Aquatic Center Rock Excavation Status

Slides:



Advertisements
Similar presentations
Twin Cities Army Ammunition Plant 2007 Remedial Actions at TCAAP Site C Excavation/Stabilization/Disposal of Contaminated Soils, Placement of Soil Covers,
Advertisements

Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
Plot Plans & Legal Descriptions. Site or Plot Plans  A plot or site is an area of land generally one lot or construction site in size  The term plot.
EDT 51-Floor Plan Design1 CHAPTER 12 Legal Descriptions and Site Plan Requirements Sacramento City College EDT 51 Kenneth Fitzpatrick, P.E.
Chapter 3 Measuring Excavation and Sitework
Rapid Project Identification and Conceptual Design for Green Infrastructure Dan Cloak, P.E.April 8, 2015.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
City of Fargo Meadow Creek Area Flood Risk Management – Project 5944 Public Information Meeting June 21, 2010.
Stevens-Rugg Brook: Diversion Structure Improvement Alternatives St Albans, Vermont.
Detention Basin Saw Tooth Outlet Structure. Detention Basin Water Flow In Saw Tooth Outlet Structure On Site Water Off Site Water.
Gwinnett County’s Post Development Stormwater Management Program
Abstract Upland areas of the Willamette Basin are associated with a long history of logging and related road construction. Sediment derived from forested.
CONSTRUCTION UPDATE The Knightsbridge Residences at Century City Century Properties - July 2009.
Yung Loo FCC: GIS & Tunnelling Update.
Mike Baumann Statewide Utility Engineer January 22, 2015.
Lets and Quantities Report Mark Wolfgram Division of Transportation Investment Management Wisconsin Transportation Builders Association Annual Meeting.
Creation of MS4 Regulations Green / Tradewater River Basin Team Henderson, Kentucky Prepared by Henderson Water Utility April 22, 2008.
Chapter 12 Legal Descriptions and Site Plan Requirements.
Construction Report January 19, Projects Track replacement and turf In Progress Walking tracks: Recommendation Water wells March 2010 Bleachers.
Proposed Dwayne Lane Dealership Reference Slides.
© 2015 EarthCon Consultants, Inc. All rights reserved. This material may not be reproduced, displayed, modified or distributed without the express prior.
Peabody Coal Lower Basin Pipeline Engineering Appraisal Study Bureau of Reclamation September 18, 2002.
Nathan Davis Steven Reid Kristen Ulmer Graduate Assistant: Nathan Dye.
Community of Aspendell (Elev. 8400) Bishop Creek Area, Inyo County, CA MAIN PROJECT OBJECTIVES Replace existing sewer pipe and install new PVC sewer pipe.
DECEMBER 12, 2012 NEWPORT BEACH COUNTRY CLUB Application No.: Item: W 11a.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Geotechnical Conditions Tom Joos Civil/Structural Engineer BNL Plant Engineering.
1 Understanding Sources of Error and Uncertainty NOAA’S COLORADO BASIN RIVER FORECAST CENTER.
TRENCHING & EXCAVATION
BUILDING STRONG ® Rock Removal on the Middle Mississippi River 1 RRAT 2014.
Deep Underground Science and Engineering Laboratory at Homestake1 Richard DiGennaro, LBNL DUSEL Project Manager 20 June 2008 Facility Planning for DUSEL.
NE Drought Conditions CARC Update: November 17, 2015 Brian Fuchs National Drought Mitigation Center University of Nebraska-Lincoln School of Natural Resources.
Department of Public Works Submittal of Comments to the County of Los Angeles on the Draft Environmental Impact Report and Proposed Alternatives for the.
Seventh Edition By David A. Madsen, Terence M. Shumaker, and David P. Madsen Civil Drafting Technology Chapter 12 Earthwork.
BATTERY PARK CITY. BATTERY PARK CITY IS A 92-ACRE (0.37 KM 2 ) PLANNED COMMUNITY AT THE SOUTHWESTERN TIP OF LOWER MANHATTAN IN NEW YORK CITY.
Addison Grove (Sam’s Redevelopment) City Council Meeting January 26,
Bancroft Elementary School School Building Committee Meeting February 24, 2010.
Open Mining vs Underground Mining March 19th World Geography.
GEOLOGY RECOMMENDATION SHEET GEOLOGY NOTESGEOLOGY RECOMMENDATIONS WYOMING DEPARTMENT OF TRANSPORTATION MATERIALS TESTING LABORATORY PROJECT __________________________________.
Chapter 2 Reading Site Plans. Chapter Overview Introduction to Reading Site Plans Understanding Legal Descriptions Site Plan Fundamentals Topography Reading.
Septic System Overview
Sinclair Wash Stream Restoration Feasibility Study
Town of Brighton, Department of Public Works
REPORT ON URBAN SETTLEMENTS DEVELOPMENT GRANT
Nunavut Water Board Public Hearing
Big French Creek Slide Timeline of Events
Construction Mr. O’Rourke
$150K Chicago/ANL seed funding for Braidwood site investigation
Site Grading Site Grading Civil Engineering and Architecture
Objectives Upon completion of this module you should be able to:
Washoe County Board of Adjustment
Site plan The plat map A plat map is the first step in development of a site plan. It delineates property lines with bearings, dimensions, streets, and.
The Woodlands - a Totally Planned Community
IA 122 RECONSTRUCTION PRE-BID MEETING
Town of Melbourne Beach
Before The hardwood in the ceiling gave a warm feeling to the pool.
The Woodlands - a Totally Planned Community
Louisville District IDIQ Forecast

Rock Trenching vs. Blasting Methods
Department of Environmental Quality
Reedy River Basin Sewer Tunnel Project Update
Introduction Persons engaged in surveying are often called to determine volumes of various types of material. The most common unit of volume is cubic having.
Introduction Persons engaged in surveying are often called to determine volumes of various types of material. The most common unit of volume is cubic having.
Chapter 6 Site Construction.
WSUP Arrowcreek Middle School Grading
Steps To Prepare Site For Site Work Construction Calhoun GA.
Town of Broadway Fiscal Year 2020 Budget May 7, 2019.
WSUP The Club at ArrowCreek Grading
How Excavation Companies Help You In Construction Projects In Ooltewah, TN.
Presentation transcript:

Aquatic Center Rock Excavation Status

Rock encountered at elevations higher than anticipated in design and geotechnical report. SCI Report States: “We do not anticipate that rock excavation will be required for construction of the proposed pools; however, due to the varying elevations of the rock encountered, rock pinnacles may be encountered between the boring locations….Based on the proposed grades, we anticipate that rock excavation and/or blasting will be required within a portion of the proposed detention basin.”

Quantity of rock broken and removed for pool and infrastructure excavation as of January 3rd – 1267 cubic yards Fiscal impact of rock broken as of January 3rd - $190,074.00 Bulk of remaining rock anticipated in storm sewer trench excavation

Site Map Showing Exposed Rock Elevations vs. Boring Elevations

Site Photos – Dive Pool From Pool MH 12-27-12

Dive Pool Rock Excavation Complete 12-27-12

Dive Pool to Pool MH Taken 1-9-13

Rec Pool 12-27-12

Lazy River 12-27-12

Storm Line Near AI 1-4 Taken 1-9-13