Standardisation/Harmonisation

Slides:



Advertisements
Similar presentations
Intercalibration Guidance: update Sandra Poikane Joint Research Centre Institute for Environment and Sustainability.
Advertisements

WG 2A ECOSTAT Meeting 4-5 March 2004 Meeting of the WFD CIS Working Group 2A ECOSTAT summary Presented by Anna-Stiina Heiskanen Joint Research Centre The.
Updating the intercalibration process guidance Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Working Group 2A ECOSTAT Finalisation of the intercalibration register Presented by Wouter van de Bund Joint Research Centre Institute for Environment.
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
DG Environment, Unit D.2 Marine Environment and Water Industry
Intercalibration excersice progress report Presented by Palle Haastrup Joint Research Centre Institute for Environment and Sustainability Inland.
Common Implementation Strategy for the Water Framework Directive Working Group A ECOSTAT Ecological Status 7th Meeting Stresa, Lago Maggiore, Italy
WG 2.B Integrated River Basin Management
Synthesis of the intercalibration process Working group 2.5.
Working Group 2A ECOSTAT Objectives & Agenda of the meeting March 2005
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Improving assessment of GES Draft conclusions and Way forward
CIS General progress report WD meeting 16 June 2008 Jorge Rodríguez Romero, Unit D.2, DG Environment, European Commission.
Review of Decision 2010/477/EU and MSFD Annex III
Task 1 - Intercalibration WG 2A ECOSTAT - Intercalibration
Progress report Working Group D - Reporting SCG meeting May 2008 Unit D.2 Water and the Marine - WFD Team.
CIS work programme Ad-hoc activity on Economics
Review of Decision 2010/477/EU and MSFD Annex III
Working Group A Ecological Status - ECOSTAT WFD CIS Strategic Coordination Group meeting, October 2005 Progress in the intercalibration exercise.
Task on harmonization WFD Annex V 1.3.6
JRC-Institute for Environment and Sustainability
Water Directors’ Meeting Common Implementation Strategy
Harmonisation Activity Progress report
Intercalibration Timetable
Progress report Working Group D - Reporting SCG meeting May 2008 Unit D.2 Water and the Marine - WFD Team.
Discussion agenda Summary & proposals (30 min)
Strategic Planning Timeline Overview
Common Implementation Strategy for the
Chemical Monitoring Activity (CMA) ( )
Update on progress since last WG meeting (13-14 June 2002)
Meeting of the WFD CIS Working Group 2A ECOSTAT Introduction & objectives Presented by Anna-Stiina Heiskanen Joint Research Centre The Institute.
Working Group A Ecological Status - ECOSTAT State of play in the intercalibration exercise Water Directors Meeting, November 2005.
WG GES, 6 December 2016, Brussels
Draft Mandate and Proposed Approach for the Drafting Group on
Progress Report Working Group A Ecological Status Intercalibration (1) & Harmonisation (3) Activities Presented by Anna-Stiina Heiskanen EC Joint Research.
WFD – CIS Working group A ECOSTAT
WG 2.B Integrated River Basin Management
Activities of WG A Ecological Status
WG A Ecological Status Progress report April-October 2009
Water Directors meeting Mondorf-les-bains, June 2005
EU Water Framework Directive
Harmonisation and standardisation – Status and way forward
Working Group A ECOSTAT progress report on Intercalibration Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
ECOSTAT 2013 – 2015 Tasks and Deliverables
Water Directors meeting Warsaw, 8-9 December 2011
Water Directors meeting Spa, 2-3 December 2010
WG E on Priority Substances
Action points Who When WG GES 31 March March 2017
River groups with extension
WG A ECOSTAT Intercalibration guidance : Annexes III, V, VI
CIS Work Programme Initial suggestions from WG F
CIS Work Programme WFD Team, DG ENV.D.2, European Commission.
Activity on Eutrophication
Working Group A Ecological Status - ECOSTAT WFD CIS Strategic Coordination Group meeting, 22 Febraury 2006 Progress Report.
State of Play of TAFTIE Task Force
Common Implementation Strategy for the
WG A Ecological Status Progress report April-October 2010
EU Water Framework Directive
Reporting template for milestone reports
Common Implementation Strategy for the
Planning to develop the CIS Work Programme
WFD CIS WG ECOSTAT meeting on 8-9 October 2007 Objectives What do we need to achieve during this meeting?
Harmonisation Activity Progress report
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
EU Water Framework Directive
EU Water Framework Directive
WG A Ecological Status Progress report October 2010 – May 2011
Calendar Overview – Phase I – REVISED April 2019
Presentation transcript:

Standardisation/Harmonisation CEN standards in development will be made available to ECOSTAT through CIRCA Task group will produce proposal with standards proposed to be included in WFD annex V end March - comments by mid April Will go to WFD committee meeting in May for first discussion CEN will discuss document at their meeting in June Update at next June ECOSTAT meeting Revised version for SCG and Committee in October This issue will be proposed to be included in next CIS work program.

Intercalibration timetable Proposed timetable accepted - WG acknowledges that it must be kept to finalise in time Next ECOSTAT meeting could be held later – JRC will investigate possibilities

Future intercalibration Need to be precise on what can be finalised in the current phase [overview table will be annexed to the paper] Important to keep momentum - work that is already far advanced should continue without a break Need for a constructive break: period of consolidation, reflection, preparation of the remaining work Need to assess the precision and the quality of the current intercalibration work (even elements included in the 2006 report may need additional work)

Future intercalibration Different parts of the work at the appropriate time What is appropriate time needs to be determined by GIGs ; this may be several years from now for some QE – but it is important to ensure that data and research needs are met in the meantime research needs need to be highlighted both at national and European level – recommendation for FP7 transparency and communication needs to be a priority throughout the process

JRC will update discussion paper with ECOSTAT comments and overview table of GIG progress 24 March Written comments from ECOSTAT on the paper by April 21 Paper presented to SGC/ Committee (15-16 May)