week coordination report 15/06/2018

Slides:



Advertisements
Similar presentations
RUN COORDINATOR’S REPORT March 2006 Thomas Schörner-Sadenius Universität Hamburg ZEUS Monday Meeting DESY, 27. März 2006.
Advertisements

High Gain Mystery of WS(1-5) Solved (Hopefully…) C.Woody HBD Meeting April 13, 2010.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
Highlights fro TR Collaboration meeting CERN 12/11/2012.
SPS start up 2014 SPS OP. SPS changes during LS1 New transformers and 18kV cables for MPS. New function generators (FGC’s) with lots of new and different.
Weekly Coordinator report July 30 th – August 6 th Murphys Law: If anything can go wrong, it will. Eric’s Observation: Catastrophies coming in sequentially,
L1Calo Operations Summary
STATUS OF KLOE F. Bossi KLOE GM, ROMA Nov. 13/14.
PS status 10 August – 17 August 2017
Operation of CSC DCS Ryan Carroll Carnegie Mellon 29-Sept-2009.
MODULE QUALIFICATION STATUS AT LIVERPOOL
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Shift instructions August 16, 2017 Antoni Aduszkiewicz
Transfer line test: Beam stability measurements
Week coordinator report - C. Marchand
Calendar 2017.
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Days of the week NEXT.
Summary Friday h38: Ramp down and pre-cycle.
DT Infrastructure: LV, HV, Gas
Tuesday 11th September LHCb dipole presently fault off
Alexander Herlert, CERN (PH-SME-IS)
Days of the Week Les docs d’Estelle –
Wednesday 5th September - morning
Monday 11/07: Recovery Plenty of accesses.
Summary of ion week 48 Last beam OP summary of 2010 Week 48
DAYS OF THE WEEK.
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Monday 6th August & night
Time management School of Rock.
JANUARY 2018 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
Sunday Monday Tuesday Wednesday Sunday Monday Tuesday Wednesday
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
My ‘Proposal’ is to turn one of these photos…
Use of Beam Loss Monitor type detectors in CNGS muon station
Thursday morning 09:30 Dump of pPb fill.
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Week 35 – Technical Stop and Restart
Friday 11/5 08:00 RF communication problem solved. Ready to inject but beam not available from the injectors. Injection line collimators opened from 4.5.
Sunday
Sunday/Monday & :30 Stable beams. Fill #1851.
Wednesday Ramp single nominal bunches for loss maps
Aims for the week Recover from technical stop and precycle at 10A/s
Several Ad-Supported TV Shows & Sports “Own” Specific
Days of the Week Monday Tuesday Wednesday Friday Thursday Saturday
JANUARY 2018 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
Monday, FEBRUARY 12, Day 115 Welcome back! I hope you had a great weekend! For today, you will return to your old groups. Please quietly distribute.
Runprogram: Survey Report
| January Sunday Monday Tuesday Wednesday Thursday Friday
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
At Least Two-Thirds Of The Top 10 Trending Topics
Sat morning Until 12:40: Loss maps at injection
Time 1.
Contact
Week of November 4-8, 2013 Warm-ups.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
2011年 5月 2011年 6月 2011年 7月 2011年 8月 Sunday Monday Tuesday Wednesday
Tuesday 20 September 2011.
Thursday
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Coordination: Eva Barbara Holzer, Mike Lamont
Weekend Summary Friday Saturday Sunday C. Gemme, INFN Genova,

Wednesday 26 October 2011.
Wednesday morning / afternoon
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Wednesday 6.10 Morning: Quench test at 450 GeV
Saturday 26 November 2011.
January Monday Tuesday Wednesday Thursday Friday Saturday Sunday 30 31
Presentation transcript:

week coordination report 15/06/2018 Fulvio Tessarotto INFN Trieste

no MD

SPS beam intensity on T6 my week previous week

Summary: reasonable week No big safety problems No major disasters No epic failures No general power cut No polarization loss No flood … Only few major problems Mostly normal data taking

Main problems: Low beam intensity and beam instability on weekend Straw CATCH problem on Sunday MP missing regions or reload failure Jura Norma-bar power cut on Wednesday (Straw) Several CAEN HV crate failures (SY527 failure on Wednesday) MWPC PS01V1 F/E card intermittent Pixel MM occupancy variations: inefficiency and noise RICH WALL F/E card Some GEM occupancy problems

Friday, June 8th 12:30 PT going to frozen spin mode (P: +78.10,-79.65) No beam until 16:30 11:30 Beam line magnets on, with new values: B8 at 420 A (was 454 A), B9 at -291.5 A (was -250 A) 12:30 PT going to frozen spin mode (P: +78.10,-79.65) 12:50 SM1 and SM2 on; failure of QUAD27 15:50 LN2 buffer dewar in pump-room filled; 17:46 set 500 mm target, data taking started

Good starting values for the target polarization

Straw, DC cooling Change of beam position as seen by SciFi01 DC frame T increase, due to water cooling system problem 20:06  access for fixing it (Vincent)

Saturday, June 9th 04:30 Pixel MM: srcID LOAD –A 380 fails. 01:14 Straw HV trip 3Y1_DL07, related to beam spike (at end of spill) 04:30 Pixel MM: srcID LOAD –A 380 fails.

GEM Spill profile problem

Sunday, June 10th RICH WALL problem MP pathologies. low beam intensity, smooth data taking RICH WALL problem MP pathologies.

Monday, June 11th Straws: CATCH problem  access and unplugging catch module Straw trip, possibly related to beam spike (at end of spill) HV crates turned off by themselves: During run 283649 HV crate for H1 and RICH turned off  put back on During run 283650 HV crate for DC01 and MM off  put back on Bad spill shape (spikes at end of spill or at beginning of spill): CCC called  extraction improved DCS communication problem  crate restarted

Tuesday, June 12th Errors reported: DAQ crash (03:00 -03:30) PMM 382, 380 MWPC DC 259 CAEN HV crate HOD_CCR1 stuck:  put back on by Christoph in 888

Reasonable beam intensity yesterday, no beam from 22:00 to 22:50. ~1.5 h unstable during the night, no beam from 09:40 today!

Access from ~10:00 to 11:00 for MWPC for checking the connenction on CATCH PA03X1 PA04X1

Wednesday, June 13th

Straw status:

Other problems:

Failure of the HOD_CCR2 HV-Crate: At ~ 17:00 DCS communication to CAEN HV-Crate CCR2 lost Christoph + Moritz performed intervention Burned electronic smell; CAEN SY527 crate could not be restarted (dead); Channels of HO03 and HO04 moved to neighboring CAEN SY1527 crate (previously used for CAMERA) Channels of Veto Outer 1 moved to CCR7 crate Mapping in DCS changed and old references loaded 4 channels needed further (long) work to be restored to normal conditions All channels fully working at ~21:00 Alignment runs taken during HV channels change

Thursday, June 14th Reasonable average beam intensity, Few short interruptions, Strange substructure

Periodic structure with: ~8 min higher intensity, ~5 min lower intensity (~5% less)  Related to LHC MD ~13 min period

Friday, June 14th Smooth data taking Fi03X1 inefficient? Usual MP problem, solved by LOAD –ra 382

Almost 100 good DY runs collected during this week

Good luck, Antoine!