PPI NIOC Pars Oil & Gas Company South Pars Gas Field Development – Phase 19 1 Load Out of Jacket 19C Offshore Facilities Load Out of T.D.A.D.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

LEUCEMIA MIELOIDE AGUDA TIPO 0
FIRST RF Corporation Antenna & RF Systems Technologies 1 Proprietary/Competition Sensitive Data Data Summary M:\010 - SBIR Programs\SBIR Programs Phase.
§ 1.10 Properties of the Real Number System. Angel, Elementary Algebra, 7ed 2 Commutative Property Commutative Property of Addition If a and b represent.
Slide 1 Insert your own content. Slide 2 Insert your own content.
McGraw-Hill©The McGraw-Hill Companies, Inc., 2003 Chapter 9 Logical Link Control.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 3.1 Chapter 3.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 4 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Chapter 43 - The Urine Concentrating Mechanism and Urea Transporters Copyright © 2013 Elsevier Inc. All rights reserved.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 14.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
0 - 0.
ALGEBRAIC EXPRESSIONS
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING Think Distributive property backwards Work down, Show all steps ax + ay = a(x + y)
Teacher Name Class / Subject Date A:B: Write an answer here #1 Write your question Here C:D: Write an answer here.
Addition Facts
ALGEBRAIC EXPRESSIONS
Fair Trade and Chembakolli. ActionAid schools | February 2012 | 1.
ZMQS ZMQS
Transportation of Goods by Water By: Kris Narayan 4 th Grade Science Project Mrs. Babinchak.
Micro Focus Research 1 As far as youre aware, how does your organization plan to drive business growth over the next three years? (Respondents' first choices)
Photo Composition Study Guide Label each photo with the category that applies to that image.
Problem # Problem #
A university for the world real R © 2009, Appendix A The Order Fulfillment Process Model Marcello La Rosa Stephan Clemens Arthur.
ABC Technology Project
Forth Estuary Forum 28th Nov 2013
TV Show Trivia Princeton Puzzle Hunt Do NOT flip over your answer sheet!
M E T R O P O L I T A N W A S H I N G T O N A I R P O R T S A U T H O R I T Y 1 Mobility Challenges at Washington Dulles International and Ronald Reagan.
© S Haughton more than 3?
5.9 + = 10 a)3.6 b)4.1 c)5.3 Question 1: Good Answer!! Well Done!! = 10 Question 1:
Twenty Questions Subject: Twenty Questions
10/5/2013Multiplication Rule 11  Multiplication Rule 1: If a > b and c > 0 then a c > bc Examples If 7 > 3 and 5 > 0 then 7(5) > 3(5) If 2x + 6 > 8 then.
Linking Verb? Action Verb or. Question 1 Define the term: action verb.
Squares and Square Root WALK. Solve each problem REVIEW:
Energy & Green Urbanism Markku Lappalainen Aalto University.
Edit this text for your title
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Properties of Exponents
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Event 4: Mental Math 7th/8th grade Math Meet ‘11.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
Week 1.
We will resume in: 25 Minutes.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Fact Families By: Gianna Boland.
WHAT KIND OF CHALLENGES Mogens Zoll Hundahl Esbjerg, 19 th August 2014.
Regulations in the North Sea Keith Mayo, Head of Offshore Decommissioning, DECC, UK Date 1/2 October 2009.
Phase Difference = Phase Difference = 0.05.
Overview of Oil & Gas Sector The following slides are not a tutorial but merely an overview of the various phases involved in an oil & gas development.
PHASE 7 FACILITIES ENGINEERING
Heavy Lift Offshore Conference- RINA 2008 –Float Over Method FLOATOVER.
Presentation transcript:

PPI NIOC Pars Oil & Gas Company South Pars Gas Field Development – Phase 19 1 Load Out of Jacket 19C Offshore Facilities Load Out of T.D.A.D

PPI NIOC Pars Oil & Gas Company South Pars Gas Field Development – Phase 19 2 Transportation of 19C Jacket Offshore Facilities 19C Jacket alongside of Oceanic 5000

PPI NIOC Pars Oil & Gas Company South Pars Gas Field Development – Phase 19 3 Offshore Facilities Cutting of Sea fastening items Ballasting of AB-110 (3.5%)

PPI NIOC Pars Oil & Gas Company South Pars Gas Field Development – Phase 19 4 Offshore Facilities Upending

PPI NIOC Pars Oil & Gas Company South Pars Gas Field Development – Phase 19 5 Offshore Facilities Upending

PPI NIOC Pars Oil & Gas Company South Pars Gas Field Development – Phase 19 6 Offshore Facilities Piles Transportation Installation of piles

PPI NIOC Pars Oil & Gas Company South Pars Gas Field Development – Phase 19 7 Offshore Facilities Installation of piles

PPI NIOC Pars Oil & Gas Company South Pars Gas Field Development – Phase 19 8 Offshore Facilities Installation of piles

PPI NIOC Pars Oil & Gas Company South Pars Gas Field Development – Phase 19 9 Offshore Facilities Preparing of T.D.A.D for Installation

PPI NIOC Pars Oil & Gas Company South Pars Gas Field Development – Phase Offshore Facilities Barge Bumper Installation

PPI NIOC Pars Oil & Gas Company South Pars Gas Field Development – Phase Offshore Facilities Transition Piece

PPI NIOC Pars Oil & Gas Company South Pars Gas Field Development – Phase Offshore Facilities SP 19C: TDAD Installation

PPI NIOC Pars Oil & Gas Company South Pars Gas Field Development – Phase Offshore Facilities