt-water pumphouse. A view of the Otara Creek, used for salt water cooling, and the salt-water pumphouse.

A view of the cooling towers for turbine # 1. A view of the cooling towers for turbine # 1.

The control room for the Otara Turbine Station. In 1969, the equipment included relay control panels and solid-state turbine governors, made of discrete components (before integrated circuits, silicon chips and computers were invented) The control room for the Otara Turbine Station. In 1969, the equipment included relay control panels and solid-state turbine governors, made of discrete components (before integrated circuits, silicon chips and computers were invented)

The NZEDs 1946 Bedford truck for use by the Assistant Engineers, Bob Eagle and Doug St George. We had use of it when it was not being used for blocking a hedge in Henderson. The NZEDs 1946 Bedford truck for use by the Assistant Engineers, Bob Eagle and Doug St George. We had use of it when it was not being used for blocking a hedge in Henderson.

After leaving the NZED in 1969 I worked for Stal-Laval in Sweden. This is a picture of the same type of turbine installed in Hämeenlinna, in Finland. Others were installed in China and Västervik, Sweden. After leaving the NZED in 1969 I worked for Stal-Laval in Sweden. This is a picture of the same type of turbine installed in Hämeenlinna, in Finland. Others were installed in China and Västervik, Sweden.

And now in 2007? In the 1970s two more gas turbine units were installed, but the Government chose aero- engine types as they had found the Stal-Laval units did not start up reliably when needed. Two more chimneys were added to the western end of the station. The chimneys for the Stal-Laval units have since been removed. And now in 2007? In the 1970s two more gas turbine units were installed, but the Government chose aero- engine types as they had found the Stal-Laval units did not start up reliably when needed. Two more chimneys were added to the western end of the station. The chimneys for the Stal-Laval units have since been removed. Otahuhu B combined cycle power station has been built nearby. Otahuhu B combined cycle power station has been built nearby.