MODULE 7 Definitions Module 7 page 1.

Slides:



Advertisements
Similar presentations
Title: The title should accurately describe the issue to be addressed and can never contain a proposed countermeasure. Overview Note: Remember that the.
Advertisements

Project Management Shuffle Directions: take the definitions from the following cards and write a song using the tune from “Cupid Shuffle”
Understanding & Managing Risk
Where does Failure Mode and Effects Analysis (FMEA) come from?  Developed by the Aerospace industry in the1960s  Spread to the Automotive industry 
Program Evaluation. Lecture Overview  Program evaluation and program development  Logic of program evaluation (Program theory)  Four-Step Model  Comprehensive.
Root Cause Analysis Workshop Pima Medical Institute, Albuquerque, New Mexico Friday; May 18, 2007; 8:30 am.
Root Cause Analysis Procedure (IMSP525) Training
Environmental Management System. What is EMS? EMS is a part of a comprehensive management system that addresses how the overall business activities, including.
1 Pertemuan Keduapuluhenam Implementation and Control.
ENERGETIC MATERIALS Co. Root Cause Analysis Guidelines 1.
Copyright © 2013 Nelson Education Ltd.
Bureau of Workers’ Comp PA Training for Health & Safety (PATHS)
Root Cause Analysis: Why? Why? Why?
Root Cause Analysis - Overview
Five Star Quality Consultants Implementing ISO 9001 Corrective and Preventive Action.
AICT5 – eProject Project Planning for ICT. Process Centre receives Scenario Group Work Scenario on website in October Assessment Window Individual Work.
Leading Metric Indicators. Expected Outcomes Understand the difference between performance indicators and measures Why lagging indicators don’t tell the.
1 Accreditation and Certification: Definition  Certification: Procedures by which a third party gives written assurance that a product, process or service.
District Workforce Module Preview This PowerPoint provides a sample of the District Workforce Module PowerPoint. The actual Overview PowerPoint is 62 slides.
Professional Certificate – Managing Public Accounts Committees Ian “Ren” Rennie.
© Mahindra Satyam 2009 Defect Management and Prevention QMS Training.
Guidance Notes on the Investigation of Marine Incidents
Project Management Office (PMO) Technical Risk Workshop Wendy Collidge.
DQ MEPRS Audit Readiness 2012 Navy Medicine Audit Readiness Training Symposium Plan of Action and Milestones (POA&Ms) DQ Statement Comments A How-To Exercise.
CIS 499 Senior Seminar Introduction to IT project management.
DEFINITION Quality assurance is the process of verifying or determining whether the products or services meet or exceed the customers expectations. Quality.
Hazards Identification and Risk Assessment
STEP 1: DEFINE THE PROBLEM Problem Statement: What is the problem? A problem is a discrepancy between a standard and the current situation. The ‘standard’
Management 200: Control Chapters 18 & 20 Controlling for Organizational Performance w Learning Objectives: Elements of the control process Measure Compare.
Professional Certificate in Electoral Processes Understanding and Demonstrating Assessment Criteria Facilitator: Tony Cash.
Company Confidential Registration Management Committee RMC Auditor Workshop Charleston, SC July Supplemental Oversight AS9104/2A & Special.
Introducing Project Management Update December 2011.
Section 3.2 Notes Conditional Probability. Conditional probability is the probability of an event occurring, given that another event has already occurred.
BZUPAGES.COM Iram mumtaz Roll no Quality audit “An audit is a systematic and independent examination to determine whether quality activities and.
CANADIAN COAST GUARD AUXILIARY - PACIFIC PROBLEM SOLVING CANADIAN COAST GUARD AUXILIARY - PACIFIC 2008.
Identifying the Elements of A Plot Diagram Student Notes.
Root Cause
Fundamentals of Governance: Parliament and Government Understanding and Demonstrating Assessment Criteria Facilitator: Tony Cash.
Internal/External Audit Corporate Governance part 5.
12-1 Activity-Based Management The Relationship of Activity- Based Costing and Activity- Based Management Continuous Improvement is a process.
Version Corrective and Preventive Action
OHSAS Occupational health and safety management system.
1 Kevin O’Connor Airworthiness Surveyor Civil and Military Design, Production & Continuing Airworthiness Root Cause Analysis Project…

ISO 14001: 2004 Environmental Management Review Presentation
Case Study.
BASIC PROFESSIONAL TRAINING COURSE Module V Safety classification of structures, systems and components Case Studies Version 1.0, May 2015.
Nursing Process Applied to Community Health Nursing
PROBLEM SOLVING MODULE
<Project Name> <Name> SOLUTIONS / COUNTERMEASURES
Global 8D Problem Solving
UNIT V QUALITY SYSTEMS.
Director, Quality and Accreditation
MODULE 5 Follow Up & Assessment
MODULE 4 Solution Corrective Action: A set of planned actions implemented for the purpose of resolving the problem. Corrective action is the goal of the.
مدیریت عدم انطباق Nonconformity Management
Subcomponents 8D for Problem Solving
Root Cause Analysis: Why? Why? Why?
Audit Findings Process
Tools for Implementation
Tools for Implementation
This presentation has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational purposes.
AICT5 – eProject Project Planning for ICT
Sequence Diagram Traces
by Operational Excellence Consulting LLC
Quality Assurance in Clinical Trials
MODULE 1 Introduction WELCOME to the ROOT CAUSE ANALYSIS WORKSHOP
EVENT: An all-inclusive term for any of the following:
Master Forms MODULE 8 Use the forms in this section as MASTERS.
Follow-up and Assessment
Presentation transcript:

MODULE 7 Definitions Module 7 page 1

Cause: A factor leading to an event. Assessment: An independent review to determine if the corrective actions have been effective in preventing recurrence. Cause: A factor leading to an event. Cause Chain: A diagram showing the causes linked in sequence from the event question to the root cause. Contributing Cause(s): The cause(s) that contributed to an event but, by itself, would not have caused the event. (The causes after the direct cause.) Corrective Action: A set of planned actions implemented for the sole purpose of resolving the problem. Direct Cause: The cause that directly resulted in the event. (The first cause in the chain.) Effectiveness Measurements: The criteria used to evaluate if the corrective actions have achieved the desired outcome. Event: All inclusive term for any of the following: product failure, out of control process, audit finding, accident, customer complaint, pleasant surprise, etc. Event question: The problem, in the form of a question, that is used to start the analysis. Follow Up: A review done by a team member to insure all corrective actions were implemented as stated. Module 7 page 2

Global Issue: Significant issues with a high probability of occurring in areas outside of the team’s control. Natural Team: A group of people having vested ownership of the problem to be solved. Preventive Corrective Action: Action(s) taken that prevent the recurrence of the event. (Preventive actions must address root and contributing causes.) Qualified Team: The natural team, including other individuals, who can provide necessary resources to understand the problem, or can help in the root cause analysis and corrective action process. Root Cause: The fundamental reason for an event. (The last cause in the chain.) Root Cause Analysis and Corrective Action Process: An effective process for finding the true or actual cause of events, facilitating effective corrective action and preventing their recurrence. Specific Corrective Action: Action(s) taken to correct the direct cause and the effect. Module 7 page 3