LCLS Controls and Conventional Facilities

Slides:



Advertisements
Similar presentations
Kathleen Ratcliffe BC2/Linac Installation April 16, BC2 / Linac Installation Coordination Kathleen.
Advertisements

Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
Ernest Williams FAC November 2008 Control Systems Software Section 1 Controls System Installation Status Ernest Williams for Controls Department.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
LTU & Electron Beam Dump Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Technical Design.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
David Saenz CF Oct 30, CF MEP Commissioning.
Richard M. Boyce FAC October 29-31, Installation Planning Integration process – IMT update Installation Planning &
Jo Beth Folger FAC - CF Breakout – Sector April 8, Sector 20 Project Overview Sector 20 Site Plan Description Schedule.
Dayle Kotturi Facility Advisory Committee Meeting October 12, 2004 Injector/Linac Controls An overview of the status of each of.
C.E. Rago Inj/Lin Design & 4_20_06 1 Injector / Linac Design & Fabrication C.E. Rago FAC Review 04_20_06.
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Material Disposition Planning Olga Ligeti Radiation Protection Department MARCH 24, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
SLAC NLC & ILC Cost Modeling Ray Larsen January 28, 2006.
Patrick’s Updates - 8/30/11 (one slide for each of the following) 1.XTCAV Project 2.ASTA Gun Test Facility Instrumentation & Controls 3.Fast wire scanner.
WBS – 30 Straight Section Reconfiguration g-2 Accelerator – 30 Straight Section Reconfiguration D. Still Fermilab Muon g-2 IDR, June 5-7.
LCLS MD Downtime William Colocho June 2014 to June 2016.
Conventional Facilities and Siting Global Group (ARCFS)
2K Cold Box PDR Introduction
Maintain a single control room for all accelerator programs
Injector Performance Requirements Conventional Facilities Update
CF Organization & Schedule
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
LCLS Injector: Introduction D. H
LCLS Linac Update Brief Overview L1 & BC1 Progress LTU & E-Dump Status Continuing Resolution Impact.
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
Meeting of the LCLS Facilities Advisory Committee
Sector 20 Project Overview
Far Experimental Hall Hutches Civil Construction
Far Experimental Hall Hutches Civil Construction
J. Seeman Assistant Director for PPA/LCLS
e-Beams Systems Update
Installation of Photon Beam Transport to FEH
Electron Beam Systems ETC and Methodology
Injector / Linac Installation Current Status
Undulator Controls Breakout
Conventional Facilities (WBS 1
Far Experimental Hall - Hutches
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
Linac LLP Outline LINAC Long Lead Procurements
Conventional Facilities WBS 1.9
Extraction Michael Bevins May 17, 2007
LCLS Undulator System Production Management
2007 Downtime Controls Installation
Conventional Facilities Status
Shutdown Planning & Installation Schedule
LTU/Undulator Installation Status
Control System Overview Hamid Shoaee LCLS Control System Manager
Installation Status & Operational Readiness Process
Department Of Energy Review Linac Coherent Light Source Project
Injector/Linac Design Status C. E
LCLS e- Beams System Overview
Physics Requirements for Conventional Facilities
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
CF Scope, Management & Organization
BC2 / Linac Installation Coordination Kathleen Ratcliffe
LINAC System Engineering / Design Status C.E. Rago
LCLS Control System Personnel Linac & BC2 Controls progress
LCLS e- Beams Systems Manager
CMGC Overview SLAC Site Plan Systems Description Construction Schedule
Injector/Linac RF Status
Presentation transcript:

LCLS Controls and Conventional Facilities Mario Ortega, SLAC LCLS - Controls

Controls Breakout – Conventional Facilities (CF) Overview Where WBS 1.9, 1.2.4.4 & 1.3.4.4 meet Injection & Linac Front-End Rack Complex Linac Sectors 21-30 AC Distribution BTH Additional Support Buildings Rack Specification Cable plant Issues

LCLS Controls and Conventional Facilities Technical considerations for LCLS Controls by CF: CF tasked with providing Enclosure, Power, Water, HVAC, Lighting etc. Preliminary Design begins with Physics and Mechanical input MADD Deck Beamline Schematic Movement from Title I (Prelim Design) to Title II (Detail Design) Input from Controls needed to make the leap Controls equipment in some instances require close proximity to beamline devices. Equipment parameters force rack placement CF cannot determine this independently Rack placement(s) drive Building and Tray design

LCLS Injection- CF Sector 20 In advance stage of design – Clearing design with Citizen Committees prior to being let to bid. Demolition of existing racks and cable underway Racks emptied and devoid of cable. AC power last vestige prior to removal. Controls Rack & Tray design holding firm RF Hut height/ Size restriction forces rack mods More details pending to “flesh out” rack profiling

Sector 20 Gallery Rack Locations -Racks service both Injection and Linac Front End (thru BC1) BPM & Timing Racks Magnet Power Supply Racks RF Racks RF Hut (Temperature Controlled) PPS, Vacuum and Diagnostics Racks

LCLS Linac- Sector 21-30 This area nearly unmolested with the exception of: Instrumenting thru BC1 to Injection racks Instrumenting BC2 in Sector 24 New Control system overlaying old CAMAC installation. New BPM modules likely resident. VME Crate installations to support BPM with 3 crates per Sector (all) Major impact on marginal AC service. Power survey idea forwarded. Problem since ~1985 when SLC followed by PEP added.

Sample Sector AC Distribution 2ea 100A Breakers Sample Sector AC Distribution 100A Buss 100A Buss 50A Breaker 50A Breaker 50A Breaker 50A Breaker

LCLS Linac CF-BTH BTH (Beam Transfer Housing) Support Buildings Recommended Number and Location determined Locations principally determined by beamline device operating parameters. i.e. BPMs within 150’ of module. Vacuum gauging and Valve Control clustered for MPS Mitigate cable install cost variables (RS Means- Electrical Cost Data) Subject to CF review (comment?)

LTU/BTH Instrument Centers (RSY WALL (935’) to UNDULATOR (1673’)) B406: Sta. 1008’ BPM-2 BPMDL3,BPMT32 PROF-1 OTR30 VACP-8 #9, #10, #11- #16 SUPPORT BLDG #1: Sta. 1160’ BPM-6 BPMDL34, BPMT42, BPMEM1, BPMEM2- BPMEM4 RFBPM-1* RFB01 BLMO-3 BL31-BL33 COLL-3 CEDL3,CX31, CY32 TORO-1 IM36 SUPPORT BLDG #2: Sta. 1360’ BPM-4 BPME31, BPME32, BPME33, BPME34 RFBPM-1* RFB02 PROF-1 OTR33 VACV-5 VV941, VV1123, VV1305, VV1487, VV1669 VACP-8 #17, #18- #24 VCCG-8 VCG990, VCG1081, VCG1170, VCG1262, VCG1354, VCG1445, VCG1536, VCG1627 VACG-8 VG990, VG1081, VG1170, VG1262, VG1354, VG1445, VG1536, VG1627 WIRE-4 WS31, WS32, WS33,WS34

LTU/BTH Instrument Centers (cont.) SUPPORT BLDG #3: Sta. 1573’ BPM-6 BPME35, BPME36, BPMUM1- BPMUM4, RFBPM-6 RFB03, RFB04-RFB08 PROF-1 PRTUND1 (TDUND1) COLL-4 CX35, CY36, CX37, CX38 TORO-1 IMUNDI LEGEND: Bold = upstream of penetration Vacuum nomenclature (minus pumps) = device prefix + station number This listing is derived from two documents : LIN COHERENT LIGHT SOURCE LTU DEVICE SCHEMATIC SD-380-036-01 Check Print dated 12-03-2004 Ordinal List 08_14_04

Proposed new Equipment buildings The BTH Housing ..the last 2/3rds of the LTU RSY Berm Proposed new Equipment buildings Research Yard Wall

LCLS Racks Rack Specification has been drafted. Revision pending to include lower height RF Hut racks 38U (66.5”) vs. Standard 48U (84”). Rack drawings exist (minus short racks) Preliminary review to follow CF work. Final Review to follow that with Spec and drawings to comprise Bid Package. Vendors willing to aggregate rack orders with different deliveries for cost saving purposes even though its likely to be in excess of 12 months between deliveries.

LCLS Cable plant Systems Engineers specify cable to be used both internal and external to racks Long Haul Cable subject to SLAC policy As to type, labeling and rating SLAC looking towards use of LSNH A product limited in domestic manufacture More cost = greater safety (particularly in inhabited tunnel areas) Responsible for the ordering or securing possession of external lab cable material prior to cable install contract.

LCLS- Controls & CF Conclusions CF supplied preliminary rack and power details Working the problem is high priority System designs are in preliminary stages Some labor was drawn off to “Start up” machine Linac (S21-S30) AC power can be “Big Ticket” if service is as marginal as understood. Now working with Javier Sevilla, PE on this matter. Survey of existing AC service for Controls while operating proposed. Advancing Rack Spec to approval and on to bid.