Well Permitting & Approvals
RRC Statewide Rule 13 “What you need to know.”
RRC Statewide Rule 13 “What you need to know.”
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Railroad Commission of Texas RICK BEHAL ON-LINE COMPLETIONS - UIC 1.
Changes to Statewide Rule 13 June, 2013 Texas Alliance of Energy Producers John Tintera, P.G. Sebree & Tintera, LLC.
1 Railroad Commission of Texas Chairman Barry T. Smitherman Commissioner David J. Porter Commissioner Christi Craddick Railroad Commission of Texas Statewide.
WHAT TO DO WITH THE LEFTOVERS? OWNERSHIP ISSUES ASSOCIATED WITH ABANDONED PLATFORMS, WELLS, AND UNITS The Legal Issues.
Statewide Rule 10 : Downhole Commingling
UIC Permit Applications: Technical Review & Public Notification
Field Operations and State-Managed Plugging Overview
CWAG 2010 WATER LAW CONFERENCE The Broadmoor Colorado Springs, Colorado April 29 – 30, 2010.
Drilling Permits Statewide Rule 37 & 38 Exceptions Lorenzo Garza
Water Demands for Mining Richard Lowerre Adapted from presentation to Texas Groundwater Summit September 2013.
Performance Audit (May 2014) Office of Conservation, DNR Oil and Gas Program Concluded (among others): o Does not perform appropriate routine inspections.
Railroad Commission March 24, 2008 Charles Ross, PE Deputy Director, Field Operations Oil and Gas Division Railroad Commission of Texas
1 Hydraulic Fracturing Regulatory Processes in Louisiana James H. Welsh Commissioner of Conservation.
Granite Wash Casing Profile Texas Panhandle (District 10) Western Oklahoma OKC Granite Wash Conference – March 6, 2008.
GAS DRILLING & HYDRAULIC FRACTURING In the Tidewater Region Photo credit: R.W. Dawson.
“PRODUCTION” MIDDLE EAST TECHNICAL UNIVERSITY
FORM 1000 – APPLICATION TO DRILL, RECOMPLETE OR REENTER.
August 14, 2001AOGCC / Jt. Committee on Natural Gas Pipelines 1 Alaska Oil and Gas Conservation Commission (AOGCC) Presentation August 14, 2001 to Joint.
COLORADO OIL AND GAS CONSERVATION COMMISSION CLASS II UNDERGROUND INJECTION CONTROL RULES AND REGULATIONS Garfield County Energy Advisory Board Thursday,
UIC Completion Reporting Guidance
FORM 1075 – MECHANICAL INTEGRITY TEST. This presentation will assist you in the completion of the Form The mechanical integrity test. Date of Last.
RAILROAD COMMISSION OF TEXAS BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES 1.
Copyright © 2014 Holland & Knight LLP. All Rights Reserved Injection Well Regulation in Texas June 2014 Fred Stovall.
Well Construction Example 1 Screen in Target Confined Aquifer C Confined Aquifer B Proper Well Construction Requirements In addition to the Virginia Department.
RAILROAD COMMISSION OF TEXAS Horizontal Drilling Permit Applications Lorenzo Garza.
The Injection Connection: A Regulatory Framework for Geologic Sequestration of Anthropogenic Carbon Dioxide  2010 Diane Perkins All Rights Reserved.
UTAH GEOTHERMAL Dr. R. Gordon Bloomquist, Ph.D Washington State University Energy Program Salt Lake City, Utah 20 January 2004.
Monitoring Well Post-Installation Consideration By: Pierre-Orly Dupont.
RAILROAD COMMISSION OF TEXAS Rick Behal Railroad Commission of Texas Injection and Disposal Well Permitting.
The Underground Injection Control (UIC) Program
CLICK TO EDIT MASTER TITLE STYLE Railroad Commission of Texas RICK BEHAL MECHANICAL INTEGRITY TESTS ON INJECTION AND DISPOSAL WELLS (FORM H-5)
Colorado’s Groundwater Protection Program Monitoring and Protecting Groundwater During Oil and Gas Development Natural Resources Law Center Intermountain.
Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, Austin, Texas Rick Behal 1.
Who Can Plug an Abandoned Well. Overview Introduce the common methods used to construct wells. Discuss the different types of wells Discuss what types.
RAILROAD COMMISSION OF TEXAS WELL COMPLIANCE FORMS AND PROCEDURES Austin Regulatory Conference September
Developing Green Stormwater Design Solutions For UIC Compliance Presented by: Adam Zucker PE, CWRE 819 SE Morrison Street ● Suite 310 ● Portland, Oregon.
RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore.
Class Description In the class today we will be discussing how to properly file the P-17 report. The P-17 form is used by an operator when they are surface.
EPA's Regulatory Approach : Climate Mitigation via Sequestration of CO2: by Rob Ferri (EPA - Underground Injection Control) This presentation has not been.
DEVELOPMENT OF THE HYDRAULIC FRACTURING REGULATIONS FOR NEVADA PRESENTATION TO MINING OVERSIGHT AND ACCOUNTABILITY COMMISSION ( MOAC) September 24, 2014.
Monitoring and Protecting Groundwater During Oil & Gas Development Overview of Colorado Aquifer Systems November 26, 2012 Christopher J. Sanchez, P.G.
BLM Legacy Wells Environmental Hazards & Eyesores.
The Role of Groundwater Sampling/Monitoring COGCC Proposed Rule 609 University of Colorado Law School Nov 26, 2012.
Idaho Oil and Gas 101 Bobby Johnson, P.G. Oil and Gas Program Manager Idaho Department of Lands.
OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION February 18, 2012.
RAILROAD COMMISSION OF TEXAS Navigating the New RRC Website
What You Need to Know about Groundwater Conservation Districts In Texas Tyler December 3,2002 Guy Fipps Professor and Extension Irrigation Engineer Dept.
RAILROAD COMMISSION OF TEXAS Chairman David Porter Commissioner Christi Craddick Commissioner Ryan Sitton September 15-17, 2015.
Drilling Permits Statewide Rule 37 & 38 Exceptions Lorenzo Garza
RAILROAD COMMISSION OF TEXAS Norman Gearhart, P.G. Manager Groundwater Advisory Unit.
RAILROAD COMMISSION OF TEXAS Groundwater Protection Determination Letters Norman Gearhart, P.G. Manager Groundwater Advisory Unit.
Presentation on “ELEMENTS OF PRODUCTION ENGINEERING”
Radioactive Materials Licensing Authorizing licenses for: Low-level radioactive waste disposal By-product material disposal Public water system NORM waste.
RICK COOPER DIRECTOR OF THE DIVISION OF GAS AND OIL VIRGINIA DEPARTMENT OF MINES, MINERALS AND ENERGY Gas and Oil Well Drilling Requirements for the Tidewater.
John James Tintera, PG #325 Texas Alliance of Energy Producers Injection Well Regulatory Update April, 2016.
Legislation Governing Horizontal Drilling in West Virginia §22-6 portion of West Virginia Environmental Resources law governing Oil and Gas Wells August.
Texas Inactive Well Regulations April Texas Inactive Well Regulations In September 2010, the RRC amended statewide rules 1, 14, 21, and 78 and adopted.
Disposal/Injection Well Pressure Test Report (H-5)
Oil & Gas Waste Stream Management and Permitting Options
Chairman Christi Craddick
Class I Injection Well Application Issues
An Overview of the Current OCD Underground Injection Control (UIC) Program Heather Riley, Director New Mexico Oil Conservation Division.
Texas Disposal Well Rules And Seismicity Leslie Savage, P.G.
How Well is Your Well? UIC Class I Well Construction Standards
Recent UIC Class I Well Construction Issues
Presentation transcript:

Railroad Commission of Texas Victor G. Carrillo - Chairman Elizabeth A. Jones – Commissioner Michael L. Williams – Commissioner

Commercial Salt Water Disposal Well Permitting Gil Bujano P.E. Assistant Director Technical Permitting, Oil & Gas Division

Regulatory Background There are over 392,000 oil and gas industry wells in Texas The first injection well in Texas was permitted in 1936 There are 100,270 injection and disposal wells on the books There are 52,084 currently permitted injection and disposal wells as of 1/6/2010

Regulatory Background The RRC administers the Class II UIC program in Texas under authority delegated by EPA 20% of UIC funding comes from EPA EPA oversight is ongoing to ensure that the RRC program is effective RRC program must be equivalent to EPA, but not necessarily identical.

Over 160 Commercial Disposal Wells in the General Area Clay – 1 Comanche – 1 Cooke – 7 Denton – 3 Erath – 2 Grayson - 0 Hamilton – 2 Hill – 3 Hood - 16 Hamilton – 1 Jack – 15 Johnson – 28 Montague – 21 Palo Pinto – 10 Parker – 15 Somervell – 5 Tarrant – 4 Wise – 31

Permitting Staff 4 Engineer/Geologists review permit applications 1 Engineer supervises workgroup 1 Engineer supervises the Technical Permitting section and signs all permits

General Permitting Requirements Base of Useable Quality Groundwater depth Notice and Hearing Opportunity Area of Review Geologic Requirements Surface Casing Production Casing Packer Requirements

BUQW For new wells, surface casing must be set to the protection depth determined by the Texas Commission on Environmental Quality (TCEQ) This is called the Base of Useable Quality Water The surface casing is cemented to the surface.

Notice & Hearing surface owner adjacent landowners (Commercial Disposal) operators within ½ mile city clerk if in city limits published in general circulation paper Protest: affected person who has or will suffer actual injury or economic damages other than a member of the general public…including surface owners and adjoining offset operators

Area Of Review Statewide rules require that an applicant for an injection or disposal well permit examine the data of record for wells that penetrate the proposed injection zone within a one quarter (1/4) mile radius of the proposed well This is to determine if all abandoned wells have been plugged in a manner that will prevent the movement of fluids into strata other than the authorized injection or disposal zone. A permit applicant must submit a map showing the location of all wells.

Geological Requirements 1.This part of the permit review verifies that the proposed injection zone is adequately isolated by relatively impermeable strata to confine injected fluids to the proposed zone. 2.The authorized injection or disposal strata must be isolated from overlying usable quality water by a sufficient thickness of relatively impermeable strata, which is generally considered to be an accumulative total of at least 250 feet of clay or shale.

Completion Requirements Three Layers of Protection 1st Layer: Surface Casing 2 nd Layer: Production casing 3 rd Layer: Tubing and Packer

Surface Casing: 1 st layer of protection SWR 13 applies to all RRC wells and requires that surface casing be set and cemented through the groundwater to protect it before drilling beyond that depth into deeper formations Surface casing acts as a protective sleeve through which the deeper drilling occurs

Production Casing Completion Requirements: 2 nd layer of protection SWR 13 applies to all RRC wells Requires production casing to be cemented with enough cement to fill 600 ft above shoe and any other productive intervals SWR 9 applies to all RRC disposal wells Specifically for injection wells

Production Casing Completion Requirements cont… After drilling (inside the surface casing) to the target formation, the production casing is set and cemented to isolate the target formation SWR 9 Requires ft. of cement at the top of the injection interval to ensure that injected fluids do not escape the permitted interval By running bond logs, or temperature surveys to increase confidence in the effectiveness of the cement, less vertical cement may be permitted.

Tubing and Packer : 3 rd layer of protection All newly drilled or converted disposal wells permitted under Rule 9 must be equipped with tubing set on a mechanical packer unless an exception is granted by the director for good cause. Pressure observation valves are required on the tubing and each annulus.. Tubing is slim pipe inserted into the center of the well bore inside the surface casing and production casing A packer is a mechanical device that seals the open space (annulus) between the tubing and the packer Disposal wells must have a packer set within 100 feet of the permitted disposal interval

Post-Permitting Annual Monitoring reports must be filed on every injection/disposal well to report activity, status, and monitoring 52,000 reports are received annualy and reviewed by staff and automated programs Initial and periodic Mechanical Integrity Tests must be performed to check for leaks RRC staff review 15,000 – 18,000 tests each year

Permitting of the Bosque Disposal Systems Sophia #3 The well application was filed under Statewide Rule 9 for disposal of oil and gas exploration and production (E&P) waste into the interval between 8,700 and 12,750 feet below ground surface. The well application is to dispose into the deeper Ellenburger formation, but would be carried in the shallower Barnet Shale for book keeping reasons.

Bosque Disposal Systems Sophia #3 Surface Casing Deepest groundwater is at 1395 ft. at the well location Rules require setting 1395 ft. of surface casing Surface casing in the Sophia SWD well is to be set at 1,475 ft. and cemented back to ground surface

Railroad Commission of Texas