21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
Advertisements

5/11/2012LHC 8:30 meeting Summary of Week 44 Coordination: Mike Lamont & Jan Uythoven.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
08h15: Injection.  Correction injection oscillations.  Transfer line steering.  Losses at 30% of dump threshold, limited by SPS scraping. 12h35: Start.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
:30 meetingEBH 1  No beam during the morning:  4:15 – 9: V distributor: Recovery after electrical interruption  access for TI services.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Friday 15th June 01:11 Injection.
Wednesday September 14th
Wednesday 21 March 2012.
Summary Friday h38: Ramp down and pre-cycle.
Wed :55 Fill 2653 stable beams 1.40e11 ppb, cm-2s-1peak lumi, 11.6 pb-1 total lumi delivered. 09:31 Dumped by collimator interlock:
Monday 11/07: Recovery Plenty of accesses.
Thursday 09:30 VdM scan for CMS, standard ADT gain.
Summary week 23 Luminosity production
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Saturday 12:00 Fill 1992 in stable beams.
Monday 6th August & night
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
LHC Morning Meeting - G. Arduini
Fri 15th – Sun 16th June Friday Saturday Sunday Monday
Summary of week 22 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Tuesday 08:30 Fill 2700 dumped by QPS on RCBXH2.L1
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Wednesday 31 October: Morning
Summary of Week 16 G. Arduini, J. Wenninger
Lost at 12:05 to power converter (RTQX2.R1) problem
Friday 31st August & night
Wednesday 8th August & night
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Saturday – Morning 7:36 beams dumped
Not the most productive 24 hours on record
Friday Morning 7:30 injection for fill 2908
Yesterday morning Held 1647 for a while – SPS kicker problem
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
LHC Morning Meeting - G. Arduini
Tue/Wed 12/ :00 Probe beam back again
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Thursday 22 September 2011.
Friday morning 08:00 Stable beams with 840b.
Week 25 Summary Coordinators: Mike Lamont and Barbara Holzer
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Saturday 24 September 2011.
Coordination: Eva Barbara Holzer, Mike Lamont
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
LHC Morning Meeting - G. Arduini
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Thursday Morning/Afternoon
Wednesday 14:30 Fill 2011 dumped.
Saturday 26 November 2011.
Tuesday
Thursday 10:00 Fill 1986 in stable beams.
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Presentation transcript:

Thu 14.06.12 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1. 07:29 Beams dumped by BLM self trigger. Integrated lumi 68 pb-1. 09:51 BLM card replaced, kickers cooled down. Injecting probes. 10:55 Different BLM problem, again in point 1: One of the two fibres coming up from the tunnel is 'broken' and gives continuous faults. An access of at least 2 hours would be needed to fix it (they don't know where the fault is exactly). They prefer to postpone the access to a later moment, probably the next technical stop. As there are two redundant fibres, they will split the signal from the good one. The system will still be safe (and failsafe) but it will lose the redundancy. 12:02 Injecting again - some problems with beam from SPS. 15-06-2012 LHC morning report

Fill 2729: Crossing Angle Drift 15-06-2012 LHC morning report

MKI Temperature after Fill 2729 Recovery of MKI temperature in shadow of BLM card problem. Would have otherwise delayed injection… 15-06-2012 LHC morning report

Thu 14.06.12 12:02 Injecting again Some problems with beam from SPS: Lost a 80 MHz PS cavity, bad capture at the SPS. BQMSPS latching on peak and with faults on analysis at injection which (so far) is not interlocked. We need only 2 more injections (we let one bad 72 one in intentionally to check on our side). 13:58 Beams dumped at beginning of mode “Adjust” due to high losses in IP7: Losses appeared already at the end of the squeeze. B2 only. Betatron losses. 14:50 Injection. Bunch length problems in the injectors. Injector chain tuning. 15-06-2012 LHC morning report

Bunch Length B1 and B2 15-06-2012 LHC morning report

Beam Dump at Start of Adjust Losses show that this was a beam 2 problem only… Also: All losses in IR7  Betatronic, no longitudinal problem! 15-06-2012 LHC morning report

Lifetime for Lost Fill 15-06-2012 LHC morning report

Time Evolution of Bunch by Bunch Losses 0.6% 16% 15-06-2012 LHC morning report

Zoom into B2 Bunch-by-Bunch Losses 15-06-2012 LHC morning report

Location of Unstable B2 Bunches 15-06-2012 LHC morning report

Tune Feedback Trims: Seems OK However, B1 and B2 very close to each other: Can it be that B2 tune peak was in fact B1?  NO However, started with an unusually large initial trim (offset)! 15-06-2012 LHC morning report

B2 Excitation: Maybe or maybe not? Previous fill Lost fill 15-06-2012 LHC morning report

Thu 14.06.12 14:50 Injection. Bunch length problems in the injectors. Injector chain tuning. 17:44: Extraction kicker problem in the PS (controls problem). 18:25 Injection probe beam. 19:00 Injection physics beam Quite long and unstable injection. Many injections inhibited due to bunch length! 19:46 Ramp. Injector tuning continuing after end of LHC injection. 19:59 At 4 TeV. MKI2 faulty after start the ramp. 20:29 Stable Beams #2732. Initial lumi: 6.6e33. 22:20 Beam dumped. Integrated 40pb-1. QPS triggered on RQX.R1, fire heaters discharged, vacuum valves closed. SEU? 15-06-2012 LHC morning report

Bunch Length Problem in the SPS abnormal 12b normal 15-06-2012 LHC morning report

MKI Kicker Problem MKI vacuum interlock from 19:49:54 is understood: it just happened when we had the shortest bunch length at the start of the ramp and the vacuum signals look as e-cloud as well. Reset the vacuum interlock and soft start when we need to reinject. 15-06-2012 LHC morning report

Fri 15.06.12 01:11 Injection. 02:42 Stable beams #2733. Initial lumi: 7e33cm-2s-1. Ongoing… Essentially reached 6fb-1. At 8:17: 5.976/6.042 fb-1 (ATLAS/CMS) 15-06-2012 LHC morning report

Planning Ahead Delivering luminosity… To be done… RF: Long. blow-up at injection: tried it, to be re-visited after TS New filling scheme (6 non colliding bunches for ATLAS/CMS): Ready for usage ADT: Pilot for 15min. 6b for 15min. Impact of TETRA on hump / beam: 30 mins at injection with probe bunches. Access: TCLIB.6R2.B1 electronics and LVDT sensor. MAD PM15: motors of inner doors not working (at least 4 hours). BI in Pt4 (3-4 hours, working hours). TOTEM vacuum gauge (3 hours). MCBV18.L4B1 and RCO.A12.B1 to be repaired. LBDS Check/repair Ethernet connection on FEC cfc-ua63-mkdtspm. 1 hour during working hours, N. Magnin. Collimator cooling check TCT IR8 – Oliver Aberle Pt.7 (IMPACT: 18638) to exchange two amplifiers for the diamond BLMs. 2 hours (Ewald). BI: UA43 - lost remote communication with one of our controls front-ends. ½ hour. BI: Q7R4 (RF zone) - install attenuator and temperature probes on the HT- monitor to be retrieved during the next TS. ½ hour. 15-06-2012 LHC morning report